← Back
BuildNYC
Elevator apt, semi-fireproof without stores
89-38 164TH STREET
QUEENS · Jamaica · BIN 4209583
💬 Discuss this project
1928Year Built
6Stories
D1Building Class
C4-4DZoning
135,643 sfGross Floor Area
200Units
LL97 CoveredRent Stabilized115 Active Violations 114 unresolved · 1 paperwork only ▸FDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: SM Realty · 38,200 sf lot · 3.55 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofBuilding facade repairsUnder Construction1p · 1 filing · 6 docs
Floor 1Installation of Heavy Duty Sidewalk ShedUnder Construction5p · 1 filing · 2 docs
Site & exteriorBuilding facade repairsUnder Construction7p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SM Realty703/22/2026
Bayswater Gardens310/04/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Node Architecture, Engineering, Cons208/13/2026
McHenery Testing Lab106/02/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Node Engineering Consulting203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Habana Electric CoElectrical103/21/2026
Palladium Construction CoGeneral Contractor110/04/2026
Akala ConstructionScaffold109/03/2026
Elite Quality ConstructionScaffold109/25/2026
JascoScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Node Architecture, Engineering6799208/13/2026
RI Consulting Services8904106/02/2026
Building Lifecycle
All (80)Filed (4)Permit Issued (4)Violation (60)Objection (4)Special Inspection (8)
09/24/2026
Permit issued — Suspended Scaffold
Q01406840-I1-SC
09/04/2026
Permit issued — General Construction
Q01095937-I1-GC
09/02/2026
Permit issued — Sidewalk Shed
Q01410582-I1-SH
08/14/2026
Special inspection requirement — Masonry
Radomir Delic
08/14/2026
Special inspection requirement — Tenant Protection Plan Compliance
Radomir Delic
08/14/2026
Special inspection requirement — Final
Radomir Delic
08/13/2026
Filed — Alteration
Filing Application for Facade Repairs
Q01095937-P1
08/04/2026
Special inspection requirement — Masonry
Radomir Delic
08/04/2026
Special inspection requirement — Tenant Protection Plan Compliance
Radomir Delic
08/04/2026
Special inspection requirement — Final
Radomir Delic
07/15/2026
Violation issued (HPD, open)
C
06/17/2026
Violation issued (HPD, open)
B
06/17/2026
Violation issued (HPD, open)
B
06/15/2026
Objection raised — Other
06/15/2026
Objection resolved — Addressed
06/11/2026
Objection raised — Other
06/11/2026
Objection resolved — Addressed
06/10/2026
Violation issued (HPD, open)
B
06/02/2026
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Q01410582-I1
06/02/2026
Filed — Alteration
SUSPENDED SCAFFOLD OUTRIGGER SYSTEM INSTALLATION FOR FACADE REPAIRS AND INSPECTIONS.
Q01406840-I1
06/02/2026
Permit issued — Sidewalk Shed
Q01410582-I1-SH
05/24/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Md Istiaque Hasan
05/24/2026
Special inspection requirement — Post-installed Anchors
Md Istiaque Hasan
05/16/2026
Violation issued (HPD, closed)
B
05/16/2026
Violation issued (HPD, closed)
B
05/16/2026
Violation issued (HPD, closed)
B
04/24/2026
Violation issued (HPD, closed)
C
04/24/2026
Violation issued (HPD, closed)
C
04/24/2026
Violation issued (HPD, closed)
B
04/24/2026
Violation issued (HPD, closed)
B
04/24/2026
Violation issued (HPD, closed)
C
02/18/2026
Violation issued (HPD, closed)
C
01/28/2026
Violation issued (HPD, closed)
C
01/28/2026
Violation issued (HPD, closed)
C
08/15/2025
Violation issued (HPD, closed)
B
08/15/2025
Violation issued (HPD, closed)
C
08/15/2025
Violation issued (HPD, closed)
C
08/15/2025
Violation issued (HPD, closed)
B
08/15/2025
Violation issued (HPD, closed)
B
08/15/2025
Violation issued (HPD, closed)
C
03/19/2025
Violation issued (HPD, closed)
C
11/03/2024
Violation issued (HPD, closed)
C
11/03/2024
Violation issued (HPD, closed)
C
11/03/2024
Violation issued (HPD, closed)
B
11/03/2024
Violation issued (HPD, closed)
B
11/03/2024
Violation issued (HPD, closed)
B
11/03/2024
Violation issued (HPD, closed)
B
08/29/2024
Filed — Alteration
Filing Application for Facade Repairs
Q01095937-I1
06/14/2024
Violation issued (HPD, closed)
B
06/14/2024
Violation issued (HPD, closed)
B
06/14/2024
Violation issued (HPD, closed)
C
06/04/2024
Violation issued (HPD, closed)
B
06/04/2024
Violation issued (HPD, closed)
A
06/04/2024
Violation issued (HPD, closed)
A
06/04/2024
Violation issued (HPD, closed)
C
06/04/2024
Violation issued (HPD, closed)
B
06/04/2024
Violation issued (HPD, closed)
C
04/25/2024
Violation issued (HPD, closed)
A
04/25/2024
Violation issued (HPD, closed)
C
04/25/2024
Violation issued (HPD, closed)
C
Latest 60 of 80 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedElite Quality Construction09/24/2026
DOB NOWGeneral ConstructionPermit IssuedPalladium Construction Co09/04/2026
DOB NOWSidewalk ShedPermit IssuedAkala Construction09/02/2026
DOB NOWSidewalk ShedPermit IssuedJasco06/02/2026
BISPLISSUEDA & C Heating Services06/08/2007
BISPLISSUEDPositive PLG and Heating07/02/2001
BISFBISSUEDPositive PLG and Heating06/27/2001
BISPLISSUEDDual Fuel PLG and Heating01/28/1998
2 projects · most recent 06/02/2026
General Wiring
FiledStatusContractorScope
06/02/2026Permit IssuedRichard Neu—
09/26/2025CompleteKenneth ElectricGeneral Wiring
1 project · most recent 06/02/2026
Sidewalk Shed
FiledStatusContractorScope
06/02/2026Permit IssuedAkala ConstructionSidewalk Shed
1 project · most recent 06/02/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
06/02/2026Permit IssuedElite Quality ConstructionSuspended Scaffold (SC)
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
08/14/2026MasonryRadomir Delicspecial
08/14/2026Tenant Protection Plan ComplianceRadomir Delicspecial
08/14/2026FinalRadomir Delicprogress
08/04/2026MasonryRadomir Delicspecial
08/04/2026Tenant Protection Plan ComplianceRadomir Delicspecial
08/04/2026FinalRadomir Delicprogress
05/24/2026Alternative Materials - OTCR Buildings Bulletin NumberMd Istiaque Hasanspecial
05/24/2026Post-installed AnchorsMd Istiaque Hasanspecial
▾Documents — 13 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/21/2026Q01095937-P1Request digital key ↗
08/21/2026Q01095937-I1Request digital key ↗
08/16/2026Q01410582-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/21/2026Q01095937-P1Open ↗
08/21/2026Q01095937-I1Open ↗
08/16/2026Q01410582-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/28/2026Q01406840-I1Open ↗
08/28/2026Q01406840-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/21/2026Q01095937-P1Open ↗
08/21/2026Q01095937-I1Open ↗
▸Other Documents2
▸DOB NOWManufacturer's Specifications1
08/15/2026Q01406840-I1Open ↗
▸DOB NOWCalculations1
08/15/2026Q01406840-I1Open ↗