← Back
One family attached or semi-detached
89 ASPEN KNOLLS WAY
STATEN ISLAND · Arden Heights-Rossville · BIN 5120777
💬 Discuss this project
2001Year Built
3Stories
A5Building Class
R3-2Zoning
—Gross Floor Area
1Units
One family attached or semi-detached · 2.71 FAR built · Flood zone X
Locations of Work
Electrical
Roof4p · 1 filing · 7 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC107/15/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor107/25/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272107/15/2026
Building Lifecycle
All (8)Filed (1)Permit Issued (1)Signed Off (1)Special Inspection (5)
08/24/2026
Signed off — Alteration
S01431490-I1
07/23/2026
Permit issued — Solar
S01431490-I1-SL
07/15/2026
Filed — Alteration
S01431490-I1
07/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
07/15/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
07/15/2026
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
07/15/2026
Special inspection requirement — Final
Walid Abdulla
07/15/2026
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC07/23/2026
BIS—ISSUEDASPEN KNOLLS CORP01/31/2001
BISPLISSUEDTUFARO PLBG & HTG08/02/2000
BIS—ISSUEDASPEN KNOLLS CORP06/05/2000
1 project · most recent 07/15/2026
FiledStatusContractorScope
07/15/2026CompleteSUNRUN SOLAR ELECTL CORP—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
07/15/2026Fire-Resistant Penetrations and JointsWalid Abdullaspecial
07/15/2026Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
07/15/2026Energy Code Compliance InspectionsWalid Abdullaprogress
07/15/2026FinalWalid Abdullaprogress
07/15/2026Air barrier - visual inspectionWalid Abdullaenergy_progress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/16/2026S01431490-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
08/27/2026S01431490-I1Open ↗
08/27/2026S01431490-I1Open ↗
08/27/2026S01431490-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/27/2026S01431490-I1Open ↗
08/27/2026S01431490-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/16/2026S01431490-I1Open ↗