2 Open Violations 0 unresolved · 2 paperwork only▸
ECB01/05/2026OBSERVED REMOVED ALL THE EXISTING ELECTRICAL WIRINGS ALONG WITH THE ELECTRICAL FIXTURES. NO PERMIT FOR THIS ELECTRICAL WORK AT THE TIME OF INSPECTION., OBTAIN PERMITNothing owed — awaiting certificate of correction
ECB01/05/2026OBSERVED, DEMOLITION WORK DONE THROUGHOUT THE FIRST FLOOR. REMOVED ALL THE FIRE STOPPING TO EXPOSE THE WOOD MEMBERS OF THE BUILDING STRUCTURE. NO PERMIT FOR THIS WORK AT THE TIME OF INSPECTION., OBTAIN PERMITNothing owed — awaiting certificate of correction
Two stories - detached, small or mid-size · 2,367 sf lot · 0.53 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.