← Back
Two stories - detached, small or mid-size
89-66 212 STREET
QUEENS · BIN 4225714
💬 Discuss this project
1935Year Built
2.5Stories
A1Building Class
R2Zoning
1,770 sfGross Floor Area
1Units
1 Open Violation 0 unresolved · 1 paperwork only ▸FDNY Report ↗
Two stories - detached, small or mid-size · 3,840 sf lot · 0.46 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Permit Issued — active, not yet Signed-off
Floor 2Under Construction3p · 1 filing · 20 docs
Floor 1Under Construction2p · 1 filing · 20 docs
CellarUnder Construction4p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/20/2025$400K—— → —$226/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HANSA BUILDING ENGINEERING SERVICES401/20/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
YAFE MEOD CORPGeneral Contractor603/21/2026
W.R. PLBG AND HTG CORPPlumbing107/02/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ASKON ARCHITECT, P.C.3596301/20/2026
TRIANGLE INSPECTION & TES7495201/20/2026
Building Lifecycle
All (46)Filed (4)Permit Issued (3)Violation (2)Objection (10)Special Inspection (27)
01/23/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
01/23/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Akeeb Shekoni
01/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Akeeb Shekoni
01/23/2026
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Rajasekhar Sakhamuri
01/23/2026
Special inspection requirement — Energy Code Compliance Inspections
HANSA PERSAUD
01/23/2026
Special inspection requirement — HVAC-R and service water heating equipment
HANSA PERSAUD
01/23/2026
Special inspection requirement — HVAC-R and service water heating system controls
HANSA PERSAUD
01/23/2026
Special inspection requirement — Maintenance information
HANSA PERSAUD
01/23/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
HANSA PERSAUD
01/20/2026
Filed — Alteration
PROPOSED EXTENSION FRONT OF BUILDING LOCATED AT SECOND FLOOR. PROPOSED TWO-STORY REAR EXTENSION. INTERNAL RENOVATION THROUGHOUT EXSTING ONE FAMILY DWELLING.
Q01228394-P1
01/07/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Akeeb Shekoni
01/07/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Akeeb Shekoni
01/07/2026
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Rajasekhar Sakhamuri
01/07/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
01/07/2026
Special inspection requirement — Energy Code Compliance Inspections
HANSA PERSAUD
01/07/2026
Special inspection requirement — Maintenance information
HANSA PERSAUD
01/07/2026
Special inspection requirement — HVAC-R and service water heating equipment
HANSA PERSAUD
01/07/2026
Special inspection requirement — HVAC-R and service water heating system controls
HANSA PERSAUD
01/07/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
HANSA PERSAUD
11/21/2025
Permit issued — Plumbing
Q01228394-S2-PL
11/03/2025
Filed — Alteration
PROPOSED EXTENSION FRONT OF BUILDING LOCATED AT SECOND FLOOR. PROPOSED TWO-STORY REAR EXTENSION. INTERNAL RENOVATION THROUGHOUT EXSTING ONE FAMILY DWELLING.
Q01228394-S2
10/14/2025
Permit issued — Construction Fence
Q01228394-S1-FN
10/10/2025
Permit issued — Foundation
Q01228394-I1-GC-CX
10/01/2025
Filed — Alteration
PROPOSED EXTENSION FRONT OF BUILDING LOCATED AT SECOND FLOOR. PROPOSED TWO-STORY REAR EXTENSION. INTERNAL RENOVATION THROUGHOUT EXSTING ONE FAMILY DWELLING.
Q01228394-S1
09/04/2025
Objection resolved — Addressed
08/22/2025
Objection raised — Admin
08/12/2025
Objection resolved — Addressed
08/12/2025
Objection resolved — Addressed
07/04/2025
Objection resolved — Addressed
07/04/2025
Objection resolved — Addressed
06/20/2025
Objection raised — Zoning
06/20/2025
Objection raised — Energy
06/18/2025
Objection raised — Zoning
06/18/2025
Objection raised — Cost
06/04/2025
Filed — Alteration
PROPOSED EXTENSION FRONT OF BUILDING LOCATED AT SECOND FLOOR. PROPOSED TWO-STORY REAR EXTENSION. INTERNAL RENOVATION THROUGHOUT EXSTING ONE FAMILY DWELLING.
Q01228394-I1
05/19/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Akeeb Shekoni
05/19/2025
Special inspection requirement — Concrete - Cast-In-Place
Akeeb Shekoni
05/19/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Akeeb Shekoni
05/19/2025
Special inspection requirement — Subgrade Inspections
Akeeb Shekoni
05/19/2025
Special inspection requirement — Masonry
Akeeb Shekoni
05/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Akeeb Shekoni
05/19/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
05/19/2025
Special inspection requirement — Final
HANSA PERSAUD
05/19/2025
Special inspection requirement — Footing and Foundation
HANSA PERSAUD
02/06/1989
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/06/1989
Violation issued (ECB, open)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offW.R. PLBG AND HTG CORP11/21/2025
DOB NOWConstruction FencePermit IssuedYAFE MEOD CORP10/14/2025
DOB NOWFoundationPermit IssuedYAFE MEOD CORP10/10/2025
1 project · most recent 01/20/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
01/20/2026Signed-offW.R. PLBG AND HTG CORPGas, Storm, Water/Sanitary
1 project · most recent 09/24/2025
General Wiring
FiledStatusContractorScope
09/24/2025CompleteTRINCITY ELECTRIC, INCGeneral Wiring
1 project · most recent 01/20/2026
FiledStatusContractorScope
01/20/2026Signed-offW.R. PLBG AND HTG CORP1 scope_items
1 project · most recent 01/20/2026
Fence
FiledStatusContractorScope
01/20/2026Signed-offW.R. PLBG AND HTG CORPFence
▾Special Inspection Requirements (DOB NOW) — 27
DateRequirementInspectorRole
01/23/2026Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
01/23/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationAkeeb Shekonispecial
01/23/2026Fire-Resistant Penetrations and JointsAkeeb Shekonispecial
01/23/2026Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesRajasekhar Sakhamurispecial
01/23/2026Energy Code Compliance InspectionsHANSA PERSAUDprogress
01/23/2026HVAC-R and service water heating equipmentHANSA PERSAUDenergy_progress
01/23/2026HVAC-R and service water heating system controlsHANSA PERSAUDenergy_progress
01/23/2026Maintenance informationHANSA PERSAUDenergy_progress
01/23/2026HVAC-R and service water piping design and insulationHANSA PERSAUDenergy_progress
01/07/2026Fire-Resistant Penetrations and JointsAkeeb Shekonispecial
01/07/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationAkeeb Shekonispecial
01/07/2026Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesRajasekhar Sakhamurispecial
01/07/2026Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
01/07/2026Energy Code Compliance InspectionsHANSA PERSAUDprogress
01/07/2026Maintenance informationHANSA PERSAUDenergy_progress
01/07/2026HVAC-R and service water heating equipmentHANSA PERSAUDenergy_progress
01/07/2026HVAC-R and service water heating system controlsHANSA PERSAUDenergy_progress
01/07/2026HVAC-R and service water piping design and insulationHANSA PERSAUDenergy_progress
05/19/2025Structural Stability – Alterations of existing buildingsAkeeb Shekonispecial
05/19/2025Concrete - Cast-In-PlaceAkeeb Shekonispecial
05/19/2025Excavations - Sheeting, Shoring, and BracingAkeeb Shekonispecial
05/19/2025Subgrade InspectionsAkeeb Shekonispecial
05/19/2025MasonryAkeeb Shekonispecial
05/19/2025Fire-Resistant Penetrations and JointsAkeeb Shekonispecial
05/19/2025Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
Latest 25 of 27.
▾Documents — 33 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/17/2026Q01228394-P1Request digital key ↗
08/17/2026Q01228394-S2Request digital key ↗
08/17/2026Q01228394-S1Request digital key ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026Q01228394-I1Open ↗
▸Seals & Professional Certifications17
▸DOB NOWSpecial Inspector Seal & Signature8
08/31/2026Q01228394-P1Open ↗
08/31/2026Q01228394-P1Open ↗
08/31/2026Q01228394-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
08/31/2026Q01228394-P1Open ↗
08/31/2026Q01228394-P1Open ↗
08/29/2026Q01228394-S2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/17/2026Q01228394-S2Open ↗
08/13/2026Q01228394-P1Open ↗
08/13/2026Q01228394-I1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/17/2026Q01228394-S2Open ↗
08/13/2026Q01228394-P1Open ↗
08/13/2026Q01228394-I1Open ↗
▸Inspections & Test Reports5
▸DOB NOWSOIL REPORT3
08/17/2026Q01228394-S2Open ↗
08/13/2026Q01228394-P1Open ↗
08/13/2026Q01228394-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026Q01228394-S2Open ↗
08/13/2026Q01228394-I1Open ↗
▸Other Documents3
▸DOB NOWSite Survey: Initial1
08/13/2026Q01228394-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026Q01228394-I1Open ↗
▸DOB NOWPlot Diagram1
08/13/2026Q01228394-I1Open ↗