Appl filed to replace HWH at cellar, proposed 2 bath fixt (lavatory & toilet) at 1st fl, cap & remove shower & gas ranger at 2nd fl, relocated non-residential sink, toilet & lavatory at 2nd fl, proposed tankless HWH/Boiler & 2 floor drains at 2nd fl.
On file for this project
3 documents · 3 drawing sheets