← Back
Garden apartments
Red Hook Gardens
89 VISITATION PLACE · BIN 3323666
💬 Discuss this project
1972Year Built
3Stories
C9Building Class
R6Zoning
14,310 sfGross Floor Area
12Units
Rent Stabilized404 Open Violations 401 unresolved · 3 paperwork only ▸FDNY Report ↗
Garden apartments · Owner of record: RED HOOK GARDENS HOUS · 11,533 sf lot · 1.24 FAR built · Flood zone AE
Locations of Work
ArchitectureStructuralMechanical
Roof4p · 2 filings · 17 docs
Bulkhead1p · 1 filing · 11 docs
Floor 81p · 1 filing · 11 docs
Floor 71p · 1 filing · 11 docs
Floor 61p · 1 filing · 11 docs
Floor 51p · 1 filing · 11 docs
Floor 41p · 1 filing · 11 docs
Floor 35p · 2 filings · 17 docs
Floor 25p · 2 filings · 17 docs
Floor 11p · 1 filing · 11 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PROCIDA CONSTRUCTION803/21/2026
CARROL GARDENS ASSOCIATION503/21/2026
CARROLL GARDENS ASSOC103/21/2026
RED HOOK GARDENS, LP103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM ZONING, LLC.303/21/2026
BMB BUILDING CONSULTING203/21/2026
Building Lifecycle
All (87)Filed (4)Violation (60)Objection (5)Special Inspection (18)
08/13/2026
Violation issued (HPD, open)
B
08/13/2026
Violation issued (HPD, open)
B
08/13/2026
Violation issued (HPD, open)
B
08/13/2026
Violation issued (HPD, open)
B
08/13/2026
Violation issued (HPD, open)
B
08/13/2026
Violation issued (HPD, open)
B
08/13/2026
Violation issued (HPD, open)
B
06/25/2026
Violation issued (HPD, open)
B
06/25/2026
Violation issued (HPD, open)
B
01/30/2026
Objection raised — Other
01/21/2026
Objection raised — Other
01/21/2026
Objection raised — Other
01/05/2026
Special inspection requirement — Air barrier continuity plan testing
01/05/2026
Special inspection requirement — Vestibules
01/05/2026
Special inspection requirement — Protection of exposed foundation insulation
01/05/2026
Special inspection requirement — Air barrier — testing
12/19/2025
Filed — New Building
INSTALL FOUNDATION AS PER PLANS FILED.
B01327122-S4
12/19/2025
Filed — New Building
INSTALL FOUNDATION AS PER PLANS FILED.
B01327122-I1
12/19/2025
Filed — New Building
INSTALL FOUNDATION AS PER PLANS FILED.
B01327122-S5
12/16/2025
Special inspection requirement — HVAC-R and service water heating system controls
12/16/2025
Special inspection requirement — Shutoff dampers
12/16/2025
Special inspection requirement — HVAC-R and service water heating equipment
12/16/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
12/15/2025
Special inspection requirement — Insulation placement and R values
12/15/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
12/15/2025
Special inspection requirement — Air barrier - visual inspection
12/15/2025
Special inspection requirement — Fenestration areas
12/15/2025
Special inspection requirement — Fenestration air leakage
12/13/2025
Violation issued (HPD, open)
B
12/13/2025
Violation issued (HPD, open)
B
12/13/2025
Violation issued (HPD, closed)
A
12/13/2025
Violation issued (HPD, closed)
C
12/13/2025
Violation issued (HPD, closed)
A
12/13/2025
Violation issued (HPD, open)
B
12/08/2025
Special inspection requirement — Mechanical Systems
12/08/2025
Special inspection requirement — Final
12/02/2025
Special inspection requirement — Lowest Floor Elevation
11/14/2025
Violation issued (HPD, open)
B
11/14/2025
Violation issued (HPD, closed)
A
11/14/2025
Violation issued (HPD, open)
B
11/14/2025
Violation issued (HPD, open)
B
11/14/2025
Violation issued (HPD, open)
B
11/14/2025
Violation issued (HPD, open)
B
11/14/2025
Violation issued (HPD, open)
B
11/14/2025
Violation issued (HPD, open)
B
11/14/2025
Violation issued (HPD, open)
B
11/14/2025
Violation issued (HPD, open)
B
11/14/2025
Violation issued (HPD, open)
B
11/14/2025
Violation issued (HPD, open)
B
11/14/2025
Violation issued (HPD, open)
B
11/02/2025
Objection raised — Admin
11/02/2025
Objection resolved — Resolved
10/09/2025
Filed — Full Demolition
FULL DEMOLITION OF 3 STORY CONCRETE BUILDING LOCATED AT 89 VISITATION PLACE
B01273456-I1
09/11/2025
Special inspection requirement — Structural Stability – Alterations of existing Buildings
09/11/2025
Special inspection requirement — Demolition
08/11/2025
Violation issued (HPD, closed)
A
08/11/2025
Violation issued (HPD, open)
B
08/11/2025
Violation issued (HPD, open)
B
08/11/2025
Violation issued (HPD, open)
B
08/11/2025
Violation issued (HPD, open)
B
Latest 60 of 87 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BISPLISSUEDCEGF & G PLUMBING CORP03/08/2007
BISBLISSUEDCEGF & G PLUMBING CORP05/19/2006
BISPLISSUEDCEGF & G PLUMBING CORP05/09/2005
BISOTISSUEDALMO GROUP CORPORATION06/18/2004
BISPLISSUEDCEGF & G PLUMBING CORP06/04/2004
BISOTISSUEDALMO GROUP CORPORATION09/27/2002
1 project · most recent 12/19/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
12/19/2025——Heating and Air Conditioning Systems
Heat / Cool
__Junk__ 3XJINH-S34VVG-DVNTR 1,655 CFM · Erv ×3
1 project · most recent 12/19/2025
Storm Water/Sanitary
FiledStatusContractorScope
12/19/2025——Storm, Water/Sanitary
1 project · most recent 12/19/2025
Concrete
FiledStatusContractorScope
12/19/2025——Concrete
1 project · most recent 10/09/2025
Fence
FiledStatusContractorScope
10/09/2025——Fence
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
01/05/2026Air barrier continuity plan testing—energy_progress
01/05/2026Vestibules—energy_progress
01/05/2026Protection of exposed foundation insulation—energy_progress
01/05/2026Air barrier — testing —energy_progress
12/16/2025HVAC-R and service water heating system controls—energy_progress
12/16/2025Shutoff dampers—energy_progress
12/16/2025HVAC-R and service water heating equipment—energy_progress
12/16/2025HVAC-R and service water piping design and insulation—energy_progress
12/15/2025Insulation placement and R values—energy_progress
12/15/2025Fenestration and door U-factor and product ratings—energy_progress
12/15/2025Air barrier - visual inspection—energy_progress
12/15/2025Fenestration areas—energy_progress
12/15/2025Fenestration air leakage—energy_progress
12/08/2025Mechanical Systems—special
12/08/2025Final—progress
12/02/2025Lowest Floor Elevation—progress
09/11/2025Structural Stability – Alterations of existing Buildings—special
09/11/2025Demolition—special
▾Documents — 17 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/20/2026B01273456-I1Request digital key ↗
08/19/2026B01327122-S4Request digital key ↗
08/19/2026B01327122-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/19/2026B01327122-I1Open ↗
▸Seals & Professional Certifications4
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/20/2026B01273456-I1Open ↗
08/19/2026B01327122-I1Open ↗
08/19/2026B01327122-S5Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/19/2026B01327122-I1Open ↗
▸Approvals, Objections & Sign-offs2
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter2
08/13/2026B01273456-S1Open ↗
08/13/2026B01273456-I1Open ↗
▸Other Documents5
▸DOB NOWProperty Ownership Certification2
08/20/2026B01273456-I1Open ↗
08/19/2026B01327122-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/19/2026B01327122-I1Open ↗
▸DOB NOWStructure Photographs1
08/13/2026B01273456-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/19/2026B01327122-I1Open ↗