← Back
BuildNYC
Elevator cooperative
Lindenwood Village Sec. E
89-40 151ST AVENUE · BIN 4434848
💬 Discuss this project
1962Year Built
6Stories
D4Building Class
R5Zoning
152,100 sfGross Floor Area
150Units
LL97 CoveredRent Stabilized97 Active Violations 93 unresolved · 4 paperwork only ▸FISP: SWARMPFDNY Report ↗
Elevator cooperative · 104,752 sf lot · 1.45 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofReplacement of existing roofing materialsUnder Construction7p · 3 filings · 20 docs
Floor 1Under Construction5p · 1 filing · 2 docs
CellarBoiler and oil tank replacement1p · 3 filings · 20 docs
BasementNew stainless steel liner in existing brick chimney1p · 1 filing · 6 docs
Site & exteriorProposed heavy duty sidewalk shedUnder Construction8p · 2 filings · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Lindenwood Village Sec E Coop1003/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AZ Professional Engineering109/11/2026
Trevor O. Flowers109/08/2026
Paradigm Architecture101/13/2025
MSM Engineering Services111/26/2024
Robert Germain Jr. PE402/09/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Rigid Structural Design403/21/2026
Municipal Building Consultants103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Aggressive Heatingspecialty_contractor307/08/2026
Platinum Services NYScaffold207/08/2026
Canido Basonas Construction ServiceGeneral Contractor104/09/2026
Dinam DevelopmentGeneral Contractor110/01/2026
Akala ConstructionScaffold109/09/2026
Ward PlumbingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AZ Professional Engineering766109/11/2026
Paradigm Architecture5931101/13/2025
Robert F. Germain Jr. PE5100402/09/2023
Building Lifecycle
All (120)Filed (10)Permit Issued (11)Signed Off (5)Facade (FISP) (12)Violation (60)Inspection (3)Special Inspection (19)
09/30/2026
Permit issued — General Construction
Q01454389-I1-GC
09/11/2026
Filed — Alteration
APPLICATION FIELD FOR REPLACEMENT OF EXISTING ROOFING MATERIALS ON EXISTING INSULATED BASE .NO CHANGE IN USE , EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q01454389-I1
09/08/2026
Filed — Alteration
Q01454889-I1
09/08/2026
Permit issued — Sidewalk Shed
Q01454889-I1-SH
09/01/2026
Special inspection requirement — Final
VIJAY KUMAR
09/01/2026
Special inspection requirement — Tenant Protection Plan Compliance
VIJAY KUMAR
09/01/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
VIJAY KUMAR
05/19/2026
Signed off — Alteration
Exterior restoration to include masonry repairs, sill & lintel replacement, gravel stop installation and parapet rebuilding as per plans filed herewith. No change to use, egress or occupancy.
Q01138220-I1
05/07/2026
Violation issued (HPD, open)
A
01/21/2026
Violation issued (HPD, open)
B
01/21/2026
Violation issued (HPD, open)
B
01/21/2026
Violation issued (HPD, open)
B
01/21/2026
Violation issued (HPD, open)
B
01/21/2026
Violation issued (HPD, closed)
C
01/21/2026
Violation issued (HPD, closed)
C
01/21/2026
Violation issued (HPD, closed)
C
01/21/2026
Violation issued (HPD, closed)
C
12/18/2025
Violation issued (HPD, closed)
C
12/18/2025
Violation issued (HPD, open)
B
12/18/2025
Violation issued (HPD, closed)
C
12/18/2025
Violation issued (HPD, open)
B
11/17/2025
Permit issued — Sidewalk Shed
Q01143035-I1-SH
11/13/2025
Signed off — Alteration
Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.
Q01141852-I1
06/12/2025
Violation issued (HPD, open)
A
02/27/2025
Permit issued — General Construction
Q01138220-I1-GC
02/23/2025
Violation issued (HPD, open)
A
02/18/2025
Permit issued — Suspended Scaffold
Q01141852-I1-SC
02/14/2025
Filed — Alteration
Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.
Q01141852-P1
01/13/2025
Filed — Alteration
Exterior restoration to include masonry repairs, sill & lintel replacement, gravel stop installation and parapet rebuilding as per plans filed herewith. No change to use, egress or occupancy.
Q01138220-I1
01/13/2025
Special inspection requirement — Energy Code Compliance Inspections
Anthony Addesso
12/06/2024
Special inspection requirement — Tenant Protection Plan Compliance
Anthony Addesso
12/06/2024
Special inspection requirement — Masonry
Anthony Addesso
12/06/2024
Special inspection requirement — Post-installed Anchors
Anthony Addesso
12/06/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Anthony Addesso
12/06/2024
Special inspection requirement — Air barrier - visual inspection
Anthony Addesso
12/03/2024
Permit issued — Suspended Scaffold
Q01141852-I1-SC
11/26/2024
Filed — Alteration
Q01143035-I1
11/26/2024
Permit issued — Sidewalk Shed
Q01143035-I1-SH
11/19/2024
Filed — Alteration
Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.
Q01141852-I1
11/06/2024
Special inspection requirement — Final
Anthony Addesso
09/04/2024
Violation issued (FDNY_NOV, closed)
04/16/2024
Violation issued (HPD, open)
A
03/30/2023
Violation issued (HPD, open)
A
02/28/2023
Signed off — Alteration
RECONNECT EXISTING GAS LINE. (2) NEW GAS TRAINS. BOILER/BURNER FILED UNDER SEPARATE APPLICATION ON DOB NOW. NO CHANGE IN MEANS OF EGRESS, USE GROUP OR OCCUPANCY.
Q00706000-I1
02/28/2023
Signed off — Alteration
REPLACEMENT (2) NEW COMBINATION GAS/OIL BURNERS ON (2) NEW LP BOILERS. REPLACEMENT (1) NEW 2800 GALLON OIL TANK IN 3HR CONCRETE BLOCK WRAP (OLD CODE) WITH NEW DIKE. PLUMBING (GAS) FILED ON SEPARATE APPLICATION ON DOB NOW. NO CHANGE IN MEANS OF EGRESS, USE
Q00706033-I1
02/28/2023
Signed off — Alteration
Q00705974-I1
02/14/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
02/10/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/09/2023
Filed — Alteration
RECONNECT EXISTING GAS LINE. (2) NEW GAS TRAINS. BOILER/BURNER FILED UNDER SEPARATE APPLICATION ON DOB NOW. NO CHANGE IN MEANS OF EGRESS, USE GROUP OR OCCUPANCY.
Q00706000-P1
02/06/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/11/2023
Violation issued (HPD, open)
C
08/15/2022
Cycle 9 facade report signed — SWARMP
07/05/2022
Permit issued — General Construction
Q00705974-I1-GC
05/26/2022
Permit issued — Boiler Equipment
Q00706033-I1-BE
05/19/2022
Permit issued — Plumbing
Q00706000-I1-PL
05/19/2022
Permit issued — General Construction
Q00705974-I1-GC
05/12/2022
Filed — Alteration
RECONNECT EXISTING GAS LINE. (2) NEW GAS TRAINS. BOILER/BURNER FILED UNDER SEPARATE APPLICATION ON DOB NOW. NO CHANGE IN MEANS OF EGRESS, USE GROUP OR OCCUPANCY.
Q00706000-I1
05/12/2022
Filed — Alteration
REPLACEMENT (2) NEW COMBINATION GAS/OIL BURNERS ON (2) NEW LP BOILERS. REPLACEMENT (1) NEW 2800 GALLON OIL TANK IN 3HR CONCRETE BLOCK WRAP (OLD CODE) WITH NEW DIKE. PLUMBING (GAS) FILED ON SEPARATE APPLICATION ON DOB NOW. NO CHANGE IN MEANS OF EGRESS, USE
Q00706033-I1
05/11/2022
Special inspection requirement — HVAC-R and service water heating equipment
Robert Germain Jr.
05/11/2022
Special inspection requirement — Maintenance information
Robert Germain Jr.
Latest 60 of 120 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedDinam Development09/30/2026
DOB NOWSidewalk ShedPermit IssuedAkala Construction09/08/2026
DOB NOWSidewalk ShedPermit IssuedPlatinum Services NY11/17/2025
DOB NOWGeneral ConstructionSigned-offCanido Basonas Construction Service02/27/2025
DOB NOWSuspended ScaffoldSigned-offCanido Basonas Construction02/18/2025
DOB NOWSuspended ScaffoldSigned-offCanido Basonas Construction12/03/2024
DOB NOWSidewalk ShedPermit IssuedPlatinum Services NY11/26/2024
DOB NOWGeneral ConstructionSigned-offAggressive Heating07/05/2022
DOB NOWBoiler EquipmentSigned-offAggressive Heating05/26/2022
DOB NOWPlumbingSigned-offWard Plumbing05/19/2022
DOB NOWGeneral ConstructionSigned-offAggressive Heating05/19/2022
BISOTISSUEDSato Construction Co04/05/2012
BISEQISSUEDEverest Scaffolding03/30/2012
BISEQISSUEDEverest Scaffolding03/30/2012
BISPLISSUEDGarofalo Master P&H03/16/2010
BISPLISSUEDGarofalo Master P&H06/16/2005
BISOTISSUEDGarofalo Master P & H06/16/2005
3 projects · most recent 09/02/2026
FiledStatusContractorScope
09/02/2026Permit IssuedRichard Neu—
11/27/2024Permit IssuedRichard Neu—
05/03/2022CompleteTriton Electric—
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
02/14/2023Pass-Final Boiler Equipment InspectionPassView ↗
02/10/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/06/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
09/01/2026FinalVIJAY KUMARprogress
09/01/2026Tenant Protection Plan ComplianceVIJAY KUMARspecial
09/01/2026Structural Stability – Alterations of existing buildingsVIJAY KUMARspecial
01/13/2025Energy Code Compliance InspectionsAnthony Addessoprogress
12/06/2024Tenant Protection Plan ComplianceAnthony Addessospecial
12/06/2024MasonryAnthony Addessospecial
12/06/2024Post-installed AnchorsAnthony Addessospecial
12/06/2024Structural Stability – Alterations of existing buildingsAnthony Addessospecial
12/06/2024Air barrier - visual inspectionAnthony Addessoenergy_progress
11/06/2024FinalAnthony Addessoprogress
05/11/2022HVAC-R and service water heating equipmentRobert Germain Jr.energy_progress
05/11/2022Maintenance informationRobert Germain Jr.energy_progress
05/11/2022HVAC-R and service water piping design and insulationRobert Germain Jr.energy_progress
05/11/2022HVAC-R and service water heating system controlsRobert Germain Jr.energy_progress
03/24/2022Fire-Resistant Penetrations and JointsRobert Germain Jr.special
03/24/2022Chimneys and ventsRobert Germain Jr.special
03/24/2022Fire-Resistant Penetrations and JointsRobert Germain Jr.special
03/24/2022FinalRobert Germain Jr.progress
03/24/2022Fuel-Oil Storage and Fuel-Oil Piping SystemsRobert Germain Jr.special
▾Documents — 80 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
10/13/2026Q01454889-I1Request digital key ↗
10/04/2026Q01454389-I1Request digital key ↗
08/26/2026Q00705974-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸Applications & Permits6
▸BISWORK PERMIT APPLICATION3
04/06/2012420483845Open ↗
04/02/2012420551110Open ↗
04/02/2012420551101Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION3
04/02/2012420551110Open ↗
04/02/2012420551101Open ↗
09/29/2011420483845Open ↗
▸Seals & Professional Certifications36
▸DOB NOWProgress Inspector Seal & Signature9
10/01/2026Q01454389-I1Open ↗
09/23/2026Q00706033-I1Open ↗
09/23/2026Q00706033-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
10/01/2026Q01454389-I1Open ↗
09/23/2026Q00706033-I1Open ↗
09/23/2026Q00706033-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
10/13/2026Q01454889-I1Open ↗
10/01/2026Q01454389-I1Open ↗
08/21/2026Q01143035-I1Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION6
04/03/2013420551101Open ↗
02/07/2013420551110Open ↗
09/05/2012420483845Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
04/02/2012420551110Open ↗
04/02/2012420551101Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
04/02/2012420551110Open ↗
04/02/2012420551101Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
10/01/2026Q01454389-I1Open ↗
08/21/2026Q01138220-I1Open ↗
08/13/2026Q00706000-I1Open ↗
Showing 3 of 6 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
04/02/2012420551101Open ↗
09/29/2011420483845Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY1
11/03/2011420483845Open ↗
▸BISEN2 - As Built Energy Analysis1
09/05/2012420483845Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026Q00706033-I1Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026Q00706033-I1Open ↗
▸Approvals, Objections & Sign-offs8
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
04/03/2013420551101Open ↗
02/07/2013420551110Open ↗
09/05/2012420483845Open ↗
▸BISADMINISTRATIVE OBJECTIONS3
04/02/2012420551110Open ↗
04/02/2012420551101Open ↗
09/29/2011420483845Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
04/03/2013420551101Open ↗
02/07/2013420551110Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
09/05/2012420483845Open ↗
09/29/2011420483845Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET2
04/02/2012420551110Open ↗
04/02/2012420551101Open ↗
▸Other Documents4
▸DOB NOWManufacturer's Specifications2
08/13/2026Q01141852-I1Open ↗
08/13/2026Q01141852-P1Open ↗
▸DOB NOWCalculations2
08/13/2026Q01141852-P1Open ↗
08/13/2026Q01141852-I1Open ↗