← Back
Four families
89 2 PLACE
BROOKLYN · BIN 3005160
💬 Discuss this project
1930Year Built
3Stories
C3Building Class
R6BZoning
3,717 sfGross Floor Area
4Units
Rent Stabilized10 Open Violations ▸
Four families · Owner of record: 89 2ND PLACE LLC · 1,875 sf lot · 1.98 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Bulkhead1p · 1 filing · 14 docs
Floor 21p · 1 filing · 14 docs
Floor 1
Basement1p · 1 filing · 14 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
OWNER'S REP407/08/2026
89 2ND PLACE LLC1407/08/2026
OWNER OF 89 2 PL103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/09/2022$3.7M—— → —$989/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MICHAEL SCADUTO ARCHITECT503/02/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ISLAND INTERIORS DESIGNGeneral Contractor207/08/2026
ROCK E SMALL PLBG&HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MICHAEL SCADUTO ARCHITECT4833503/02/2023
Building Lifecycle
All (104)Filed (5)Permit Issued (3)Signed Off (3)Violation (25)Inspection (8)Objection (36)Special Inspection (24)
06/05/2025
Violation issued (HPD, closed)
A
06/04/2024
Signed off — Alteration
INTERIOR RENOVATION, HORIZONTAL ENLARGEMENT, AND NEW STAIR BULKHEAD AND ROOF DECK PER BB 2018-002 OF EXISTING 4-STORY, 4-UNIT MULTIFAMILY MASONRY RESIDENCE. WORK INCLUDES PARTITIONS, DOORS, FIXTURES & FINISHES.
B00735567-I1
04/03/2024
Violation issued (HPD, closed)
A
03/11/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
02/27/2024
Signed off — Alteration
B08019003-I1
02/26/2024
Signed off — Alteration
PLUMBING WORK IN CONJUNCTION WITH ALT-GC RENOVATION OF EXISTING 4-STORY, 4-FAMILY TOWNHOUSE: REPLACE, RELOCATE AND NEW PLUMBING FIXTURES AND PIPING THROUGHOUT.
B00735599-I1
02/08/2024
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
02/08/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/06/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
02/06/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/06/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
01/24/2024
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
01/24/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
01/16/2024
Permit issued — General Construction
B00735567-I1-GC
01/05/2024
Special inspection requirement — Lighting in dwelling units
Michael Scaduto
01/05/2024
Special inspection requirement — Fireplaces
Michael Scaduto
01/05/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Michael Scaduto
01/05/2024
Special inspection requirement — HVAC-R and service water heating equipment
Michael Scaduto
01/05/2024
Special inspection requirement — Fenestration air leakage
Michael Scaduto
01/05/2024
Special inspection requirement — Air barrier - visual inspection
Michael Scaduto
01/05/2024
Special inspection requirement — Insulation placement and R values
Michael Scaduto
01/05/2024
Special inspection requirement — HVAC-R and service water heating system controls
Michael Scaduto
01/05/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Michael Scaduto
01/05/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Michael Scaduto
01/05/2024
Special inspection requirement — Subgrade Inspections
Michael Scaduto
01/05/2024
Special inspection requirement — Masonry
Michael Scaduto
01/05/2024
Special inspection requirement — Concrete - Cast-In-Place
Michael Scaduto
01/05/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Michael Scaduto
01/05/2024
Special inspection requirement — Energy Code Compliance Inspections
Michael Scaduto
01/05/2024
Special inspection requirement — Fire-Resistance Rated Construction
Michael Scaduto
01/02/2024
Objection resolved — Addressed
12/21/2023
Objection resolved — Addressed
12/21/2023
Objection resolved — Addressed
12/09/2023
Objection resolved — Addressed
11/22/2023
Violation issued (HPD, closed)
I
06/16/2023
Permit issued — Plumbing
B00735599-I1-PL
03/17/2023
Violation issued (HPD, closed)
A
03/07/2023
Objection raised — Other
03/07/2023
Objection raised — Scope
03/07/2023
Objection raised — Zoning
03/07/2023
Objection raised — Fire_Protection
03/06/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Michael Scaduto
03/06/2023
Special inspection requirement — Energy Code Compliance Inspections
Michael Scaduto
03/06/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Michael Scaduto
03/06/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Michael Scaduto
03/03/2023
Objection raised — Admin
03/03/2023
Objection resolved — Addressed
03/02/2023
Filed — Alteration
PLUMBING WORK IN CONJUNCTION WITH ALT-GC RENOVATION OF EXISTING 4-STORY, 4-FAMILY TOWNHOUSE: REPLACE, RELOCATE AND NEW PLUMBING FIXTURES AND PIPING THROUGHOUT.
B00735599-P1
03/02/2023
Filed — Alteration
INTERIOR RENOVATION, HORIZONTAL ENLARGEMENT, AND NEW STAIR BULKHEAD AND ROOF DECK PER BB 2018-002 OF EXISTING 4-STORY, 4-UNIT MULTIFAMILY MASONRY RESIDENCE. WORK INCLUDES PARTITIONS, DOORS, FIXTURES & FINISHES.
B00735567-P1
02/22/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Michael Scaduto
02/22/2023
Special inspection requirement — Energy Code Compliance Inspections
Michael Scaduto
02/22/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Michael Scaduto
02/22/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Michael Scaduto
11/18/2022
Permit issued — General Construction
B08019003-I1-GC
11/14/2022
Violation issued (HPD, closed)
I
10/28/2022
Objection raised — Other
10/28/2022
Objection resolved — Addressed
10/21/2022
Objection raised — Fire_Protection
10/21/2022
Objection resolved — Addressed
10/11/2022
Filed — Alteration
B08019003-I1
Latest 60 of 104 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offISLAND INTERIORS DESIGN01/16/2024
DOB NOWPlumbingSigned-offROCK E SMALL PLBG&HTG INC06/16/2023
DOB NOWGeneral ConstructionSigned-offISLAND INTERIORS DESIGN11/18/2022
BISOTISSUEDBRIDGEWATER PLBG & HTG INC05/06/2004
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
03/11/2024Pass-Final General Construction Non-Directive 14PassView ↗
02/08/2024Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
02/08/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/06/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
02/06/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/06/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
01/24/2024Fail-Final General Construction Non-Directive 14FailView ↗
01/24/2024Pass-Final General Construction Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 24
DateRequirementInspectorRole
01/05/2024Lighting in dwelling unitsMichael Scadutoenergy_progress
01/05/2024FireplacesMichael Scadutoenergy_progress
01/05/2024HVAC-R and service water piping design and insulationMichael Scadutoenergy_progress
01/05/2024HVAC-R and service water heating equipmentMichael Scadutoenergy_progress
01/05/2024Fenestration air leakageMichael Scadutoenergy_progress
01/05/2024Air barrier - visual inspectionMichael Scadutoenergy_progress
01/05/2024Insulation placement and R valuesMichael Scadutoenergy_progress
01/05/2024HVAC-R and service water heating system controlsMichael Scadutoenergy_progress
01/05/2024Fenestration and door U-factor and product ratingsMichael Scadutoenergy_progress
01/05/2024Fire-Resistant Penetrations and JointsMichael Scadutospecial
01/05/2024Subgrade InspectionsMichael Scadutospecial
01/05/2024MasonryMichael Scadutospecial
01/05/2024Concrete - Cast-In-PlaceMichael Scadutospecial
01/05/2024Structural Stability – Alterations of existing buildingsMichael Scadutospecial
01/05/2024Energy Code Compliance InspectionsMichael Scadutoprogress
01/05/2024Fire-Resistance Rated ConstructionMichael Scadutoprogress
03/06/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationMichael Scadutospecial
03/06/2023Energy Code Compliance InspectionsMichael Scadutoprogress
03/06/2023HVAC-R and service water piping design and insulationMichael Scadutoenergy_progress
03/06/2023Fire-Resistant Penetrations and JointsMichael Scadutospecial
02/22/2023Fire-Resistant Penetrations and JointsMichael Scadutospecial
02/22/2023Energy Code Compliance InspectionsMichael Scadutoprogress
02/22/2023HVAC-R and service water piping design and insulationMichael Scadutoenergy_progress
02/22/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationMichael Scadutospecial
▾Documents — 37 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/29/2026B00735599-I1Request digital key ↗
08/28/2026B08019003-I1Request digital key ↗
08/15/2026B00735567-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram2
08/15/2026B00735567-I1Open ↗
08/15/2026B00735567-P1Open ↗
▸Seals & Professional Certifications15
▸DOB NOWSpecial Inspector Seal & Signature5
09/27/2026B00735567-I1Open ↗
08/25/2026B00735599-P1Open ↗
08/25/2026B00735599-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/27/2026B00735567-I1Open ↗
09/27/2026B00735567-I1Open ↗
08/25/2026B00735599-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/29/2026B00735599-I1Open ↗
08/29/2026B00735567-I1Open ↗
08/29/2026B00735567-P1Open ↗
Showing 3 of 5 on file for this type
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/15/2026B00735567-I1Open ↗
08/15/2026B00735567-P1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/29/2026B00735599-I1Open ↗
08/28/2026B08019003-I1Open ↗
08/15/2026B00735567-I1Open ↗
Showing 3 of 5 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis2
08/15/2026B00735567-I1Open ↗
08/13/2026B00735599-I1Open ↗
▸Other Documents6
▸DOB NOWSite Survey: Initial2
08/15/2026B00735567-I1Open ↗
08/15/2026B00735567-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/15/2026B00735567-I1Open ↗
08/15/2026B00735567-P1Open ↗
▸DOB NOWPlot Diagram2
08/15/2026B00735567-I1Open ↗
08/15/2026B00735567-P1Open ↗