← Back
BuildNYC
Condo, retail space
89-09 165TH STREET
QUEENS · Jamaica · BIN 4209605
💬 Discuss this project
1937Year Built
2Stories
RKBuilding Class
C4-4DZoning
97,439 sfGross Floor Area
2Units
4 Active Violations 2 unresolved · 2 paperwork only 1 likely answered ▸FDNY Report ↗
Condo, retail space · Owner of record: Jamaica Village Owner · 95,380 sf lot · 1.02 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Roof89th Jamaica Realty Co.l.l.c3p · 2 filings · 20 docs
Floor 11Jamaica Development1 filing · 14 docs
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 189th Jamaica Realty Co.l.l.c33p · 8 filings · 20 docs
CellarJamaica Development2p · 2 filings · 20 docs
Site & exteriorSidewalk shed and fence constructionUnder Construction6p · 3 filings · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
89th Jamaica Realty Co5807/08/2026
AGI203/21/2026
NYC Department of Housing Preservation and Development103/21/2026
David Lucas Realty103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Adroit Engineering408/01/2025
Elevated Engineering NYC307/25/2025
Jfa Architects & Engineers107/11/2025
Prospect Associates106/06/2022
SE Hwan Kim Architect602/11/2020
LB&B Associates101/28/2020
Allen Shinfeld, P.E201/07/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Speedy Expediting803/21/2026
BMB Building Consulting203/21/2026
K M DOB Consulting1403/21/2026
Avalon Designs803/21/2026
Youn Design403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Toji Develop NYGeneral Contractor303/21/2026
Neptune Signs & AwningsSign hanger207/08/2026
WCK ElectricElectrical203/21/2026
Hexagon IndustriesGeneral Contractor207/08/2026
Kaufman GroupGeneral Contractor107/08/2026
Three Star Construction GGeneral Contractor104/09/2026
Unitech DesignGeneral Contractor104/09/2026
Hexagon IndustriesScaffold107/08/2026
Kaufman GroupScaffold104/09/2026
On Star ManagementScaffold104/09/2026
Toji Develop NYScaffold107/08/2026
Ariana ContractingFire Protection107/08/2026
Ariana ContractingPlumbing107/08/2026
Delta Power ElectricalElectrical103/22/2026
Prime Piping & HeatingFire Protection107/08/2026
George Holness G.CElectrical103/21/2026
S&R Electrical & MechanicalElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Adroit Engineering8885208/01/2025
Prospect Engineering2775106/06/2022
SY Engineering5149302/11/2020
W Chan Engineering2881101/28/2020
Building Lifecycle
All (121)Filed (18)Permit Issued (14)Signed Off (8)Violation (42)Inspection (1)Objection (8)Special Inspection (30)
04/15/2026
Signed off — Full Demolition
Full demolition of Existing 1 story building
Q01233307-I1
04/14/2026
Permit issued — Sprinklers
Q01233307-S1-EW-SP
03/05/2026
Permit issued — Protection and Mechanical Methods
Q01233307-S2-PMM
03/05/2026
Permit issued — Full Demolition
Q01233307-I1-FD
01/26/2026
Permit issued — Construction Fence
Q01233337-I1-FN
01/21/2026
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/21/2026
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/13/2026
Violation issued (ECB, closed)
Unknown
01/13/2026
Violation issued (ECB, closed)
Unknown
01/13/2026
Violation issued (ECB, closed)
Unknown
01/09/2026
Objection resolved — Resolved
09/30/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/19/2025
Permit issued — Full Demolition
Q01233307-I1-FD
09/19/2025
Violation issued (ECB, closed)
Construction
09/19/2025
Violation issued (ECB, closed)
Construction
09/17/2025
Violation issued (ECB, closed)
Construction
09/17/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/17/2025
Violation issued (ECB, closed)
Construction
09/02/2025
Objection resolved — Addressed
08/22/2025
Objection raised — Other
08/04/2025
Objection raised — Other
08/04/2025
Objection raised — Energy
08/04/2025
Objection raised — Other
08/01/2025
Filed — Full Demolition
Full demolition of Existing 1 story building
Q01233307-S1
08/01/2025
Filed — Full Demolition
Full demolition of Existing 1 story building
Q01233307-S2
07/25/2025
Filed — New Building
SUPPORT OF EXCAVATION WORK FILED IN CONJUNCTION WITH NB APPLICATION Q01245455-I1
Q01245455-S3
07/25/2025
Filed — New Building
SUPPORT OF EXCAVATION WORK FILED IN CONJUNCTION WITH NB APPLICATION Q01245455-I1
Q01245455-S1
07/25/2025
Filed — New Building
SUPPORT OF EXCAVATION WORK FILED IN CONJUNCTION WITH NB APPLICATION Q01245455-I1
Q01245455-S2
07/24/2025
Special inspection requirement — Masonry
07/24/2025
Special inspection requirement — Post-installed Anchors
07/24/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
07/24/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
07/24/2025
Special inspection requirement — Post-installed Anchors
07/24/2025
Special inspection requirement — Concrete - Cast-In-Place
07/24/2025
Special inspection requirement — Subgrade Inspections
07/24/2025
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
07/24/2025
Special inspection requirement — Subgrade Inspections
07/17/2025
Objection resolved — Addressed
07/14/2025
Special inspection requirement — Final
07/14/2025
Special inspection requirement — Footing and Foundation
07/14/2025
Special inspection requirement — Final
07/11/2025
Filed — New Building
SUPPORT OF EXCAVATION WORK FILED IN CONJUNCTION WITH NB APPLICATION Q01245455-I1
Q01245455-I1
07/09/2025
Special inspection requirement — Maintenance information
07/09/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
07/09/2025
Special inspection requirement — Interior lighting power
07/09/2025
Special inspection requirement — Electrical motors and elevators
07/09/2025
Special inspection requirement — Metering
07/09/2025
Special inspection requirement — Protection of exposed foundation insulation
07/09/2025
Special inspection requirement — Vestibules
07/09/2025
Special inspection requirement — Exterior lighting power
07/09/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
07/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/09/2025
Special inspection requirement — Energy Code Compliance Inspections
07/09/2025
Special inspection requirement — Fire-Resistance Rated Construction
07/09/2025
Special inspection requirement — Air barrier - visual inspection
07/09/2025
Special inspection requirement — Fenestration areas
07/09/2025
Special inspection requirement — Lighting controls
07/09/2025
Special inspection requirement — Lighting in dwelling units
07/09/2025
Special inspection requirement — Air barrier continuity plan testing
07/09/2025
Special inspection requirement — Insulation placement and R values
Latest 60 of 121 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offPrime Piping & Heating04/14/2026
DOB NOWProtection and Mechanical MethodsSigned-offKaufman Group03/05/2026
DOB NOWFull DemolitionSigned-offKaufman Group03/05/2026
DOB NOWConstruction FencePermit IssuedOn Star Management01/26/2026
DOB NOWFull DemolitionSigned-offHexagon Industries09/19/2025
DOB NOWConstruction FencePermit IssuedHexagon Industries06/23/2025
DOB NOWGeneral ConstructionSigned-offUnitech Design06/07/2022
DOB NOWSignPermit IssuedNeptune Signs & Awnings03/09/2020
DOB NOWSignPermit IssuedNeptune Signs & Awnings03/09/2020
DOB NOWStructuralSigned-offThree Star Construction G02/06/2020
DOB NOWPlumbingSigned-offAriana Contracting02/03/2020
DOB NOWSprinklersSigned-offAriana Contracting02/03/2020
DOB NOWMechanical SystemsSigned-offToji Develop NY01/28/2020
DOB NOWConstruction FenceSigned-offToji Develop NY12/17/2019
DOB NOWFull DemolitionSigned-offHexagon Industries—
BISOTISSUEDToji Develop NY01/21/2020
BISOTISSUEDEastern BH Mechanical02/17/2017
BISMHISSUEDKorman Design & Build10/24/2016
BISEQISSUEDHigh Quality Construction09/03/2014
BISOTISSUEDHigh Quality Construction09/03/2014
BISFPISSUEDUnique Fire Systems05/22/2014
BISPLISSUEDM & M Piping and Heating02/03/2014
BISOTISSUEDStructuretech Engineering01/02/2014
BISOTISSUEDLee & Company of NY12/27/2013
BISOTISSUEDFavors & Company11/09/2012
BISEQISSUEDFavors & Company11/09/2012
BISFPISSUEDNY Fire02/17/2012
BISPLISSUEDCatman Plumbing12/13/2011
BISOTISSUEDD & B Brothers Construction12/13/2011
BISPLISSUEDS & L Plumbing10/26/2011
BISOTISSUEDHong Kong Style Construction10/26/2011
BISFPISSUEDNY Fire08/02/2010
BISPLISSUEDW.R. Plumbing and Heating07/14/2010
BISOTISSUEDHigh Quality Construction08/15/2008
BISFPISSUEDFiremasters07/06/2007
BISOTISSUEDBerger Signs12/01/2006
BIS—ISSUEDBerger Signs12/01/2006
BISPLISSUEDMinland PLG05/28/2002
BISOTISSUEDJRC Archicon05/13/2002
BISOTISSUEDSpace Sign Co09/25/2001
+ 11 more permits on file
2 projects · most recent 08/01/2025
FiledStatusContractorScope
08/01/2025Signed-offPrime Piping & Heating2 heads
02/11/2020Signed-offAriana Contracting25 heads
1 project · most recent 08/01/2025
FiledStatusContractorScope
08/01/2025———
12 projects · most recent 12/04/2025
General Wiring
FiledStatusContractorScope
12/04/2025Permit IssuedS&R Electrical & Mechanical—
12/04/2025Permit IssuedS&R Electrical & MechanicalGeneral Wiring
12/04/2025Permit IssuedS&R Electrical & Mechanical6 meters, 6 new_meters
04/30/2021CompleteJK ElectricalGeneral Wiring
07/01/2020CompleteDelta Power Electrical19 meters, 1 new_meters
02/11/2020CompleteDelta Power ElectricalGeneral Wiring
01/26/2020CompleteJong Hyun Kim—
01/26/2020CompleteJong Hyun Kim—
11/14/2019Permit IssuedT.M.T. ElectricGeneral Wiring
06/11/2018CompleteCore Electrical—
02/15/2018CompleteCore Electrical—
02/15/2018CompleteCore Electrical—
1 project · most recent 07/25/2025
FiledStatusContractorScope
07/25/2025——4 scope_items
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
06/21/2022Pass-Final General Construction Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 43
DateRequirementInspectorRole
07/24/2025Masonry—special
07/24/2025Post-installed Anchors—special
07/24/2025Excavations - Sheeting, Shoring, and Bracing—special
07/24/2025Subsurface Investigations (Borings/Test Pits)—special
07/24/2025Post-installed Anchors—special
07/24/2025Concrete - Cast-In-Place—special
07/24/2025Subgrade Inspections—special
07/24/2025Subsurface Conditions – Fill Placement & In-Place Density—special
07/24/2025Subgrade Inspections—special
07/14/2025Final—progress
07/14/2025Footing and Foundation—progress
07/14/2025Final—progress
07/09/2025Maintenance information—energy_progress
07/09/2025Fenestration and door U-factor and product ratings—energy_progress
07/09/2025Interior lighting power—energy_progress
07/09/2025Electrical motors and elevators—energy_progress
07/09/2025Metering—energy_progress
07/09/2025Protection of exposed foundation insulation—energy_progress
07/09/2025Vestibules—energy_progress
07/09/2025Exterior lighting power—energy_progress
07/09/2025Exterior Insulation and Finish Systems (EIFS)—special
07/09/2025Fire-Resistant Penetrations and Joints—special
07/09/2025Energy Code Compliance Inspections—progress
07/09/2025Fire-Resistance Rated Construction—progress
07/09/2025Air barrier - visual inspection—energy_progress
Latest 25 of 43.
▾Documents — 343 on file (BIS + DOB NOW)
▸Plans & Drawings18
▸DOB NOWPlans/Sketch9
08/26/2026Q00749233-I1Request digital key ↗
08/19/2026Q01233337-I1Request digital key ↗
08/19/2026Q01245455-S1Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
08/28/2026Q00298520-I1Request digital key ↗
08/15/2026Q00298520-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler2
08/28/2026Q00302630-I1Request digital key ↗
08/15/2026Q00302630-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Sign2
08/28/2026Q00290151-I1Request digital key ↗
08/28/2026Q00279971-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
08/28/2026Q00280927-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
08/28/2026Q00297057-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/28/2026Q00298579-I1Request digital key ↗
▸Applications & Permits52
▸BISPLAN / WORK APPROVAL APPLICATION29
04/21/2025421840093Open ↗
08/01/2024421840093Open ↗
07/30/2024421840093Open ↗
Showing 3 of 29 on file for this type
▸BISWORK PERMIT APPLICATION20
01/29/2020421802927Open ↗
12/27/2019421941153Open ↗
02/18/2017421433817Open ↗
Showing 3 of 20 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications3
12/02/2016421366471Open ↗
06/20/2015421023494Open ↗
05/12/2012420477148Open ↗
▸Zoning, Tax Lot & Property Records3
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
07/17/2025421842983Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q01245455-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026Q01245455-I1Open ↗
▸Seals & Professional Certifications78
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION29
01/27/2020421802927Open ↗
01/27/2020421802927Open ↗
12/27/2019421941153Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature18
08/28/2026Q00280927-I1Open ↗
08/28/2026Q00290151-I1Open ↗
08/28/2026Q00298520-I1Open ↗
Showing 3 of 18 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST10
01/23/2020421802927Open ↗
12/19/2019421941153Open ↗
02/17/2017421433817Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
08/25/2026Q01233307-I1Open ↗
08/25/2026Q01233307-I1Open ↗
08/25/2026Q01233307-I1Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT7
01/23/2020421802927Open ↗
12/19/2019421941153Open ↗
02/17/2017421433817Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
08/24/2026Q00298579-I1Open ↗
08/24/2026Q00298579-I1Open ↗
08/22/2026Q00297057-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment29
▸BISSELF-CERT PLUMBING NOTICE9
05/15/2014420929437Open ↗
04/17/2012420477148Open ↗
03/12/2012420477148Open ↗
Showing 3 of 9 on file for this type
▸BISSCHEDULE B - PLUMBING7
04/24/2014420929437Open ↗
03/12/2014420929437Open ↗
03/15/2012420477148Open ↗
Showing 3 of 7 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
05/15/2014420929437Open ↗
02/18/2014420929437Open ↗
01/06/2014420929437Open ↗
▸BISEQUIPMENT USE PERMITS3
06/09/2017421433817Open ↗
06/09/2017421433817Open ↗
12/02/2016421366471Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT2
06/09/2017421433817Open ↗
12/02/2016421366471Open ↗
▸BISPLUMBING - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWElectric Cut-Off1
08/13/2026Q01233307-I1Open ↗
▸DOB NOWWater Cut-Off1
08/13/2026Q01233307-I1Open ↗
▸DOB NOWGas Cut-Off1
08/13/2026Q01233307-I1Open ↗
▸DOB NOWSewer Cut-Off1
08/13/2026Q01233307-I1Open ↗
▸Safety & Tenant Protection5
▸BISTenant Protection Plan and Notes2
01/23/2020421802927Open ↗
12/19/2019421941153Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
11/10/2012420782077Open ↗
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWStreet Tree Checklist1
08/13/2026Q01245455-I1Open ↗
▸Environmental & Asbestos23
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/28/2026Q00298520-I1Open ↗
08/28/2026Q00302630-I1Open ↗
08/28/2026Q00302630-P2Open ↗
Showing 3 of 8 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)7
01/23/2020421802927Open ↗
12/19/2019421941153Open ↗
02/17/2017421433817Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWRodent Control1
08/13/2026Q01233307-I1Open ↗
▸Energy Compliance31
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS14
01/27/2020421802927Open ↗
01/27/2020421802927Open ↗
12/27/2019421941153Open ↗
Showing 3 of 14 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS8
09/01/2020421802927Open ↗
09/01/2020421941153Open ↗
03/22/2017421433817Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: ENERGY6
05/12/2012420477148Open ↗
11/14/2011420502744Open ↗
Showing 2 of 6 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
09/01/2020421802927Open ↗
09/01/2020421941153Open ↗
▸BISTR8: Energy Code Progress Inspections1
02/23/2012420502744Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY2
09/01/2020421802927Open ↗
09/01/2020421941153Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026Q01245455-S1Open ↗
▸Approvals, Objections & Sign-offs33
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST14
09/25/2020421941153Open ↗
09/25/2020421802927Open ↗
06/09/2017421433817Open ↗
Showing 3 of 14 on file for this type
▸BISADMINISTRATIVE OBJECTIONS13
02/17/2017421433817Open ↗
09/10/2014421023494Open ↗
05/01/2014420973619Open ↗
Showing 3 of 13 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
07/17/2025421842983Open ↗
04/24/2025421840093Open ↗
06/10/2015421023494Open ↗
Showing 3 of 5 on file for this type
▸BISLetter of Intent to Revoke1
04/06/2015421023494Open ↗
▸Cost, Insurance & Ownership30
▸BISCOST AFFIDAVIT30
09/25/2020421941153Open ↗
09/25/2020421802927Open ↗
01/23/2020421802927Open ↗
Showing 3 of 30 on file for this type
▸Filing & Intake Forms25
▸BISEFILING COVER SHEET18
04/21/2025421840093Open ↗
01/23/2020421802927Open ↗
12/19/2019421941153Open ↗
Showing 3 of 18 on file for this type
▸BISADDITIONAL INFORMATION6
01/30/2020421802927Open ↗
12/27/2019421941153Open ↗
10/26/2016421366471Open ↗
Showing 3 of 6 on file for this type
▸BISBOROUGH INTAKE FORM1
04/21/2025421840093Open ↗
▸Other Documents13
▸BISFIRE SUPP ANSUL APPROVL- FD-FSS5
05/12/2012420532775Open ↗
04/17/2012420477148Open ↗
04/06/2012420477148Open ↗
Showing 3 of 5 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
07/17/2025421842983Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
07/17/2025421842983Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
08/13/2026Q01233307-I1Open ↗
▸DOB NOWStructure Photographs1
08/13/2026Q01233307-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026Q01245455-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026Q01245455-I1Open ↗
▸DOB NOWCommunity Board Notification1
08/13/2026Q01233307-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/13/2026Q01233307-I1Open ↗