← Back
Three families
89-08 48 AVENUE
QUEENS · BIN 4045102
💬 Discuss this project
1975Year Built
3Stories
C0Building Class
R5Zoning
3,330 sfGross Floor Area
3Units
0 Open ViolationsFDNY Report ↗
Three families · 2,905 sf lot · 1.15 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Floor 33p · 1 filing · 8 docs
Floor 2
Floor 13p · 2 filings · 17 docs
Cellar3p · 1 filing · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
89-08 48TH AVE803/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BAYSIDE ENGINEERING PC503/13/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LXC CONSTRUCTION INCGeneral Contractor303/21/2026
ROCK E SMALL PLBG&HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SD TESTING & INSPECTION S7010203/13/2024
Building Lifecycle
All (31)Filed (5)Permit Issued (2)Signed Off (2)Violation (14)Inspection (6)Special Inspection (2)
03/21/2024
Signed off — Alteration
PROPOSED PLUMBING WORK ON CELLAR, 1ST FLOOR.IN CONJUNCTION WITH DOB NOW GC JOB NO:B08021716. AS PER PLAN. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
Q00803481-I1
03/21/2024
Signed off — Alteration
PROPOSED INTERIOR RENOVATION WORK ON CEL, 1st FLOOR OF THE BUILDING TO RESOLVE DOH VIOLATION #4902635.AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q08021716-I1
03/20/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
03/15/2024
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
03/15/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIUCHENG LI
03/15/2024
Special inspection requirement — Fire-Resistance Rated Construction
XIUCHENG LI
03/13/2024
Filed — Alteration
PROPOSED INTERIOR RENOVATION WORK ON CEL, 1st FLOOR OF THE BUILDING TO RESOLVE DOH VIOLATION #4902635.AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q08021716-P1
07/18/2023
Filed — Alteration
PROPOSED PLUMBING WORK ON CELLAR, 1ST FLOOR.IN CONJUNCTION WITH DOB NOW GC JOB NO:B08021716. AS PER PLAN. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
Q00803481-P2
07/12/2023
Violation issued (HPD, closed)
B
06/16/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/12/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
05/04/2023
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
04/21/2023
Filed — Alteration
PROPOSED PLUMBING WORK ON CELLAR, 1ST FLOOR.IN CONJUNCTION WITH DOB NOW GC JOB NO:B08021716. AS PER PLAN. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
Q00803481-P1
04/05/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/08/2023
Permit issued — Plumbing
Q00803481-I1-PL
01/09/2023
Violation issued (ECB, closed)
Construction
12/22/2022
Filed — Alteration
PROPOSED PLUMBING WORK ON CELLAR, 1ST FLOOR.IN CONJUNCTION WITH DOB NOW GC JOB NO:B08021716. AS PER PLAN. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
Q00803481-I1
12/02/2022
Violation issued (ECB, closed)
Unknown
12/02/2022
Violation issued (ECB, closed)
Construction
12/02/2022
Violation issued (ECB, closed)
Unknown
12/02/2022
Violation issued (ECB, closed)
Construction
10/31/2022
Permit issued — General Construction
Q08021716-I1-GC
10/25/2022
Filed — Alteration
PROPOSED INTERIOR RENOVATION WORK ON CEL, 1st FLOOR OF THE BUILDING TO RESOLVE DOH VIOLATION #4902635.AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q08021716-I1
09/20/2022
Violation issued (HPD, closed)
C
09/20/2022
Violation issued (HPD, closed)
C
09/20/2022
Violation issued (HPD, closed)
B
09/20/2022
Violation issued (HPD, closed)
B
09/20/2022
Violation issued (HPD, closed)
C
09/20/2022
Violation issued (HPD, closed)
C
09/20/2022
Violation issued (HPD, closed)
B
09/20/2022
Violation issued (HPD, closed)
B
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offROCK E SMALL PLBG&HTG INC03/08/2023
DOB NOWGeneral ConstructionSigned-offLXC CONSTRUCTION INC10/31/2022
2 projects · most recent 12/23/2022
General Wiring
FiledStatusContractorScope
12/23/2022CompleteKJK ELECTRIC INCGeneral Wiring
12/23/2022CancelledKJK ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
03/20/2024Pass-Final General Construction Non-Directive 14PassView ↗
03/15/2024Fail-Final General Construction Non-Directive 14FailView ↗
06/16/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/12/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
05/04/2023No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
04/05/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
03/15/2024Fire-Resistant Penetrations and JointsXIUCHENG LIspecial
03/15/2024Fire-Resistance Rated ConstructionXIUCHENG LIprogress
▾Documents — 17 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/25/2026Q08021716-P1Request digital key ↗
08/25/2026Q08021716-I1Request digital key ↗
08/24/2026Q00803481-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications7
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/25/2026Q08021716-P1Open ↗
08/25/2026Q08021716-I1Open ↗
08/24/2026Q00803481-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature1
08/26/2026Q08021716-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/26/2026Q08021716-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/25/2026Q08021716-I1Open ↗
08/25/2026Q08021716-P1Open ↗
08/24/2026Q00803481-P2Open ↗
Showing 3 of 5 on file for this type