← Back
Two stories - detached, small or mid-size
89-84 VANDERVEER STREET
QUEENS · BIN 4227820
💬 Discuss this project
1930Year Built
2Stories
A1Building Class
R2Zoning
1,332 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 2,604 sf lot · 0.51 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalLandscape
Floor 21p · 1 filing · 20 docs
Floor 1
Cellar3p · 2 filings · 20 docs
Basement1p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/12/2022$790K—JMC REAL ESTATE DEVELPERS CORP. → Private party$593/sf building
08/10/2021$505K—— → —$379/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ASHOK ARCHITECTURE DESIGN, PL/512/05/2021
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AUTOMOTIVE FACILITY SVCSGeneral Contractor207/08/2026
ARCO PLBG AND HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ASHOK ARCHITECTURE DESIGN6027512/05/2021
Building Lifecycle
All (51)Filed (5)Permit Issued (3)Signed Off (2)Violation (2)Inspection (5)Objection (4)Special Inspection (30)
08/12/2022
Signed off — Alteration
Installation of Split-system for Heating, Cooling and Ventilation with associated Ductwork and Blower Units.
Q00594841-S1
08/05/2022
Permit issued — Mechanical Systems
Q00594841-S1-MS
12/23/2021
Signed off — Alteration
Installation of Split-system for Heating, Cooling and Ventilation with associated Ductwork and Blower Units.
Q00594841-I1
12/14/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/09/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ashish Patel
12/09/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
Ashish Patel
12/09/2021
Special inspection requirement — Maintenance information
Ashish Patel
12/09/2021
Special inspection requirement — HVAC-R and service water heating equipment
Ashish Patel
12/09/2021
Special inspection requirement — HVAC-R and service water heating system controls
Ashish Patel
12/09/2021
Special inspection requirement — Energy Code Compliance Inspections
Ashish Patel
12/08/2021
Objection resolved — Addressed
12/07/2021
Objection raised — Scope
12/05/2021
Filed — Alteration
Interior Partition Layout Changes including Relocation of Half Bath on First Floor with New Roughing. Installation of Dishwasher in the Kitchen.
Q00596390-P2
12/05/2021
Special inspection requirement — Maintenance information
Ashish Patel
12/05/2021
Special inspection requirement — HVAC-R and service water heating system controls
Ashish Patel
12/05/2021
Special inspection requirement — Energy Code Compliance Inspections
Ashish Patel
12/05/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
Ashish Patel
12/05/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ashish Patel
12/05/2021
Special inspection requirement — HVAC-R and service water heating equipment
Ashish Patel
11/15/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/09/2021
Filed — Alteration
Interior Partition Layout Changes including Relocation of Half Bath on First Floor with New Roughing. Installation of Dishwasher in the Kitchen.
Q00596390-P1
11/09/2021
Special inspection requirement — Maintenance information
Ashish Patel
11/03/2021
Special inspection requirement — HVAC-R and service water heating system controls
Ashish Patel
11/03/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ashish Patel
11/03/2021
Special inspection requirement — Energy Code Compliance Inspections
Ashish Patel
11/03/2021
Special inspection requirement — HVAC-R and service water heating equipment
Ashish Patel
11/03/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
Ashish Patel
10/31/2021
Filed — Alteration
Installation of Split-system for Heating, Cooling and Ventilation with associated Ductwork and Blower Units.
Q00594841-S1
10/31/2021
Special inspection requirement — HVAC-R and service water heating system controls
Ashish Patel
10/31/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ashish Patel
10/31/2021
Special inspection requirement — Heating Systems
Ashish Patel
10/31/2021
Special inspection requirement — Energy Code Compliance Inspections
Ashish Patel
10/31/2021
Special inspection requirement — Fire-Resistance Rated Construction
Ashish Patel
10/31/2021
Special inspection requirement — Duct leakage testing, insulation and design
Ashish Patel
10/31/2021
Special inspection requirement — Shutoff dampers
Ashish Patel
10/31/2021
Special inspection requirement — Ventilation and air distribution system
Ashish Patel
10/31/2021
Special inspection requirement — HVAC-R and service water heating equipment
Ashish Patel
10/31/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
Ashish Patel
10/27/2021
Special inspection requirement — Final
Ashish Patel
10/27/2021
Special inspection requirement — Mechanical Systems
Ashish Patel
10/25/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/15/2021
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/15/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/07/2021
Permit issued — Plumbing
Q00596390-I1-PL
09/24/2021
Permit issued — General Construction
Q00594841-I1-GC
09/23/2021
Objection raised — Scope
09/23/2021
Objection resolved — Addressed
09/19/2021
Filed — Alteration
Installation of Split-system for Heating, Cooling and Ventilation with associated Ductwork and Blower Units.
Q00594841-I1
09/19/2021
Filed — Alteration
Interior Partition Layout Changes including Relocation of Half Bath on First Floor with New Roughing. Installation of Dishwasher in the Kitchen.
Q00596390-I1
09/28/2007
Violation issued (ECB, closed)
Quality of Life
09/28/2007
Violation issued (ECB, closed)
Quality of Life
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offAUTOMOTIVE FACILITY SVCS08/05/2022
DOB NOWPlumbingSigned-offARCO PLBG AND HTG INC10/07/2021
DOB NOWGeneral ConstructionSigned-offAUTOMOTIVE FACILITY SVCS09/24/2021
1 project · most recent 12/05/2021
Gas Water/Sanitary
FiledStatusContractorScope
12/05/2021Signed-offARCO PLBG AND HTG INCGas, Water/Sanitary
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
12/14/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/15/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/25/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/15/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/15/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 42
DateRequirementInspectorRole
12/09/2021Fire-Resistant Penetrations and JointsAshish Patelspecial
12/09/2021HVAC-R and service water piping design and insulationAshish Patelenergy_progress
12/09/2021Maintenance informationAshish Patelenergy_progress
12/09/2021HVAC-R and service water heating equipmentAshish Patelenergy_progress
12/09/2021HVAC-R and service water heating system controlsAshish Patelenergy_progress
12/09/2021Energy Code Compliance InspectionsAshish Patelprogress
12/05/2021Maintenance informationAshish Patelenergy_progress
12/05/2021HVAC-R and service water heating system controlsAshish Patelenergy_progress
12/05/2021Energy Code Compliance InspectionsAshish Patelprogress
12/05/2021HVAC-R and service water piping design and insulationAshish Patelenergy_progress
12/05/2021Fire-Resistant Penetrations and JointsAshish Patelspecial
12/05/2021HVAC-R and service water heating equipmentAshish Patelenergy_progress
11/09/2021Maintenance informationAshish Patelenergy_progress
11/03/2021HVAC-R and service water heating system controlsAshish Patelenergy_progress
11/03/2021Fire-Resistant Penetrations and JointsAshish Patelspecial
11/03/2021Energy Code Compliance InspectionsAshish Patelprogress
11/03/2021HVAC-R and service water heating equipmentAshish Patelenergy_progress
11/03/2021HVAC-R and service water piping design and insulationAshish Patelenergy_progress
10/31/2021HVAC-R and service water heating system controlsAshish Patelenergy_progress
10/31/2021Fire-Resistant Penetrations and JointsAshish Patelspecial
10/31/2021Heating SystemsAshish Patelspecial
10/31/2021Energy Code Compliance InspectionsAshish Patelprogress
10/31/2021Fire-Resistance Rated ConstructionAshish Patelprogress
10/31/2021Duct leakage testing, insulation and designAshish Patelenergy_progress
10/31/2021Shutoff dampersAshish Patelenergy_progress
Latest 25 of 42.
▾Documents — 59 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/27/2026Q00594841-I1Request digital key ↗
08/27/2026Q00594841-S1Request digital key ↗
08/26/2026Q00596390-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications47
▸DOB NOWProgress Inspector Seal & Signature35
09/05/2026Q00594841-S1Open ↗
09/05/2026Q00594841-S1Open ↗
09/05/2026Q00594841-S1Open ↗
Showing 3 of 35 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/05/2026Q00594841-S1Open ↗
09/05/2026Q00594841-S1Open ↗
09/05/2026Q00594841-S1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/27/2026Q00594841-I1Open ↗
08/27/2026Q00594841-S1Open ↗
08/26/2026Q00596390-P1Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/27/2026Q00594841-S1Open ↗
08/27/2026Q00594841-I1Open ↗
08/26/2026Q00596390-P1Open ↗
Showing 3 of 5 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026Q00594841-I1Open ↗
08/13/2026Q00594841-S1Open ↗