← Back
Two stories - detached, small or mid-size
89-21 183 STREET
QUEENS · Jamaica · BIN 4212527
💬 Discuss this project
1925Year Built
2.5Stories
A1Building Class
R4-1Zoning
1,248 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 2,500 sf lot · 0.5 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralGeneral
Roof9p · 1 filing · 7 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MOMENTUM SOLAR105/10/2024
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MXV SIA LLC9281105/10/2024
Building Lifecycle
All (8)Filed (1)Violation (2)Special Inspection (5)
05/10/2024
Filed — Alteration
Installation of solar panels; Rooftop, Railed, Grid tied, 14 Panels, 5.74 kW
Q01048625-I1
05/09/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mina Makar
05/09/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Mina Makar
05/09/2024
Special inspection requirement — Energy Code Compliance Inspections
Mina Makar
05/09/2024
Special inspection requirement — Final
Mina Makar
05/09/2024
Special inspection requirement — Air barrier - visual inspection
Mina Makar
03/07/2012
Violation issued (ECB, closed)
Unknown
03/07/2012
Violation issued (ECB, closed)
Unknown
Nothing on file for this building.
1 project · most recent 05/09/2024
FiledStatusContractorScope
05/09/2024CompleteISLAND ELECTRIC CORP—
1 project · most recent 05/10/2024
FiledStatusContractorScope
05/10/2024——28 panels, 11.48 kw, 247 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
05/09/2024Fire-Resistant Penetrations and JointsMina Makarspecial
05/09/2024Structural Stability – Alterations of existing buildingsMina Makarspecial
05/09/2024Energy Code Compliance InspectionsMina Makarprogress
05/09/2024FinalMina Makarprogress
05/09/2024Air barrier - visual inspectionMina Makarenergy_progress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/22/2026Q01048625-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature2
08/27/2026Q01048625-I1Open ↗
08/27/2026Q01048625-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026Q01048625-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/27/2026Q01048625-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026Q01048625-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01048625-I1Open ↗