89 ERASTINA PLACE
STATEN ISLAND · Mariner's Harbor-Arlington-Graniteville · BIN 5027385
💬 Discuss this project
1915Year Built
2.5Stories
A1Building Class
R3AZoning
1,592 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 6,417 sf lot · 0.25 FAR built · Flood zone X
Locations of Work
ElectricalGeneral
Roof5p · 2 filings · 20 docs
Basement1p · 1 filing · 17 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MOMENTUM SOLAR106/11/2025
PARKER AND WEST ENGINEERING, PLLC205/20/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MXV SIA LLC9281106/11/2025
PARKER AND WEST ENGINEERI5272205/20/2024
Building Lifecycle
All (21)Filed (3)Permit Issued (2)Signed Off (1)Special Inspection (15)
06/16/2025
Permit issued — Solar
S01239739-I1-SL
06/11/2025
Filed — Alteration
Installation of solar panels, rooftop, railed, grid-tied, 3 modules, 1.29 KW
S01239739-I1
06/11/2025
Special inspection requirement — Air barrier - visual inspection
Mina Makar
06/11/2025
Special inspection requirement — Final
Mina Makar
06/11/2025
Special inspection requirement — Energy Code Compliance Inspections
Mina Makar
06/11/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Mina Makar
06/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mina Makar
07/23/2024
Signed off — Alteration
S00963089-I1
05/21/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
05/21/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
05/21/2024
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
05/21/2024
Special inspection requirement — Final
Walid Abdulla
05/21/2024
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
05/20/2024
Filed — Alteration
S00963089-P1
05/10/2024
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
05/10/2024
Special inspection requirement — Final
Walid Abdulla
05/10/2024
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
05/10/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
05/10/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
04/08/2024
Permit issued — Solar
S00963089-I1-SL
04/02/2024
Filed — Alteration
S00963089-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedMOMENTUM SOLAR06/16/2025
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC04/08/2024
2 projects · most recent 06/11/2025
General Wiring
FiledStatusContractorScope
06/11/2025CompleteISLAND ELECTRIC CORP—
04/12/2024CompleteSUNRUN SOLAR ELECTL CORPGeneral Wiring
1 project · most recent 06/11/2025
FiledStatusContractorScope
06/11/2025Permit IssuedMOMENTUM SOLAR3 panels, 1.29 kw, 53 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
06/11/2025Air barrier - visual inspectionMina Makarenergy_progress
06/11/2025FinalMina Makarprogress
06/11/2025Energy Code Compliance InspectionsMina Makarprogress
06/11/2025Structural Stability – Alterations of existing buildingsMina Makarspecial
06/11/2025Fire-Resistant Penetrations and JointsMina Makarspecial
05/21/2024Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
05/21/2024Fire-Resistant Penetrations and JointsWalid Abdullaspecial
05/21/2024Energy Code Compliance InspectionsWalid Abdullaprogress
05/21/2024FinalWalid Abdullaprogress
05/21/2024Air barrier - visual inspectionWalid Abdullaenergy_progress
05/10/2024Air barrier - visual inspectionWalid Abdullaenergy_progress
05/10/2024FinalWalid Abdullaprogress
05/10/2024Energy Code Compliance InspectionsWalid Abdullaprogress
05/10/2024Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
05/10/2024Fire-Resistant Penetrations and JointsWalid Abdullaspecial
▾Documents — 23 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/21/2026S00963089-I1Request digital key ↗
08/21/2026S00963089-P1Request digital key ↗
08/19/2026S01239739-I1Request digital key ↗
▸Seals & Professional Certifications16
▸DOB NOWProgress Inspector Seal & Signature8
09/01/2026S00963089-P1Open ↗
09/01/2026S00963089-P1Open ↗
09/01/2026S00963089-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/01/2026S00963089-P1Open ↗
09/01/2026S00963089-P1Open ↗
08/30/2026S01239739-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/21/2026S00963089-I1Open ↗
08/21/2026S00963089-P1Open ↗
08/19/2026S01239739-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/21/2026S00963089-I1Open ↗
08/21/2026S00963089-P1Open ↗
08/19/2026S01239739-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026S00963089-I1Open ↗