BuildNYC
Miscellaneous one family
89-33 85TH STREET
QUEENS · Woodhaven · BIN 4185498
💬 Discuss this project
1915Year Built
2Stories
A9Building Class
R3-1Zoning
1,344 sfGross Floor Area
1Units
4 Active Violations 0 unresolved · 4 paperwork only ▸FDNY Report ↗
Miscellaneous one family · 2,000 sf lot · 0.67 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofResidential Rooftop Grid-tied Solar PV System2p · 1 filing · 4 docs
AtticUnder Construction2p · 1 filing · 12 docs
Floor 2Under Construction2p · 1 filing · 12 docs
Floor 1Under Construction2p · 1 filing · 12 docs
CellarUnder Construction7p · 1 filing · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Innospark Design410/13/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/21/2025$725K—— → —$539/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Aaron McDonald Architect205/04/2026
Chun Feng, Architect106/04/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Basic Groups203/21/2026
Amergy Solar203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Amergy SolarGeneral Contractor303/21/2026
Mercury Building AssociatesGeneral Contractor109/09/2026
W.R. Plumbing and HeatingPlumbing109/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Nic Design9758108/15/2025
Sq. Arch4802106/04/2025
Building Lifecycle
All (23)Filed (3)Permit Issued (3)Signed Off (1)Violation (4)Special Inspection (12)
09/08/2026
Permit issued — Plumbing
Q01268726-S2-PL
09/08/2026
Permit issued — General Construction
Q01268726-I1-GC-CX
05/04/2026
Filed — Alteration
INSTALL NEW PLUMBING FIXTURES IN THE EXISTING 2 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
Q01268726-S2
11/18/2025
Special inspection requirement — Energy Code Compliance Inspections
Eric Sun
11/18/2025
Special inspection requirement — Fire-Resistance Rated Construction
Eric Sun
10/20/2025
Special inspection requirement — Tenant Protection Plan Compliance
Eric Sun
10/20/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Sun
08/15/2025
Filed — Alteration
INSTALL NEW PLUMBING FIXTURES IN THE EXISTING 2 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
Q01268726-I1
08/12/2025
Signed off — Alteration
Q01234460-I1
08/08/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Eric Sun
08/08/2025
Special inspection requirement — HVAC-R and service water heating equipment
Eric Sun
08/08/2025
Special inspection requirement — HVAC-R and service water heating system controls
Eric Sun
08/08/2025
Special inspection requirement — Interior lighting power
Eric Sun
08/08/2025
Special inspection requirement — Maintenance information
Eric Sun
08/08/2025
Special inspection requirement — Mechanical Systems
Eric Sun
08/08/2025
Special inspection requirement — Final
Eric Sun
08/08/2025
Special inspection requirement — Insulation placement and R values
Eric Sun
07/11/2025
Violation issued (ECB, open)
Construction
07/11/2025
Violation issued (ECB, open)
Unknown
07/11/2025
Violation issued (ECB, open)
Construction
07/11/2025
Violation issued (ECB, open)
Construction
06/10/2025
Permit issued — Solar
Q01234460-I1-SL
06/04/2025
Filed — Alteration
Q01234460-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedW.R. Plumbing and Heating09/08/2026
DOB NOWGeneral ConstructionPermit IssuedMercury Building Associates09/08/2026
DOB NOWSolarSigned-offAmergy Solar06/10/2025
1 project · most recent 05/04/2026
Gas Water/Sanitary
FiledStatusContractorScope
05/04/2026Permit IssuedEflow Plumbing & WatermainGas, Water/Sanitary
2 projects · most recent 09/24/2026
General Wiring
FiledStatusContractorScope
09/24/2026Permit IssuedSwitch Electric of the FiveGeneral Wiring
06/03/2025CompleteI.P. Electric—
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
11/18/2025Energy Code Compliance InspectionsEric Sunprogress
11/18/2025Fire-Resistance Rated ConstructionEric Sunprogress
10/20/2025Tenant Protection Plan ComplianceEric Sunspecial
10/20/2025Fire-Resistant Penetrations and JointsEric Sunspecial
08/08/2025HVAC-R and service water piping design and insulationEric Sunenergy_progress
08/08/2025HVAC-R and service water heating equipmentEric Sunenergy_progress
08/08/2025HVAC-R and service water heating system controlsEric Sunenergy_progress
08/08/2025Interior lighting powerEric Sunenergy_progress
08/08/2025Maintenance informationEric Sunenergy_progress
08/08/2025Mechanical SystemsEric Sunspecial
08/08/2025FinalEric Sunprogress
08/08/2025Insulation placement and R valuesEric Sunenergy_progress
▾Documents — 15 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/20/2026Q01234460-I1Request digital key ↗
08/17/2026Q01268726-I1Request digital key ↗
08/17/2026Q01268726-S2Request digital key ↗
▸Seals & Professional Certifications8
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/20/2026Q01234460-I1Open ↗
08/17/2026Q01268726-I1Open ↗
08/17/2026Q01268726-S2Open ↗
▸DOB NOWProgress Inspector Seal & Signature3
08/27/2026Q01268726-I1Open ↗
08/27/2026Q01268726-I1Open ↗
08/27/2026Q01268726-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/27/2026Q01268726-I1Open ↗
08/27/2026Q01268726-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/20/2026Q01234460-I1Open ↗
08/17/2026Q01268726-I1Open ↗
08/17/2026Q01268726-S2Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01234460-I1Open ↗