ECB12/04/1999WORK WITHOUT A PERMIT. WORK NOTED: AT FRONT OF PREMISES AN OPENING WASCUT FOR A STEEL ENTRY DOOR IN THE FOUNDATION AND CONCRETE STEPS WERE ABOUT TO BE INSTALLED. IN ADDITION IN THE CELLAR PARTITION WALLS WERENothing owed — awaiting certificate of correction
Two family frame · 1 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.