← Back
Hospital, sanitarium, mental institution
AB Building
89-10 VAN WYCK EXPRESSWAY · Richmond Hill · BIN 4438605
💬 Discuss this project
1987Year Built
8Stories
I1Building Class
R6Zoning
532,011 sfGross Floor Area
1Units
LL97 Covered31 Open Violations 27 unresolved · 4 paperwork only ▸FISP: SAFEFDNY Report ↗
Hospital, sanitarium, mental institution · 108,138 sf lot · 4.92 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionCivilGeneral
Roof13p · 5 filings · 20 docs
Floor 61p · 1 filing · 20 docs
Floor 512p · 4 filings · 20 docs
Floor 4
Floor 3
Floor 222p · 5 filings · 20 docs
Floor 127p · 11 filings · 20 docs
Cellar15p · 5 filings · 20 docs
Basement38p · 6 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
JAMAICA HOSPITAL6709/13/2026
JHMC1007/08/2026
JAMAICA HOSPITAL MEDICAL CENT3407/08/2026
KINGS GROUP NY CORP503/22/2026
BIG APPLE WREKING & CO103/22/2026
L.B.GRIFFIN CONST. CO103/22/2026
JAMAICA HOSPITAL/ MAMZON103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
J CALLAHAN CONSULTING1203/21/2026
JAM CONSULTANTS, INC.203/21/2026
FAVIO MARIA BARRIONUEVO3603/21/2026
XPDITE GROUP LLC (104)803/21/2026
FRANK BUENO EXPEDITING403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EESON CONSTRUCTION TSG LLGeneral Contractor1607/08/2026
JAMAICA HOSPITAL MEDICALGeneral Contractor1007/08/2026
AJC SPRINKLER CORPFire Protection307/08/2026
KINGS GROUP NY CORPGeneral Contractor303/21/2026
A.M.N. CORPORATIONPlumbing207/08/2026
I DO PLUMBING & HTG INCPlumbing207/08/2026
AVON PLBG & HTG INCFire Protection207/08/2026
ARIANA CONTRACTING INCPlumbing107/08/2026
V.P.H. MECHANICAL CORPGeneral Contractor107/08/2026
ARIANA CONTRACTING INCFire Protection107/08/2026
GRR COOLING EXPERTS INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DAVID KATZ, P.E.6087912/20/2024
LEDER-LUIS ARCHITECTURAL1553411/05/2024
VINCENT J. LIOTTA P. E.1974108/02/2021
TWIN PEAKS INC.317205/27/2021
Building Lifecycle
All (292)Filed (46)Permit Issued (28)Signed Off (18)Facade (FISP) (16)Violation (60)Inspection (22)Objection (72)Special Inspection (30)
06/26/2026
Objection resolved — Addressed
06/25/2026
Objection resolved — Addressed
06/25/2026
Objection resolved — Addressed
06/25/2026
Objection resolved — Resolved
06/16/2026
Objection raised — Scope
06/16/2026
Objection raised — Other
06/16/2026
Objection raised — Inspections
06/16/2026
Objection raised — Energy
06/05/2026
Filed — Alteration
JAMAICA HOSPITAL EMERGENCY TRIAGE SUITE. WORK INCLUDES DEMOLITION OF EXISTING NON-BEARING INTERIOR PARTITIONS, CONSTRUCTION OF NEW NON-BEARING INTERIOR PARTITIONS, SUSPENDED CEILING, AND FINISHES TO CREATE AN OUTPATIENT CLINIC.
Q01406503-S3
06/05/2026
Filed — Alteration
JAMAICA HOSPITAL EMERGENCY TRIAGE SUITE. WORK INCLUDES DEMOLITION OF EXISTING NON-BEARING INTERIOR PARTITIONS, CONSTRUCTION OF NEW NON-BEARING INTERIOR PARTITIONS, SUSPENDED CEILING, AND FINISHES TO CREATE AN OUTPATIENT CLINIC.
Q01406503-S1
06/05/2026
Filed — Alteration
JAMAICA HOSPITAL EMERGENCY TRIAGE SUITE. WORK INCLUDES DEMOLITION OF EXISTING NON-BEARING INTERIOR PARTITIONS, CONSTRUCTION OF NEW NON-BEARING INTERIOR PARTITIONS, SUSPENDED CEILING, AND FINISHES TO CREATE AN OUTPATIENT CLINIC.
Q01406503-S2
06/03/2026
Special inspection requirement — Sprinkler Systems
06/03/2026
Special inspection requirement — Seismic Isolation Systems
06/03/2026
Special inspection requirement — Post-installed Anchors
06/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/02/2026
Special inspection requirement — HVAC-R and service water heating equipment
06/02/2026
Special inspection requirement — Mechanical Systems
06/02/2026
Special inspection requirement — Energy Code Compliance Inspections
06/02/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
06/02/2026
Special inspection requirement — Final
06/02/2026
Special inspection requirement — Maintenance information
06/02/2026
Special inspection requirement — HVAC-R and service water heating system controls
05/29/2026
Filed — Alteration
JAMAICA HOSPITAL EMERGENCY TRIAGE SUITE. WORK INCLUDES DEMOLITION OF EXISTING NON-BEARING INTERIOR PARTITIONS, CONSTRUCTION OF NEW NON-BEARING INTERIOR PARTITIONS, SUSPENDED CEILING, AND FINISHES TO CREATE AN OUTPATIENT CLINIC.
Q01406503-I1
05/22/2026
Special inspection requirement — Final
05/22/2026
Special inspection requirement — Fire-Resistance Rated Construction
05/22/2026
Special inspection requirement — Interior lighting power
05/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
04/22/2026
Objection resolved — Resolved
04/09/2026
Objection resolved — Addressed
04/08/2026
Objection resolved — Addressed
04/07/2026
Objection raised — Admin
04/07/2026
Objection raised — Other
03/29/2026
Objection raised — Admin
03/29/2026
Objection raised — Other
03/26/2026
Filed — Alteration
MECHANICAL SYSTEMS (HVAC) WORK RELATED TO RENOVATION OF JAMAICA HOSPITAL MEDICAL CENTER 1ST FLR RADIOLOGY DEPT. TO CREATE PET SCAN & ULTRASOUND SUITES.
Q01376321-S1
03/26/2026
Filed — Alteration
MECHANICAL SYSTEMS (HVAC) WORK RELATED TO RENOVATION OF JAMAICA HOSPITAL MEDICAL CENTER 1ST FLR RADIOLOGY DEPT. TO CREATE PET SCAN & ULTRASOUND SUITES.
Q01376321-I1
03/26/2026
Filed — Alteration
MECHANICAL SYSTEMS (HVAC) WORK RELATED TO RENOVATION OF JAMAICA HOSPITAL MEDICAL CENTER 1ST FLR RADIOLOGY DEPT. TO CREATE PET SCAN & ULTRASOUND SUITES.
Q01376321-S2
03/26/2026
Filed — Alteration
MECHANICAL SYSTEMS (HVAC) WORK RELATED TO RENOVATION OF JAMAICA HOSPITAL MEDICAL CENTER 1ST FLR RADIOLOGY DEPT. TO CREATE PET SCAN & ULTRASOUND SUITES.
Q01376321-S3
03/25/2026
Filed — Alteration CO
Foundation
Q01264753-S3
03/25/2026
Filed — Alteration CO
Foundation
Q01264753-S4
03/23/2026
Special inspection requirement — Mechanical Systems
03/23/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
03/23/2026
Special inspection requirement — Final
03/17/2026
Objection resolved — Addressed
03/12/2026
Objection resolved — Addressed
03/11/2026
Objection raised — Energy
03/11/2026
Objection raised — Energy
03/11/2026
Objection raised — Plumbing
03/02/2026
Filed — Alteration CO
Foundation
Q01264753-S5
03/02/2026
Filed — Alteration CO
Foundation
Q01264753-S7
03/02/2026
Filed — Alteration CO
Foundation
Q01264753-S6
02/25/2026
Special inspection requirement — Sprinkler Systems
02/25/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
02/25/2026
Special inspection requirement — Post-installed Anchors
02/23/2026
Special inspection requirement — HVAC-R and service water heating system controls
02/23/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
02/23/2026
Special inspection requirement — Energy Code Compliance Inspections
02/23/2026
Special inspection requirement — Maintenance information
02/23/2026
Special inspection requirement — HVAC-R and service water heating equipment
02/23/2026
Special inspection requirement — Mechanical Systems
Latest 60 of 292 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offAVON PLBG & HTG INC01/02/2025
DOB NOWPlumbingSigned-offI DO PLUMBING & HTG INC01/02/2025
DOB NOWSprinklersSigned-offAJC SPRINKLER CORP08/15/2024
DOB NOWGeneral ConstructionSigned-offJAMAICA HOSPITAL MEDICAL07/05/2024
DOB NOWPlumbingSigned-offA.M.N. CORPORATION05/20/2024
DOB NOWSprinklersSigned-offAJC SPRINKLER CORP05/20/2024
DOB NOWMechanical SystemsSigned-offGRR COOLING EXPERTS INC05/17/2024
DOB NOWGeneral ConstructionSigned-offEESON CONSTRUCTION TSG LL03/19/2024
DOB NOWGeneral ConstructionSigned-offEESON CONSTRUCTION TSG LL03/05/2024
DOB NOWMechanical SystemsPermit IssuedEESON CONSTRUCTION TSG LL03/04/2024
DOB NOWGeneral ConstructionSigned-offJAMAICA HOSPITAL MEDICAL01/19/2024
DOB NOWStructuralSigned-offEESON CONSTRUCTION TSG LL10/25/2023
DOB NOWMechanical SystemsSigned-offEESON CONSTRUCTION TSG LL07/28/2023
DOB NOWSprinklersSigned-offARIANA CONTRACTING INC07/28/2023
DOB NOWGeneral ConstructionSigned-offEESON CONSTRUCTION TSG LL07/27/2023
DOB NOWSprinklersSigned-offAVON PLBG & HTG INC07/21/2023
DOB NOWPlumbingSigned-offI DO PLUMBING & HTG INC07/20/2023
DOB NOWPlumbingSigned-offARIANA CONTRACTING INC07/18/2023
DOB NOWGeneral ConstructionSigned-offJAMAICA HOSPITAL MEDICAL04/26/2023
DOB NOWMechanical SystemsPermit IssuedEESON CONSTRUCTION TSG LL04/03/2023
DOB NOWGeneral ConstructionSigned-offEESON CONSTRUCTION TSG LL04/03/2023
DOB NOWMechanical SystemsPermit IssuedVPH MECHANICAL07/12/2022
DOB NOWGeneral ConstructionSigned-offJAMAICA HOSPITAL MEDICAL11/15/2021
DOB NOWMechanical SystemsSigned-offJAMAICA HOSPITAL MEDICAL11/15/2021
DOB NOWPlumbingSigned-offA.M.N. CORPORATION09/29/2021
DOB NOWSprinklersSigned-offAJC SPRINKLER CORP09/29/2021
DOB NOWGeneral ConstructionSigned-offJAMAICA HOSPITAL MEDICAL03/15/2021
DOB NOWSidewalk ShedSigned-offKINGS GROUP NY CORP11/04/2020
BISOTISSUEDAPA GROUP INC02/23/2021
BISOTISSUEDAPA GROUP INC06/26/2020
BISPLISSUEDUNIVERSAL PLUMBING INC11/24/2015
BISSDISSUEDWILLIAM HIRD & CO INC06/23/2015
BISPLISSUEDUNIVERSAL PLUMBING INC11/14/2014
BISFPISSUEDWILLIAM HIRD & CO INC09/20/2013
BISMHISSUEDJAMAICA HOSPITAL MEDICAL11/26/2010
BISPLISSUEDSPARACO'S P&H CORP05/27/2010
BISOTISSUEDJAMAICA HOSPITAL MEDICAL05/13/2010
BISPLISSUEDSPARACO'S P&H CORP01/20/2010
BISEQISSUEDCOLGATE SCAFFOLDING02/22/2007
BIS—ISSUEDBARR & BARR INC04/24/2001
+ 38 more permits on file
4 projects · most recent 06/05/2026
Heating and Air Conditioning Systems Ventilation Systems Air Conditioning Systems Associated Ducts and Piping Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
06/05/2026——Heating and Air Conditioning Systems
Heat / Cool
Trane FCCB060 12,230 BTU · Fan Coil Indoor ×1
03/26/2026——Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric MXZ-3D24NL 220,000 BTU · Split System ×1
Ventilation
Greenheck VK-H-10-5 600 CFM · Kitchen Exhaust ×1
12/20/2024Permit IssuedEESON CONSTRUCTION TSG LLAir Conditioning Systems, Heating and Air Conditioning Systems
Cooling
Mitsubishi Electric PUY-A24NHA7 24,000 BTU · Condensing Unit ×1
Stulz SCS-012-SSA 12,284 BTU · Condensing Unit ×1
Heat / Cool
Aaon RN008 2,050 CFM · Rooftop Unit ×1
RN025 7,200 CFM · Rooftop Unit ×1
08/02/2021Permit IssuedV.P.H. MECHANICAL CORPAir Conditioning Systems, Associated Ducts and Piping, Heating Systems, Ventilation Systems
Cooling
Mitsubishi Electric PUHY-EP96YNU-A 96,000 BTU · Vrf Outdoor ×1
Heating
Mitsubishi Electric PUHY-EP96YNU-A 108,000 BTU · Vrf Outdoor ×1
Ventilation
Greenheck VEKTOR-HS-12 1,910 CFM · Exhaust Fan ×1
3 projects · most recent 06/05/2026
Sprinkler System
FiledStatusContractorScope
06/05/2026——Sprinkler System
03/26/2026——Sprinkler System
03/25/2026——Sprinkler System
2 projects · most recent 03/26/2026
Medical Gas Water/Sanitary Gas Storm
FiledStatusContractorScope
03/26/2026——Medical Gas, Water/Sanitary
03/25/2026——Gas, Medical Gas, Storm, Water/Sanitary
2 projects · most recent 10/30/2024
General Wiring
FiledStatusContractorScope
10/30/2024Permit IssuedASKO ELEC CONST & MAIN INGeneral Wiring
08/25/2020Permit IssuedNEWBRIDGE ELECTL CONTNG—
1 project · most recent 03/25/2026
Steel Concrete Masonry
FiledStatusContractorScope
03/25/2026——Steel, Concrete, Masonry
▾Field Inspections (DOB CAP) — 22
DateTypeResultReport
09/16/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/21/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/16/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/08/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/31/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/01/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/18/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/11/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/15/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/16/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/12/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/12/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/17/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/05/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/26/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/03/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/15/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/14/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/22/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/17/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/09/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/18/2021Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 137
DateRequirementInspectorRole
06/03/2026Sprinkler Systems—special
06/03/2026Fire-Resistant Penetrations and Joints—special
06/03/2026Post-installed Anchors—special
06/03/2026Seismic Isolation Systems—special
06/02/2026Mechanical Systems—special
06/02/2026HVAC-R and service water piping design and insulation—energy_progress
06/02/2026Maintenance information—energy_progress
06/02/2026HVAC-R and service water heating equipment—energy_progress
06/02/2026HVAC-R and service water heating system controls—energy_progress
06/02/2026Energy Code Compliance Inspections—progress
06/02/2026Final—progress
05/22/2026Fire-Resistant Penetrations and Joints—special
05/22/2026Fire-Resistance Rated Construction—progress
05/22/2026Interior lighting power—energy_progress
05/22/2026Final—progress
03/23/2026Mechanical Systems—special
03/23/2026Final—progress
03/23/2026HVAC-R and service water piping design and insulation—energy_progress
02/25/2026Fire-Resistant Penetrations and Joints—special
02/25/2026Sprinkler Systems—special
02/25/2026Post-installed Anchors—special
02/23/2026Mechanical Systems—special
02/23/2026Final—progress
02/23/2026HVAC-R and service water heating system controls—energy_progress
02/23/2026HVAC-R and service water piping design and insulation—energy_progress
Latest 25 of 137.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Jamaica Hospital Medical CenterMedical / HealthcareFloors 1, 5
Project Q01406503 Alteration · Plan Examiner Review · 05/29/2026
Project Q01376321 Alteration · Approved · 03/26/2026
Project Q00771665 Alteration · LOC Issued · 08/18/2022
Project Q00771678 Alteration · LOC Issued · 08/17/2022
Project Q00771693 Alteration · LOC Issued · 08/17/2022
Project Q00771705 Alteration · LOC Issued · 08/17/2022
Project Q00459715 Alteration · LOC Issued · 02/08/2021
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 407 on file (BIS + DOB NOW)
▸Plans & Drawings46
▸DOB NOWPlans/Sketch36
08/27/2026Q00524663-I1Request digital key ↗
08/27/2026Q00524683-I1Request digital key ↗
08/27/2026Q00524658-I1Request digital key ↗
Showing 3 of 36 on file for this type
▸DOB NOWPlans/Sketch - General Construction3
08/27/2026Q00459715-I1Request digital key ↗
08/27/2026Q00459715-P1Request digital key ↗
08/15/2026Q00450821-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler2
08/27/2026Q00459790-I1Request digital key ↗
08/15/2026Q00459790-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
08/21/2026Q00459814-P1Request digital key ↗
08/21/2026Q00459814-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
08/27/2026Q00459858-I1Request digital key ↗
08/27/2026Q00459858-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/27/2026Q00419048-I1Request digital key ↗
▸Applications & Permits32
▸BISPLAN / WORK APPROVAL APPLICATION19
12/27/2019421780442Open ↗
12/17/2015421035560Open ↗
02/05/2015421035560Open ↗
Showing 3 of 19 on file for this type
▸BISWORK PERMIT APPLICATION9
06/26/2020421780442Open ↗
06/29/2015421035560Open ↗
11/28/2014421035631Open ↗
Showing 3 of 9 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION3
08/12/2010420044918Open ↗
07/29/2010420044918Open ↗
04/12/2012420044918Open ↗
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
10/06/2010420179470Open ↗
▸Zoning, Tax Lot & Property Records5
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026Q01132754-I1Open ↗
08/13/2026Q01264753-I1Open ↗
▸BISZoning Diagram (ZD1)1
08/27/2010420211130Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q01264753-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026Q01264753-I1Open ↗
▸Seals & Professional Certifications106
▸DOB NOWDPL-1: Design Professional Seal & Signature46
08/27/2026Q00419048-I1Open ↗
08/27/2026Q00459858-I1Open ↗
08/27/2026Q00459858-P1Open ↗
Showing 3 of 46 on file for this type
▸DOB NOWProgress Inspector Seal & Signature23
09/26/2026Q00459858-P1Open ↗
09/26/2026Q00459858-P1Open ↗
09/26/2026Q00459858-P1Open ↗
Showing 3 of 23 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION22
12/27/2019421780442Open ↗
01/09/2017421035560Open ↗
10/26/2016421035560Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
09/26/2026Q00459858-P1Open ↗
09/18/2026Q00771665-I1Open ↗
09/01/2026Q00771630-I1Open ↗
Showing 3 of 13 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
12/27/2019421780442Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
12/27/2019421780442Open ↗
▸Trade Schedules & Equipment28
▸BISSELF-CERT PLUMBING NOTICE13
12/10/2015421035631Open ↗
08/05/2011420044918Open ↗
03/14/2011420044918Open ↗
Showing 3 of 13 on file for this type
▸BISSCHEDULE B - PLUMBING6
09/05/2013420887936Open ↗
07/02/2010420211130Open ↗
05/03/2010420179489Open ↗
Showing 3 of 6 on file for this type
▸BISPLUMBING - SUPPORTING DOCUMENTATION3
07/16/2010420179470Open ↗
07/16/2010420179470Open ↗
07/16/2010420179470Open ↗
▸BISSPRINKLER INSP REPORT : FP-852
09/01/2010420044918Open ↗
07/08/2010420044918Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA2
03/14/2011420044918Open ↗
11/18/2010420068214Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
02/05/2015421035560Open ↗
10/03/2014421035631Open ↗
▸Safety & Tenant Protection6
▸BISSTREET TREE CHECKLIST4
07/02/2010420211130Open ↗
05/03/2010420179489Open ↗
05/03/2010420179470Open ↗
Showing 3 of 4 on file for this type
▸BISTenant Protection Plan and Notes1
12/27/2019421780442Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026Q01264753-I1Open ↗
▸Environmental & Asbestos53
▸DOB NOWDEP ACP-5: Asbestos Assessment Report43
08/27/2026Q00459858-I1Open ↗
08/27/2026Q00459858-P1Open ↗
08/27/2026Q00459790-I1Open ↗
Showing 3 of 43 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'6
07/02/2010420211130Open ↗
05/03/2010420179489Open ↗
05/03/2010420179470Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
12/27/2019421780442Open ↗
02/05/2015421035560Open ↗
09/05/2013420887936Open ↗
▸BISASBESTOS-EXEMPTION (ASB4)1
10/03/2014421035631Open ↗
▸Energy Compliance10
▸DOB NOWEN2: As Built Energy Analysis.4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
12/27/2019421780442Open ↗
11/28/2014421035631Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
08/26/2021421780442Open ↗
▸BISTR8: Energy Code Progress Inspections1
04/12/2012420044918Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
06/26/2020421780442Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
08/26/2021421780442Open ↗
▸Inspections & Test Reports2
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
06/26/2020421780442Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
08/26/2021421780442Open ↗
▸Approvals, Objections & Sign-offs69
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter45
08/27/2026Q00459790-I1Open ↗
08/27/2026Q00459715-I1Open ↗
08/27/2026Q00459715-P1Open ↗
Showing 3 of 45 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION9
12/27/2019421780442Open ↗
02/19/2015421035560Open ↗
02/19/2015421035560Open ↗
Showing 3 of 9 on file for this type
▸BISADMINISTRATIVE OBJECTIONS8
02/05/2015421035560Open ↗
09/05/2013420887936Open ↗
07/02/2010420211130Open ↗
Showing 3 of 8 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
08/26/2021421780442Open ↗
01/09/2017421035560Open ↗
11/18/2010420068223Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE2
08/11/2009420044918Open ↗
07/01/2009420044918Open ↗
▸Cost, Insurance & Ownership19
▸BISCOST AFFIDAVIT18
08/26/2021421780442Open ↗
12/27/2019421780442Open ↗
01/09/2017421035560Open ↗
Showing 3 of 18 on file for this type
▸BISDEPT OF FINANCE VERIFICATION1
03/17/2012420044918Open ↗
▸Filing & Intake Forms18
▸BISEFILING COVER SHEET14
12/27/2019421780442Open ↗
02/05/2015421035560Open ↗
10/03/2014421035631Open ↗
Showing 3 of 14 on file for this type
▸BISADDITIONAL INFORMATION4
01/06/2020421780442Open ↗
12/27/2019421780442Open ↗
10/26/2016421035560Open ↗
Showing 3 of 4 on file for this type
▸Other Documents13
▸DOB NOWPlot Diagram5
08/13/2026Q01264753-S4Open ↗
08/13/2026Q01264753-S2Open ↗
08/13/2026Q01132754-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPLOT DIAGRAM2
08/11/2009420044918Open ↗
07/01/2009420044918Open ↗
▸DOB NOWSite Survey: Initial2
08/13/2026Q01264753-I1Open ↗
08/13/2026Q01132754-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWProperty Ownership Certification1
08/18/2026Q01264753-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q01264753-I1Open ↗