1958Year Built
1Stories
M9Building Class
R3-2Zoning
16,628 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Miscellaneous religious facility · Owner of record: REHOBOTH OPEN BIBLE CHURCH, INC. · 18,000 sf lot · 0.92 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Roof4p · 2 filings · 20 docs
Floor 15p · 1 filing · 8 docs
Mezzanine9p · 3 filings · 20 docs
Cellar9p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
REHOBOTH OPEN BIBLE CHURCH3407/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BUILDING ENGINEERING SYSTEMS PLLC1102/05/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ARCHVISION DESIGN STUDIO1103/21/2026
D W G SERVICES1103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RKA PIPING AND HEATINGPlumbing307/08/2026
PEAK FIRE PROTECTION LLCFire Protection207/08/2026
J & A COOLING LLCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
OUTSOURCE SPECIAL INSPECT2827402/05/2024
AA BUILDING & INSPECTION1519102/28/2023
Building Lifecycle
All (20)Filed (11)Permit Issued (6)Signed Off (3)
03/28/2024
Signed off — Alteration
INSTALLATION OF NEW MECHANICAL HVAC DUCT WORK IN EXISTING CHURCH; INSTALLATION OF FOUR NEW GAS FURNACE HVAC UNITS; INSTALLATION OF THREE HEAT [PUMPS AND ONE SPLIT SYSTEM ON FGIRST FLOOR ROOF. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00459417-I1
02/05/2024
Filed — Alteration
INSTALLATION OF NEW MECHANICAL HVAC DUCT WORK IN EXISTING CHURCH; INSTALLATION OF FOUR NEW GAS FURNACE HVAC UNITS; INSTALLATION OF THREE HEAT [PUMPS AND ONE SPLIT SYSTEM ON FGIRST FLOOR ROOF. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00459417-P3
12/07/2023
Signed off — Alteration
INSTALLATION OF NEW PLUMBING FIXTURES THROUGHOUT EXISTING CELLAR, FIRST FLOOR AND MEZZANINE. INSTALLATION OF NEW UNDERGROUND SEWER AND STORM DRAIN PIPING. INSTALLATION OF NEW GAS PIPE TO ROOF TOP FURNISH. INSTALLATION OF NEW BAPTISTISM POOL.
B00459419-I1
10/16/2023
Filed — Alteration
INSTALLATION OF NEW PLUMBING FIXTURES THROUGHOUT EXISTING CELLAR, FIRST FLOOR AND MEZZANINE. INSTALLATION OF NEW UNDERGROUND SEWER AND STORM DRAIN PIPING. INSTALLATION OF NEW GAS PIPE TO ROOF TOP FURNISH. INSTALLATION OF NEW BAPTISTISM POOL.
B00459419-P4
10/09/2023
Filed — Alteration
INSTALLATION OF NEW PLUMBING FIXTURES THROUGHOUT EXISTING CELLAR, FIRST FLOOR AND MEZZANINE. INSTALLATION OF NEW UNDERGROUND SEWER AND STORM DRAIN PIPING. INSTALLATION OF NEW GAS PIPE TO ROOF TOP FURNISH. INSTALLATION OF NEW BAPTISTISM POOL.
B00459419-P3
09/27/2023
Signed off — Alteration
INSTALLATION OF NEW SPRINKLER SYSTEM THROUGHOUT EXISTING CELLAR FIRST FLOOR AND MEZZANINE ALL AS PER PLAN. NO CHANGE TO USE OR EGRESS.
B00484474-I1
08/10/2023
Filed — Alteration
INSTALLATION OF NEW PLUMBING FIXTURES THROUGHOUT EXISTING CELLAR, FIRST FLOOR AND MEZZANINE. INSTALLATION OF NEW UNDERGROUND SEWER AND STORM DRAIN PIPING. INSTALLATION OF NEW GAS PIPE TO ROOF TOP FURNISH. INSTALLATION OF NEW BAPTISTISM POOL.
B00459419-P2
08/08/2023
Filed — Alteration
INSTALLATION OF NEW MECHANICAL HVAC DUCT WORK IN EXISTING CHURCH; INSTALLATION OF FOUR NEW GAS FURNACE HVAC UNITS; INSTALLATION OF THREE HEAT [PUMPS AND ONE SPLIT SYSTEM ON FGIRST FLOOR ROOF. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00459417-P2
04/12/2023
Permit issued — Mechanical Systems
B00459417-I1-MS
03/29/2023
Filed — Alteration
INSTALLATION OF NEW MECHANICAL HVAC DUCT WORK IN EXISTING CHURCH; INSTALLATION OF FOUR NEW GAS FURNACE HVAC UNITS; INSTALLATION OF THREE HEAT [PUMPS AND ONE SPLIT SYSTEM ON FGIRST FLOOR ROOF. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00459417-P1
02/28/2023
Filed — Alteration
INSTALLATION OF NEW SPRINKLER SYSTEM THROUGHOUT EXISTING CELLAR FIRST FLOOR AND MEZZANINE ALL AS PER PLAN. NO CHANGE TO USE OR EGRESS.
B00484474-P1
02/28/2023
Filed — Alteration
INSTALLATION OF NEW PLUMBING FIXTURES THROUGHOUT EXISTING CELLAR, FIRST FLOOR AND MEZZANINE. INSTALLATION OF NEW UNDERGROUND SEWER AND STORM DRAIN PIPING. INSTALLATION OF NEW GAS PIPE TO ROOF TOP FURNISH. INSTALLATION OF NEW BAPTISTISM POOL.
B00459419-P1
02/10/2023
Permit issued — Plumbing
B00459419-I1-PL
06/06/2022
Permit issued — Sprinklers
B00484474-I1-EW-SP
01/19/2022
Permit issued — Plumbing
B00459419-I1-PL
07/09/2021
Permit issued — Sprinklers
B00484474-I1-EW-SP
03/17/2021
Filed — Alteration
INSTALLATION OF NEW SPRINKLER SYSTEM THROUGHOUT EXISTING CELLAR FIRST FLOOR AND MEZZANINE ALL AS PER PLAN. NO CHANGE TO USE OR EGRESS.
B00484474-I1
02/24/2021
Permit issued — Plumbing
B00459419-I1-PL
02/19/2021
Filed — Alteration
INSTALLATION OF NEW PLUMBING FIXTURES THROUGHOUT EXISTING CELLAR, FIRST FLOOR AND MEZZANINE. INSTALLATION OF NEW UNDERGROUND SEWER AND STORM DRAIN PIPING. INSTALLATION OF NEW GAS PIPE TO ROOF TOP FURNISH. INSTALLATION OF NEW BAPTISTISM POOL.
B00459419-I1
02/17/2021
Filed — Alteration
INSTALLATION OF NEW MECHANICAL HVAC DUCT WORK IN EXISTING CHURCH; INSTALLATION OF FOUR NEW GAS FURNACE HVAC UNITS; INSTALLATION OF THREE HEAT [PUMPS AND ONE SPLIT SYSTEM ON FGIRST FLOOR ROOF. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00459417-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offJ & A COOLING LLC04/12/2023
DOB NOWPlumbingSigned-offRKA PIPING AND HEATING02/10/2023
DOB NOWSprinklersSigned-offPEAK FIRE PROTECTION LLC06/06/2022
DOB NOWPlumbingSigned-offRKA PIPING AND HEATING01/19/2022
DOB NOWSprinklersSigned-offPEAK FIRE PROTECTION LLC07/09/2021
DOB NOWPlumbingSigned-offRKA PIPING AND HEATING02/24/2021
BISEQISSUEDTEMPLE DEVELOPERS LLC05/12/2023
BIS—ISSUEDTEMPLE DEVELOPERS LLC05/11/2023
BISEQISSUEDTEMPLE DEVELOPERS LLC04/20/2022
BIS—ISSUEDTEMPLE DEVELOPERS LLC04/20/2022
BIS—ISSUEDTEMPLE DEVELOPERS LLC03/10/2022
BISPLISSUEDRKA PIPING AND HEATING12/01/2021
BISPLISSUEDRKA PIPING AND HEATING11/27/2020
BIS—ISSUEDTEMPLE DEVELOPERS LLC11/10/2020
BIS—ISSUEDTEMPLE DEVELOPERS LLC11/21/2019
BISPLISSUEDRKA PIPING AND HEATING02/06/2014
BISOTISSUEDN'S CONSTRUCTION INC11/13/2013
BIS—ISSUEDPARKWAY ELEMENTARY SCH. PRE/SCH04/13/1999
4 projects · most recent 11/14/2023
General Wiring Lighting
FiledStatusContractorScope
11/14/2023CompleteBDS ELECTRIC CORP.General Wiring
03/22/2023CompleteBDS ELECTRIC CORP.General Wiring, Lighting
03/14/2022CompleteJAM ELECTRICAL CORP—
01/15/2021CompleteINTAKE ELECT CONT CORPGeneral Wiring
Nothing on file for this building.
▾Documents — 246 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch - Plumbing5
09/01/2026B00459419-P3Request digital key ↗
09/01/2026B00459419-P4Request digital key ↗
09/01/2026B00459419-P2Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems4
09/01/2026B00459417-I1Request digital key ↗
09/01/2026B00459417-P1Request digital key ↗
09/01/2026B00459417-P2Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch2
09/01/2026B00484474-I1Request digital key ↗
09/01/2026B00484474-P1Request digital key ↗
▸Applications & Permits52
▸BISPLAN / WORK APPROVAL APPLICATION34
05/01/2025321145729Open ↗
10/11/2024321145729Open ↗
10/02/2024321145729Open ↗
Showing 3 of 34 on file for this type
▸BISWORK PERMIT APPLICATION9
06/07/2021321145729Open ↗
06/07/2021321145729Open ↗
11/27/2020321145729Open ↗
Showing 3 of 9 on file for this type
▸BISPLACE OF ASSEMBLY7
11/08/2024321208956Open ↗
08/15/2023321208956Open ↗
08/07/2023321208947Open ↗
Showing 3 of 7 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION2
11/13/2024321208947Open ↗
11/08/2023321145729Open ↗
▸Zoning, Tax Lot & Property Records5
▸BISADDRESS: NEW HOUSE NUMBER APPROVED2
09/30/2024321145729Open ↗
05/17/2024321145729Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
08/22/2023321145729Open ↗
▸BISZONING DIAGRAM1
01/27/2016321145729Open ↗
▸BISVERIFY TAX LOT1
08/22/2023321145729Open ↗
▸Seals & Professional Certifications54
▸DOB NOWProgress Inspector Seal & Signature22
08/30/2026B00459417-P2Open ↗
08/30/2026B00459417-P2Open ↗
08/30/2026B00459417-P2Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
09/01/2026B00459417-P1Open ↗
09/01/2026B00459417-P2Open ↗
09/01/2026B00459417-P3Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
08/30/2026B00459417-P2Open ↗
08/30/2026B00459417-P2Open ↗
08/30/2026B00459417-P2Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION10
11/13/2024321208947Open ↗
11/08/2024321208956Open ↗
11/08/2024321208956Open ↗
Showing 3 of 10 on file for this type
▸Trade Schedules & Equipment8
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
11/17/2015321145729Open ↗
10/07/2015321145729Open ↗
06/18/2014320904615Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
04/29/2015320904615Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
10/07/2015321145729Open ↗
▸BISSPRINKLER INSP REPORT : FP-851
01/13/2016321145729Open ↗
▸BISSCHEDULE B - PLUMBING1
10/24/2013320904615Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
10/07/2015321145729Open ↗
▸Safety & Tenant Protection6
▸BISSTREET TREE CHECKLIST4
05/12/2025321145729Open ↗
02/24/2016321276418Open ↗
12/15/2015321145729Open ↗
Showing 3 of 4 on file for this type
▸BISSTREET TREE SIGNOFF2
09/24/2024321276418Open ↗
05/09/2024321145729Open ↗
▸Environmental & Asbestos13
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
09/01/2026B00459417-I1Open ↗
09/01/2026B00459417-P1Open ↗
09/01/2026B00459417-P3Open ↗
Showing 3 of 11 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
10/24/2013320904615Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
11/22/2019321145729Open ↗
▸Energy Compliance23
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
11/22/2019321145729Open ↗
01/13/2016321145729Open ↗
10/07/2015321145729Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
09/27/2024321145729Open ↗
09/27/2024321145729Open ↗
09/27/2024321145729Open ↗
Showing 3 of 4 on file for this type
▸BISENERGY CODE COMPLIANCE INSPECTIONS2
05/21/2024320904615Open ↗
05/07/2024321145729Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
05/07/2024321145729Open ↗
▸BISLIGHTING CONTROLS1
05/07/2024321145729Open ↗
▸BISEXTERIOR LIGHTING POWER1
05/07/2024321145729Open ↗
▸BISFENESTRATION AIR LEAKAGE1
05/07/2024321145729Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
05/07/2024321145729Open ↗
▸BISINTERIOR LIGHTING POWER1
05/07/2024321145729Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
05/07/2024321145729Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
05/07/2024321145729Open ↗
▸BISFENESTRATION AREAS1
05/07/2024321145729Open ↗
▸BISEMERGENCY LIGHTING - PA1
11/13/2024321208947Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
05/07/2024321145729Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00459417-I1Open ↗
▸Inspections & Test Reports22
▸BISTECHNICAL REPORT: RESPONSIBILITY11
11/13/2024321208947Open ↗
11/13/2024321208947Open ↗
11/12/2024321208956Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
09/24/2024321145729Open ↗
11/22/2019321145729Open ↗
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION2
11/13/2024321208947Open ↗
11/08/2024321208956Open ↗
▸BISDEP Hydrant Flow Test Letter1
01/13/2016321145729Open ↗
▸BISMECHANICAL SYSTEMS1
05/07/2024321145729Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
11/22/2019321145729Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
05/07/2024321145729Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
07/03/2024321145729Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
05/07/2024321145729Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
05/07/2024321145729Open ↗
▸Approvals, Objections & Sign-offs11
▸BISSCHEDULE A - OCCUPANCY / USE5
06/06/2023321145729Open ↗
06/02/2023321145729Open ↗
09/16/2020321145729Open ↗
Showing 3 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
11/24/2015321276409Open ↗
11/24/2015321276418Open ↗
06/12/2015321145729Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
04/28/2025320904615Open ↗
▸BISFINAL1
05/21/2024320904615Open ↗
▸Cost, Insurance & Ownership10
▸BISCOST AFFIDAVIT3
11/24/2015321276409Open ↗
06/12/2015321145729Open ↗
10/24/2013320904615Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE3
06/07/2021321145729Open ↗
11/10/2020321145729Open ↗
11/22/2019321145729Open ↗
▸BISAcord 25 (Acord Certificate of Liability Insurance)2
06/07/2021321145729Open ↗
11/10/2020321145729Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW32
05/07/2024321145729Open ↗
08/22/2023320904615Open ↗
▸Filing & Intake Forms24
▸BISEFILING COVER SHEET9
11/30/2015321145729Open ↗
11/30/2015321276392Open ↗
11/24/2015321276409Open ↗
Showing 3 of 9 on file for this type
▸BISBOROUGH INTAKE FORM7
11/13/2024321208947Open ↗
06/07/2021321145729Open ↗
06/07/2021321145729Open ↗
Showing 3 of 7 on file for this type
▸BISADDITIONAL INFORMATION7
04/25/2025320904615Open ↗
10/08/2024321145729Open ↗
03/21/2021321145729Open ↗
Showing 3 of 7 on file for this type
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
02/24/2016321276418Open ↗
▸Other Documents7
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION3
11/13/2024321208947Open ↗
11/12/2024321208956Open ↗
03/21/2021321145729Open ↗
▸BISTCO - Supporting Documents3
11/13/2024321208947Open ↗
11/12/2024321208956Open ↗
09/20/2024321145729Open ↗
▸BISMAINTENANCE INFORMATION1
05/07/2024321145729Open ↗