← Back
BuildNYC
Miscellaneous two family
8866 BAY 16 STREET
BROOKLYN · Bath Beach · BIN 3169603
💬 Discuss this project
1960Year Built
3Stories
B9Building Class
R5Zoning
2,280 sfGross Floor Area
2Units
Miscellaneous two family · 1,937 sf lot · 1.18 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 15p · 1 filing · 18 docs
Cellar5p · 1 filing · 18 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/07/2024$1.2M—Private party → Private party$535/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LCW Engineering406/17/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A7 Construction ServiceGeneral Contractor303/21/2026
Catman PlumbingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
LCW Engineering1103206/17/2024
Building Lifecycle
07/16/2024
Signed off — Alteration
Interior renovation with new partition walls, kitchen cabinet and flooring. No change to the use, egress or occupancy.
B01026104-I1
07/15/2024
Signed off — Alteration
Interior renovation with new partition walls, kitchen cabinet and flooring. No change to the use, egress or occupancy.
B01026104-S1
07/15/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
06/28/2024
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
06/17/2024
Filed — Alteration
Interior renovation with new partition walls, kitchen cabinet and flooring. No change to the use, egress or occupancy.
B01026104-P2
16 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offCatman Plumbing04/08/2024
DOB NOWGeneral ConstructionSigned-offA7 Construction Service04/04/2024
1 project · most recent 06/21/2024
General Wiring
FiledStatusContractorScope
06/21/2024CompleteW 8 ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
07/15/2024Pass-Final General Construction Non-Directive 14PassView ↗
06/28/2024Fail-Final General Construction Non-Directive 14FailView ↗
05/14/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/14/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/10/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
06/17/2024Fire-Resistant Penetrations and Jointsluis wongspecial
06/17/2024Energy Code Compliance Inspectionsluis wongprogress
06/17/2024Interior lighting powerluis wongenergy_progress
06/17/2024Fire-Resistant Penetrations and Jointsluis wongspecial
06/17/2024Energy Code Compliance Inspectionsluis wongprogress
06/17/2024Interior lighting powerluis wongenergy_progress
18 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account