← Back
Two stories - detached, small or mid-size
89-34 184 STREET
QUEENS · Jamaica · BIN 4212549
💬 Discuss this project
1925Year Built
2Stories
A1Building Class
R4-1Zoning
1,408 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 2,500 sf lot · 0.56 FAR built · Flood zone X
Locations of Work
Electrical
Roof3p · 1 filing · 10 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MOMENTUM SOLAR205/02/2025
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MXV SIA LLC9281205/02/2025
Building Lifecycle
All (9)Filed (2)Permit Issued (1)Signed Off (1)Special Inspection (5)
09/18/2025
Signed off — Alteration
Installation of solar panels; Rooftop, Railed, Grid tied, 18 Panels, 7.2 kW
Q01126972-I1
05/02/2025
Filed — Alteration
Installation of solar panels; Rooftop, Railed, Grid tied, 18 Panels, 7.2 kW
Q01126972-P1
05/02/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mina Makar
05/02/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Mina Makar
05/02/2025
Special inspection requirement — Energy Code Compliance Inspections
Mina Makar
05/02/2025
Special inspection requirement — Final
Mina Makar
05/02/2025
Special inspection requirement — Air barrier - visual inspection
Mina Makar
10/18/2024
Permit issued — Solar
Q01126972-I1-SL
10/15/2024
Filed — Alteration
Installation of solar panels; Rooftop, Railed, Grid tied, 18 Panels, 7.2 kW
Q01126972-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offMOMENTUM SOLAR10/18/2024
1 project · most recent 10/15/2024
FiledStatusContractorScope
10/15/2024CompleteISLAND ELECTRIC CORP—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
05/02/2025Fire-Resistant Penetrations and JointsMina Makarspecial
05/02/2025Structural Stability – Alterations of existing buildingsMina Makarspecial
05/02/2025Energy Code Compliance InspectionsMina Makarprogress
05/02/2025FinalMina Makarprogress
05/02/2025Air barrier - visual inspectionMina Makarenergy_progress
▾Documents — 10 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/20/2026Q01126972-I1Request digital key ↗
08/20/2026Q01126972-P1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/20/2026Q01126972-I1Open ↗
08/20/2026Q01126972-P1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/19/2026Q01126972-P1Open ↗
09/19/2026Q01126972-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/19/2026Q01126972-P1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/20/2026Q01126972-I1Open ↗
08/20/2026Q01126972-P1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01126972-I1Open ↗