← Back
One family attached or semi-detached
89 DAVIS AVENUE
STATEN ISLAND · West New Brighton-Silver Lake-Grymes Hill · BIN 5003524
💬 Discuss this project
1925Year Built
2Stories
A5Building Class
R3XZoning
1,576 sfGross Floor Area
1Units
One family attached or semi-detached · 2,808 sf lot · 0.56 FAR built · Flood zone X500
Locations of Work
Electrical
Roof1 filing · 8 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TRINITY SOLAR LLC106/25/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ACA ASSOCIATES103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TRINITY SOLAR LLCGeneral Contractor106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
IKRA CONSULTING LLC7032106/25/2025
Building Lifecycle
All (7)Filed (1)Permit Issued (1)Special Inspection (5)
06/30/2025
Permit issued — Solar
S01245792-I1-SL
06/25/2025
Filed — Alteration
Installation of solar system on the roof as per plan. No change in use, egress or occupancy
S01245792-I1
06/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MD MOSTAFA
06/24/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
MD MOSTAFA
06/24/2025
Special inspection requirement — Energy Code Compliance Inspections
Ayracon Almaraz
06/24/2025
Special inspection requirement — Final
Ayracon Almaraz
06/24/2025
Special inspection requirement — Air barrier - visual inspection
Ayracon Almaraz
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedTRINITY SOLAR LLC06/30/2025
1 project · most recent 06/18/2025
FiledStatusContractorScope
06/18/2025CancelledREDLINE ELECTRIC INC—
1 project · most recent 06/25/2025
FiledStatusContractorScope
06/25/2025Permit IssuedTRINITY SOLAR LLC20 panels, 8.2 kw, 817 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
06/24/2025Fire-Resistant Penetrations and JointsMD MOSTAFAspecial
06/24/2025Structural Stability – Alterations of existing buildingsMD MOSTAFAspecial
06/24/2025Energy Code Compliance InspectionsAyracon Almarazprogress
06/24/2025FinalAyracon Almarazprogress
06/24/2025Air barrier - visual inspectionAyracon Almarazenergy_progress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/19/2026S01245792-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
08/24/2026S01245792-I1Open ↗
08/24/2026S01245792-I1Open ↗
08/24/2026S01245792-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/24/2026S01245792-I1Open ↗
08/24/2026S01245792-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026S01245792-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026S01245792-I1Open ↗