| Owner | Filings | Most Recent |
|---|---|---|
| RXR LIU PII DEVELOPER TRS LLC | 208 | 09/20/2026 |
| VIK XS SERVICES | 4 | 04/09/2026 |
| LRC CONSTRUCTION | 11 | 03/22/2026 |
| STATE CONTRACTING CORP NY | 3 | 03/22/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| AKF ENGINEERS, LLP | 13 | 06/04/2026 |
| DESIMONE CONSULTING ENGINEERS | 9 | 05/21/2026 |
| CARISIMA KOENIG | 1 | 05/19/2026 |
| PERKINS EASTMAN | 4 | 03/24/2026 |
| PATUXENT ENGINEERING LLC | 8 | 06/26/2025 |
| LOMBARDO PROFESSIONAL ENGINEERING | 4 | 06/13/2025 |
| BRONZINO ENGINEERING, P.C. | 1 | 11/26/2024 |
| DSENY ENGINEERING SERVICES, PC | 1 | 11/11/2024 |
| LANGAN ENG, ENV, SURVEY, LARCH, DPC | 5 | 09/10/2024 |
| OSPINO ENGINEERING PLLC | 1 | 09/10/2024 |
| GGA STUDIOS, DPC | 1 | 06/13/2024 |
| HIGHBURY CONCRETE | 3 | 04/04/2024 |
| MJ ENGINEERING & DESIGN | 2 | 03/12/2024 |
| RAEL AUTOMATIC SPRINKLER CO., INC. | 1 | 02/01/2024 |
| AKRF, INC. | 1 | 07/26/2023 |
| S.M. BERGER ARCHITECTURE PC | 1 | 03/25/2022 |
| H & O ENGINEERING, DPC | 2 | 03/22/2022 |
| Representative | Filings | Most Recent |
|---|---|---|
| JAM CONSULTANTS, INC. | 54 | 03/21/2026 |
| A1 EXPEDITING SERVICE CORP. | 2 | 03/21/2026 |
| PATUXENT ENGINEERING | 16 | 03/21/2026 |
| RIGGING CONSULTANTS | 4 | 03/21/2026 |
| LOMBARDO BUILDING CONSULTANTS | 4 | 03/21/2026 |
| 4444 PPPP CORP | 4 | 03/21/2026 |
| JMG CONSULTANTS | 2 | 03/21/2026 |
| AO CONSULTING AND DRAFTING | 2 | 03/21/2026 |
| DSENY ENGINEERING SERVICES | 2 | 03/21/2026 |
| DOMANI CONSULTING | 1 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| TT MECHANICAL CORP | Plumbing | 49 | 07/08/2026 |
| LRC CONSTRUCTION LLC | General Contractor | 44 | 07/08/2026 |
| RAEL AUTOMATIC SPR | Plumbing | 36 | 03/22/2026 |
| SUFFOLK CONSTRUCTION COMP | General Contractor | 14 | 07/08/2026 |
| ARSENAL SCAFFOLD INC | General Contractor | 13 | 07/08/2026 |
| HIGHBURY CONCRETE, INC | General Contractor | 12 | 07/08/2026 |
| RAEL AUTOMATIC SPR.CO INC | Fire Protection | 6 | 07/08/2026 |
| HUNTER ROBERTS CONSTRUCTION | General Contractor | 5 | 07/08/2026 |
| LRC MAINTANENCE LLC | General Contractor | 5 | 07/08/2026 |
| KING INSTALLATION CORP | General Contractor | 3 | 09/09/2026 |
| ALMAR PLUMBING & HTG CORP | Plumbing | 3 | 07/08/2026 |
| G.N.T. MECHANICAL LLC | Fire Protection | 2 | 07/08/2026 |
| TOUFIC FALLAH | Electrical | 2 | 03/21/2026 |
| WITH PRIDE AIR CONDITIONING | General Contractor | 1 | 07/08/2026 |
| ADAM'S EUROPEAN CONTRACTING | General Contractor | 1 | 04/09/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| PROJECT TACTICAL SOLUTION | 5859 | 4 | 06/04/2026 |
| ATLAS ATC ENGINEERING INC | 8011 | 19 | 04/10/2026 |
| PCS ENGINEERING | 3745 | 2 | 09/08/2025 |
| DESIMONE CONSULTING ENGIN | 5942 | 8 | 06/25/2025 |
| LOMBARDO PROF ENGINEERING | 8566 | 4 | 06/13/2025 |
| LANGAN ENG, ENV, SURVEYIN | 1265 | 5 | 09/10/2024 |
| MJ ENGINEERING & DESIGN | 5546 | 2 | 03/12/2024 |
| ATLANTIC ENGINEERINGLABOR | 1381 | 3 | 05/19/2022 |
| H & O ENGINEERING, DPC | 5595 | 2 | 03/22/2022 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Suspended Scaffold | Signed-off | KING INSTALLATION CORP | 09/08/2026 |
| DOB NOW | General Construction | Permit Issued | LRC CONSTRUCTION LLC | 04/09/2026 |
| DOB NOW | Support of Excavation | Signed-off | LRC CONSTRUCTION LLC | 03/02/2026 |
| DOB NOW | Suspended Scaffold | Signed-off | KING INSTALLATION | 01/13/2026 |
| DOB NOW | Standpipe | Signed-off | RAEL AUTOMATIC SPR.CO INC | 12/02/2025 |
| DOB NOW | Standpipe | Signed-off | RAEL AUTOMATIC SPR.CO INC | 12/02/2025 |
| DOB NOW | Mechanical Systems | Signed-off | LRC CONSTRUCTION LLC | 10/15/2025 |
| DOB NOW | Curb Cut | Signed-off | LRC CONSTRUCTION LLC | 09/05/2025 |
| DOB NOW | Structural | Permit Issued | LRC CONSTRUCTION LLC | 07/10/2025 |
| DOB NOW | Structural | Permit Issued | LRC CONSTRUCTION LLC | 04/16/2025 |
| DOB NOW | General Construction | Permit Issued | LRC CONSTRUCTION LLC | 04/03/2025 |
| DOB NOW | Suspended Scaffold | Signed-off | POLTECH WALL SURFACING IN | 02/19/2025 |
| DOB NOW | Plumbing | Signed-off | TT MECHANICAL CORP | 02/12/2025 |
| DOB NOW | Construction Fence | Signed-off | ARSENAL SCAFFOLD INC | 02/10/2025 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | ARSENAL SCAFFOLD INC | 02/10/2025 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | ARSENAL SCAFFOLD INC | 02/10/2025 |
| DOB NOW | Sidewalk Shed | Signed-off | ARSENAL SCAFFOLD INC | 02/10/2025 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | ARSENAL SCAFFOLD INC | 02/10/2025 |
| DOB NOW | Supported Scaffold | Signed-off | ARSENAL SCAFFOLD INC | 02/10/2025 |
| DOB NOW | Standpipe | Signed-off | RAEL AUTOMATIC SPR.CO INC | 02/06/2025 |
| DOB NOW | Suspended Scaffold | Signed-off | KING INSTALLATION | 02/05/2025 |
| DOB NOW | General Construction | Permit Issued | LRC CONSTRUCTION LLC | 02/05/2025 |
| DOB NOW | Construction Fence | Signed-off | LRC CONSTRUCTION LLC | 01/16/2025 |
| DOB NOW | Sprinklers | Signed-off | RAEL AUTOMATIC SPR.CO INC | 11/13/2024 |
| DOB NOW | Standpipe | Signed-off | RAEL AUTOMATIC SPR.CO INC | 11/13/2024 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | ADAM'S EUROPEAN CONTRACTING | 11/12/2024 |
| DOB NOW | Suspended Scaffold | Permit Issued | VIK XS SERVICES INC | 09/10/2024 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | HIGHBURY CONCRETE, INC | 07/25/2024 |
| DOB NOW | Supported Scaffold | Signed-off | HIGHBURY CONCRETE, INC | 07/25/2024 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | HIGHBURY CONCRETE, INC | 07/25/2024 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | HIGHBURY CONCRETE, INC | 07/24/2024 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | HIGHBURY CONCRETE, INC | 07/24/2024 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | WITH PRIDE AIR CONDITIONI | 06/14/2024 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | HIGHBURY CONCRETE, INC | 05/20/2024 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | HIGHBURY CONCRETE, INC | 04/05/2024 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | HIGHBURY CONCRETE, INC | 04/03/2024 |
| DOB NOW | Structural | Permit Issued | LRC CONSTRUCTION LLC | 03/29/2024 |
| DOB NOW | Foundation | Signed-off | LRC CONSTRUCTION LLC | 03/27/2024 |
| DOB NOW | Plumbing | Signed-off | ALMAR PLUMBING & HTG CORP | 03/14/2024 |
| DOB NOW | Supported Scaffold | Signed-off | HIGHBURY CONCRETE, INC | 03/13/2024 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 06/04/2026 | — | — | Heating and Air Conditioning Systems, Ventilation Systems | Heat / Cool Daikin REYQ96XBTJA 87,035 BTU · Vrf Outdoor ×4 RXTQ36TAVJ9 32,912 BTU · Vrf Outdoor ×3 REYQ120AATJB 97,462 BTU · Vrf Outdoor ×2 REYQ144AATJB 124,778 BTU · Vrf Outdoor ×2 REYQ144XBTJA 115,201 BTU · Vrf Outdoor ×2 REYQ72AATJB, REYQ72XBTJA 73,823 BTU · Vrf Outdoor ×2 REYQ120XBTJA 92,041 BTU · Vrf Outdoor ×1 REYQ168AATJB 126,288 BTU · Vrf Outdoor ×1 REYQ168XBTJA 125,522 BTU · Vrf Outdoor ×1 Ventilation Daikin REYQ120XBTJA 106,750 BTU · Vrf Outdoor ×2 |
| 04/10/2026 | Permit Issued | LRC CONSTRUCTION LLC | Air Conditioning Systems, Associated Ducts and Piping, Heating and Air Conditioning Systems, Ventilation Systems | Cooling Aaon RN-006 69,300 BTU · Rooftop Unit ×2 Heat / Cool Daikin REYQ192AAYDA 344,000 BTU · Vrf Outdoor ×4 REYQ144XBYDA 276,000 BTU · Vrf Outdoor ×2 REYQ168XBYDA 156 BTU · Vrf Outdoor ×2 REYQ216AAYDA 206,000 BTU · Vrf Outdoor ×2 REYQ288XBYDA 276,000 BTU · Vrf Outdoor ×2 RXLQ240TAYDAX2 256,000 BTU · Vrf Outdoor ×1 RXYQ72AATJA 69,000 BTU · Vrf Outdoor ×2 Ventilation Greenheck SP-900 610 CFM · Exhaust Fan ×18 AX-113-533-0818-A500 40,000 CFM · Exhaust Fan ×4 AX-113-553-0809-A300 24,000 tons · Exhaust Fan ×4 BSQ-130HP 890 CFM · Exhaust Fan ×4 BSQ-140HP 400 CFM · Exhaust Fan ×2 BSQ-160HP 2,400 CFM · Exhaust Fan ×2 QEI-15 3,390 CFM · Exhaust Fan ×2 QEI-18 5,580 CFM · Exhaust Fan ×2 QEI-20 9,325 CFM · Exhaust Fan ×2 SQ-16-VG 4,000 CFM · Exhaust Fan ×2 SQ-99-VG 650 CFM · Exhaust Fan ×2 USF-13 1,820 CFM · Exhaust Fan ×2 Lf Systems DEF015 700 CFM · Exhaust Fan ×2 Ducts & Piping __Junk__ Associated ducts and piping 1 BTU · Ductwork ×2 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/04/2026 | — | — | Sprinkler System |
| 04/10/2026 | Signed-off | RAEL AUTOMATIC SPR.CO INC | Sprinkler System |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/04/2026 | — | — | Water/Sanitary |
| 04/10/2026 | Signed-off | TT MECHANICAL CORP | Gas, Storm, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/13/2026 | Complete | TF ELECTRICAL CORP | General Wiring |
| 07/29/2026 | Permit Issued | S. J. ELECTRIC INC. | General Wiring |
| 08/20/2024 | Complete | TF ELECTRICAL CORP | General Wiring |
| 05/15/2024 | Complete | S. J. ELECTRIC INC. | — |
| 03/28/2024 | Complete | S. J. ELECTRIC INC. | — |
| 03/27/2024 | Complete | S. J. ELECTRIC INC. | — |
| 03/27/2024 | Complete | S. J. ELECTRIC INC. | — |
| 02/08/2024 | Complete | SOLAS ELECTRICAL CORP | — |
| 02/08/2024 | Complete | SOLAS ELECTRICAL CORP | — |
| 11/21/2023 | Complete | S. J. ELECTRIC INC. | 1 meters, 1 new_meters |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/04/2026 | — | — | Steel, Concrete, Masonry |
| 04/10/2026 | Permit Issued | LRC CONSTRUCTION LLC | Concrete |
| 06/25/2025 | Permit Issued | LRC CONSTRUCTION LLC | Concrete |
| 05/19/2022 | Permit Issued | LRC CONSTRUCTION LLC | 2 scope_items |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/10/2024 | Permit Issued | VIK XS SERVICES INC | Scaffold |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/13/2025 | Signed-off | KING INSTALLATION CORP | Suspended Scaffold (SC) |
| 09/10/2024 | Permit Issued | VIK XS SERVICES INC | Suspended Scaffold (SC) |
| Date | Type | Result | Report |
|---|---|---|---|
| 08/12/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 05/07/2026 | Pass-Final General Construction Non-Directive 14 | Pass | View ↗ |
| 02/05/2026 | Pass-Final Curb Cut Non-Directive 14 | Pass | View ↗ |
| 01/26/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 01/26/2026 | Certified Sprinkler - SP - Roughing | Certified | View ↗ |
| 12/10/2025 | Fail-Final Curb Cut Non-Directive 14 | Fail | View ↗ |
| 10/31/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 10/01/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 09/11/2025 | Certified StandPipe-SD-Piping-Hydrostatic Test | Certified | View ↗ |
| 09/10/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 09/08/2025 | Pass-Final SD - Up to 3 Requested Floors | Pass | View ↗ |
| 07/29/2025 | Pass-Final SD - Fire Pump | Pass | View ↗ |
| 07/28/2025 | Pass-Final SD - Fire Pump | Pass | View ↗ |
| 07/22/2025 | Certified StandPipe-SD-Piping-Hydrostatic Test | Certified | View ↗ |
| 05/16/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 02/20/2025 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 02/20/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 02/05/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 01/15/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 12/12/2024 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 11/25/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 11/18/2024 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 07/16/2024 | Pass-Final Curb Cut Non-Directive 14 | Pass | View ↗ |
| 02/23/2024 | Pass-Final PL - Underground | Pass | View ↗ |
| 02/02/2024 | Certified Storm Drainage-ST-Piping-Underground | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 08/06/2026 | Structural Stability – Alterations of existing buildings | — | special |
| 06/03/2026 | HVAC-R and service water heating system controls | Max Lee | energy_progress |
| 06/03/2026 | HVAC-R and service water heating equipment | Max Lee | energy_progress |
| 06/03/2026 | Duct leakage testing, insulation and design | Max Lee | energy_progress |
| 06/03/2026 | Ventilation and air distribution system | Max Lee | energy_progress |
| 06/03/2026 | HVAC-R and service water piping design and insulation | Max Lee | energy_progress |
| 04/27/2026 | Tenant Protection Plan Compliance | Max Lee | special |
| 03/31/2026 | Mechanical Systems | Max Lee | special |
| 03/31/2026 | Final | — | progress |
| 03/31/2026 | Tenant Protection Plan Compliance | — | special |
| 03/31/2026 | Structural Steel - Welding | — | special |
| 03/31/2026 | Structural Steel - High Strength Bolting | — | special |
| 03/31/2026 | Structural Steel - Details | — | special |
| 03/31/2026 | Structural Cold-Formed Steel | — | special |
| 03/31/2026 | Final | Max Lee | progress |
| 03/31/2026 | Post-installed Anchors | — | special |
| 03/31/2026 | Masonry | — | special |
| 03/31/2026 | Concrete - Cast-In-Place | — | special |
| 03/01/2026 | Lighting controls | RONALD GRAPIN | energy_progress |
| 03/01/2026 | Interior lighting power | RONALD GRAPIN | energy_progress |
| 03/01/2026 | Duct leakage testing, insulation and design | RONALD GRAPIN | energy_progress |
| 03/01/2026 | Exterior lighting power | RONALD GRAPIN | energy_progress |
| 03/01/2026 | Metering | RONALD GRAPIN | energy_progress |
| 03/01/2026 | Electrical motors and elevators | RONALD GRAPIN | energy_progress |
| 03/01/2026 | Lighting in dwelling units | RONALD GRAPIN | energy_progress |