← Back
Single or multiple dwelling with stores or offices
89-02 NORTHERN BOULEVARD
QUEENS · Jackson Heights · BIN 4035401
💬 Discuss this project
1927Year Built
3Stories
S9Building Class
R4Zoning
—Gross Floor Area
7Units
15 Open Violations 3 unresolved · 12 paperwork only ▸FDNY Report ↗
Single or multiple dwelling with stores or offices · Owner of record: 8902 NB REALTY COMPANY, LLC · 2.46 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
J AMP G CONSTRUCTION SRVCS507/08/2026
J G CONSTRUCTION SRVCS507/08/2026
8902 NB REALTY COMPANY, LLC603/22/2026
89-02 REALTY CO LLC103/22/2026
8912 NORTHERN BOULDEVARD103/22/2026
PENN PLAZA CONSULTANTS IN903/22/2026
PENN PLAZE CONSULTANTS103/22/2026
89 02 NORTHERN BOULEVARD303/22/2026
8902 NORTHERN BL REALTY C403/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
IKRA CONSULTING LLC103/29/2025
HAIDER ENGINEERING, P.E.112/12/2017
GREEN DESIGN111/01/2017
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ADVANCED BUILDERS SERVICES103/21/2026
ATLANTIC BUILDING SUPPLY INC.203/21/2026
HAIDER ENGINEERING, P.E.103/21/2026
HAIDER ENGINEERING P E103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J & G CONSTRUCTION SVCSGeneral Contractor407/08/2026
MICHAEL BAPTISTEElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
IKRA CONSULTING LLC7032103/29/2025
Building Lifecycle
All (70)Filed (3)Permit Issued (4)Violation (48)Objection (6)Special Inspection (9)
11/21/2025
Violation issued (HPD, closed)
I
06/12/2025
Violation issued (HPD, closed)
A
04/11/2025
Objection raised — Plumbing
04/11/2025
Objection raised — Zoning
04/11/2025
Objection raised — Zoning
04/11/2025
Objection raised — Inspections
04/11/2025
Objection raised — Cost
04/11/2025
Objection raised — Other
03/29/2025
Filed — Alteration
Mechanical work type hereby filed to provide AC split system for 2nd and 3rd floors of existing building.
Q01200619-I1
03/26/2025
Special inspection requirement — HVAC-R and service water heating system controls
03/26/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
03/26/2025
Special inspection requirement — Energy Code Compliance Inspections
MD MOSTAFA
03/26/2025
Special inspection requirement — Fire-Resistance Rated Construction
MD MOSTAFA
03/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MD MOSTAFA
03/26/2025
Special inspection requirement — HVAC-R and service water heating equipment
03/26/2025
Special inspection requirement — Maintenance information
03/25/2025
Special inspection requirement — Final
MD MOSTAFA
03/25/2025
Special inspection requirement — Mechanical Systems
MD MOSTAFA
12/02/2024
Violation issued (HPD, closed)
I
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/29/2023
Violation issued (HPD, closed)
A
11/15/2022
Violation issued (HPD, closed)
I
03/04/2022
Violation issued (HPD, closed)
A
04/16/2021
Violation issued (HPD, closed)
I
04/16/2021
Violation issued (HPD, closed)
A
10/24/2018
Violation issued (HPD, closed)
I
01/17/2018
Permit issued — Sidewalk Shed
Q00001608-I1-SH
01/12/2018
Permit issued — Supported Scaffold
Q00005103-I1-SF
12/29/2017
Violation issued (ECB, closed)
Construction
12/29/2017
Violation issued (ECB, closed)
Construction
12/20/2017
Permit issued — Supported Scaffold
Q00005103-I1-SF
12/12/2017
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Q00005103-I1
12/05/2017
Violation issued (HPD, closed)
I
11/06/2017
Permit issued — Sidewalk Shed
Q00001608-I1-SH
11/01/2017
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FILED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2008 CODE
Q00001608-I1
11/22/2016
Violation issued (HPD, closed)
I
10/16/2015
Violation issued (HPD, closed)
I
03/03/2015
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/02/2015
Violation issued (HPD, closed)
I
10/10/2014
Violation issued (ECB, open)
Construction
09/25/2013
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/20/2013
Violation issued (ECB, open)
Construction
06/26/2013
Violation issued (ECB, open)
Construction
05/18/2012
Violation issued (ECB, open)
Construction
12/23/2011
Violation issued (ECB, closed)
Signs
12/23/2011
Violation issued (ECB, closed)
Signs
12/23/2011
Violation issued (ECB, closed)
Signs
06/04/2010
Violation issued (ECB, closed)
Signs
06/04/2010
Violation issued (ECB, closed)
Signs
06/04/2010
Violation issued (ECB, closed)
Signs
06/04/2010
Violation issued (ECB, closed)
Signs
06/04/2010
Violation issued (ECB, closed)
Signs
06/04/2010
Violation issued (ECB, closed)
Signs
06/04/2010
Violation issued (ECB, closed)
Signs
10/26/2005
Violation issued (ECB, open)
Construction
10/26/2005
Violation issued (ECB, open)
Construction
06/24/2005
Violation issued (ECB, open)
Construction
06/24/2005
Violation issued (ECB, open)
Construction
04/12/2005
Violation issued (ECB, closed)
Construction
02/17/2005
Violation issued (ECB, open)
Construction
Latest 60 of 70 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedJ & G CONSTRUCTION SVCS01/17/2018
DOB NOWSupported ScaffoldPermit IssuedJ & G CONSTRUCTION SVCS01/12/2018
DOB NOWSupported ScaffoldPermit IssuedJ & G CONSTRUCTION SVCS12/20/2017
DOB NOWSidewalk ShedPermit IssuedJ & G CONSTRUCTION SVCS11/06/2017
BISFPISSUEDMASTER FIRE SYSTEMS, INC03/17/2016
BISPLISSUEDPETER MICELI PLUMBING05/07/2015
BISMHISSUEDA.N.C. CONTRACTING CO.,IN04/30/2014
BISOTISSUEDMARCO POLO DESIGN CORP10/15/2013
1 project · most recent 03/29/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
03/29/2025——Heating and Air Conditioning Systems
Heat / Cool
Daikin 2MXM18AVJU9 18,000 BTU · Condensing Unit ×2
3MXM24AVJU9 24,000 BTU · Condensing Unit ×2
1 project · most recent 04/25/2023
FiledStatusContractorScope
04/25/2023CompletePLATINUM PWR ELECTL CONT9 meters, 9 new_meters
2 projects · most recent 12/12/2017
Scaffold Sidewalk Shed
FiledStatusContractorScope
12/12/2017Permit IssuedJ & G CONSTRUCTION SRVCSScaffold
11/01/2017Permit IssuedJ & G CONSTRUCTION SRVCSSidewalk Shed
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
03/26/2025HVAC-R and service water heating system controls—energy_progress
03/26/2025HVAC-R and service water piping design and insulation—energy_progress
03/26/2025Energy Code Compliance InspectionsMD MOSTAFAprogress
03/26/2025Fire-Resistance Rated ConstructionMD MOSTAFAprogress
03/26/2025Fire-Resistant Penetrations and JointsMD MOSTAFAspecial
03/26/2025HVAC-R and service water heating equipment—energy_progress
03/26/2025Maintenance information—energy_progress
03/25/2025FinalMD MOSTAFAprogress
03/25/2025Mechanical SystemsMD MOSTAFAspecial
▾Documents — 38 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/29/2026Q00001608-I1Request digital key ↗
08/29/2026Q00005103-I1Request digital key ↗
08/15/2026Q01200619-I1Request digital key ↗
▸Applications & Permits6
▸BISPLAN / WORK APPROVAL APPLICATION3
06/22/2015421151595Open ↗
05/14/2014420936152Open ↗
10/02/2013420874110Open ↗
▸BISWORK PERMIT APPLICATION3
05/12/2015420874110Open ↗
05/14/2014420936152Open ↗
10/17/2013420874110Open ↗
▸Seals & Professional Certifications17
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
06/20/2015421151595Open ↗
05/14/2014420936152Open ↗
10/16/2013420874110Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
06/20/2015421151595Open ↗
05/14/2014420936152Open ↗
10/16/2013420874110Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
06/20/2015421151595Open ↗
05/14/2014420936152Open ↗
10/16/2013420874110Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/29/2026Q00005103-I1Open ↗
08/20/2026Q01200619-I1Open ↗
08/13/2026Q00001608-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature3
09/01/2026Q01200619-I1Open ↗
09/01/2026Q01200619-I1Open ↗
09/01/2026Q01200619-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026Q01200619-I1Open ↗
09/01/2026Q01200619-I1Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING1
10/02/2013420874110Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/29/2026Q00005103-I1Open ↗
▸Energy Compliance1
▸BISTR8: Energy Code Progress Inspections1
10/17/2013420874110Open ↗
▸Approvals, Objections & Sign-offs2
▸BISADMINISTRATIVE OBJECTIONS2
05/13/2014420936152Open ↗
10/02/2013420874110Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
06/20/2015421151595Open ↗
05/14/2014420936152Open ↗
10/16/2013420874110Open ↗
▸Filing & Intake Forms3
▸BISEFILING COVER SHEET3
06/22/2015421151595Open ↗
05/14/2014420936152Open ↗
10/02/2013420874110Open ↗
▸Other Documents1
▸DOB NOWCPC Certification for FRESH1
08/13/2026Q00001608-I1Open ↗