← Back
Miscellaneous educational facility
89 WALWORTH STREET
BROOKLYN · BIN 3048478
💬 Discuss this project
1977Year Built
2Stories
W9Building Class
M1-1Zoning
5,000 sfGross Floor Area
1Units
2 Open Violations 0 unresolved · 2 paperwork only ▸FDNY Report ↗
Miscellaneous educational facility · Owner of record: BAIS RUCHEL BEDFORD INC. · 2,500 sf lot · 2 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
Roof3p · 1 filing · 12 docs
Floor 2Under Construction7p · 2 filings · 20 docs
Floor 1Under Construction9p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BAIS RUCHER BEDFORD INC1003/22/2026
RAIS RUCHEL BEDFORD INC103/22/2026
BEIS RUCHEL DSATMAR INC DBA CENTRAL203/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ADVANCED BUILDERS SERVICES1303/21/2026
NEW YORK ENGINEERING ASSOCIATES P C203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BOINAH SATMAR LLCGeneral Contractor1707/08/2026
P.H. WORKS INCPlumbing307/08/2026
ABZ ELECTRIC INCElectrical203/22/2026
TRISTATE FIRE SPRINK INCFire Protection207/08/2026
PRIME PIPING & HEATING INPlumbing207/08/2026
BERKOWITS REALTY LLCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP56161405/14/2026
NEW YORK ENGINEERING ASSO851104/15/2024
Building Lifecycle
All (123)Filed (16)Permit Issued (19)Signed Off (5)Violation (34)Inspection (15)Objection (4)Special Inspection (30)
05/25/2026
Special inspection requirement — Exterior lighting power
FAHAD FATEH
05/25/2026
Special inspection requirement — Metering
FAHAD FATEH
05/25/2026
Special inspection requirement — Maintenance information
FAHAD FATEH
05/25/2026
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
05/25/2026
Special inspection requirement — Lighting controls
FAHAD FATEH
05/25/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
05/25/2026
Special inspection requirement — Interior lighting power
FAHAD FATEH
05/25/2026
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
05/25/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
05/20/2026
Objection resolved — Addressed
05/19/2026
Objection raised — Other
05/14/2026
Filed — Alteration CO
Alt-CO application filed for interior renovation and addition of second floor. No change to bulk. Use changed to Community Facility kitchen services to serve the Community Facility use located at 96 Sanford Street, block: 1736, lot: 18.
B00785370-A3
05/12/2026
Special inspection requirement — Lighting controls
FAHAD FATEH
05/12/2026
Special inspection requirement — Metering
FAHAD FATEH
05/12/2026
Special inspection requirement — Exterior lighting power
FAHAD FATEH
05/12/2026
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
05/12/2026
Special inspection requirement — Maintenance information
FAHAD FATEH
05/12/2026
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
05/12/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
05/12/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
05/12/2026
Special inspection requirement — Interior lighting power
FAHAD FATEH
05/04/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/21/2026
Filed — Alteration CO
Alt-CO application filed for interior renovation and addition of second floor. No change to bulk. Use changed to Community Facility kitchen services to serve the Community Facility use located at 96 Sanford Street, block: 1736, lot: 18.
B00785370-A2
04/21/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/21/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/21/2026
Special inspection requirement — Lighting controls
FAHAD FATEH
04/21/2026
Special inspection requirement — Interior lighting power
FAHAD FATEH
04/21/2026
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
04/21/2026
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
04/21/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
04/21/2026
Special inspection requirement — Exterior lighting power
FAHAD FATEH
04/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
04/21/2026
Special inspection requirement — Maintenance information
FAHAD FATEH
04/21/2026
Special inspection requirement — Metering
FAHAD FATEH
03/12/2026
Signed off — Alteration CO
Alt-CO application filed for interior renovation and addition of second floor. No change to bulk. Use changed to Community Facility kitchen services to serve the Community Facility use located at 96 Sanford Street, block: 1736, lot: 18.
B00785370-S3
02/02/2026
Signed off — Alteration CO
Alt-CO application filed for interior renovation and addition of second floor. No change to bulk. Use changed to Community Facility kitchen services to serve the Community Facility use located at 96 Sanford Street, block: 1736, lot: 18.
B00785370-S1
01/29/2026
Filed — Alteration CO
Alt-CO application filed for interior renovation and addition of second floor. No change to bulk. Use changed to Community Facility kitchen services to serve the Community Facility use located at 96 Sanford Street, block: 1736, lot: 18.
B00785370-A1
01/28/2026
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
01/28/2026
Special inspection requirement — Mechanical Systems
FAHAD FATEH
01/28/2026
Special inspection requirement — Heating Systems
FAHAD FATEH
01/15/2026
Signed off — Alteration
Plumbing application filed subsequent to Alt-CO, job number: B00785370-I1.
B08000847-I1
01/13/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
12/11/2025
Permit issued — General Construction
B00785370-I1-GC
08/29/2025
Filed — Alteration CO
Alt-CO application filed for interior renovation and addition of second floor. No change to bulk. Use changed to Community Facility kitchen services to serve the Community Facility use located at 96 Sanford Street, block: 1736, lot: 18.
B00785370-P9
08/22/2025
Filed — Alteration CO
Alt-CO application filed for interior renovation and addition of second floor. No change to bulk. Use changed to Community Facility kitchen services to serve the Community Facility use located at 96 Sanford Street, block: 1736, lot: 18.
B00785370-P8
07/02/2025
Permit issued — Mechanical Systems
B00785370-S3-MS
07/02/2025
Permit issued — General Construction
B00785370-I1-GC
06/23/2025
Permit issued — Plumbing
B08000847-I1-PL
06/23/2025
Permit issued — Sprinklers
B00785370-S1-EW-SP
06/23/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/14/2025
Filed — Alteration CO
Alt-CO application filed for interior renovation and addition of second floor. No change to bulk. Use changed to Community Facility kitchen services to serve the Community Facility use located at 96 Sanford Street, block: 1736, lot: 18.
B00785370-P6
04/08/2025
Objection resolved — Addressed
04/07/2025
Objection raised — Other
03/27/2025
Filed — Alteration
Plumbing application filed subsequent to Alt-CO, job number: B00785370-I1.
B08000847-P1
02/28/2025
Filed — Alteration CO
Alt-CO application filed for interior renovation and addition of second floor. No change to bulk. Use changed to Community Facility kitchen services to serve the Community Facility use located at 96 Sanford Street, block: 1736, lot: 18.
B00785370-P3
01/24/2025
Signed off — Alteration
INSTALL BOILER FOR PROCESS STEAM.
B01031555-I1
01/03/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
12/11/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/10/2024
Violation issued (ECB, closed)
Construction
08/28/2024
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
Latest 60 of 123 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedBOINAH SATMAR12/11/2025
DOB NOWMechanical SystemsSigned-offBOINAH SATMAR07/02/2025
DOB NOWGeneral ConstructionPermit IssuedBOINAH SATMAR07/02/2025
DOB NOWPlumbingSigned-offPRIME PIPING & HEATING IN06/23/2025
DOB NOWSprinklersSigned-offTRISTATE FIRE SPRINK INC06/23/2025
DOB NOWPlumbingSigned-offPRIME PIPING & HEATING IN06/21/2024
DOB NOWBoiler EquipmentSigned-offP.H. WORKS INC04/23/2024
DOB NOWSprinklersSigned-offTRISTATE FIRE SPRINK INC12/07/2023
DOB NOWMechanical SystemsSigned-offBOINAH SATMAR11/30/2023
DOB NOWConstruction FenceSigned-offBOINAH SATMAR11/29/2023
DOB NOWGeneral ConstructionPermit IssuedBOINAH SATMAR11/29/2023
DOB NOWPlumbingSigned-offP.H. WORKS INC11/14/2023
DOB NOWGeneral ConstructionPermit IssuedBOINAH SATMAR11/02/2023
DOB NOWConstruction FenceSigned-offBOINAH SATMAR08/02/2023
DOB NOWMechanical SystemsSigned-offBOINAH SATMAR01/05/2023
DOB NOWPlumbingSigned-offP.H. WORKS INC11/15/2022
DOB NOWGeneral ConstructionPermit IssuedBOINAH SATMAR11/11/2022
DOB NOWConstruction FenceSigned-offBOINAH SATMAR08/29/2022
DOB NOWConstruction FenceSigned-offBERKOWITS REALTY LLC08/25/2022
1 project · most recent 05/14/2026
Heating and Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
05/14/2026Permit IssuedBOINAH SATMAR LLCHeating and Air Conditioning Systems, Heating Systems
Heat / Cool
Mitsubishi Electric PUHY-P72TNU-A. 72,000 BTU · Vrf Outdoor ×4
MUZ-D30NA 30,700 BTU · Condensing Unit ×3
MXZ-SM48NAM2. 48,000 BTU · Condensing Unit ×2
PUHY-P72TNU-A 72,000 BTU · Vrf Outdoor ×2
MXZ-SM48NAM2 48,000 BTU · Condensing Unit ×1
Trenton TEZA011H8-HT3D-B 119,000 BTU · Condensing Unit ×3
TEZA020H8-HT3D-B. 20,100 BTU · Condensing Unit ×2
TEZA035L8-HT3D-F. 15,300 BTU · Condensing Unit ×2
TEZA045L8-HT3D-F. 18,000 BTU · Condensing Unit ×2
TEZA020H8-HT3D-B 20,100 BTU · Condensing Unit ×1
TEZA035L8-HT3D-F 15,300 BTU · Condensing Unit ×1
TEZA045L8-HT3D-F 18,000 BTU · Condensing Unit ×1
Bohn BCH0015MCACZA0000. 17,540 BTU · Condensing Unit ×2
BCH0022LCBCZA0200. 7,550 BTU · Condensing Unit ×1
BCH0022LCBCZA0000. 7,550 BTU · Condensing Unit ×1
BCH0015MCACZA0000 17,540 BTU · Condensing Unit ×1
BCH0022LCBCZA0200 7,550 BTU · Condensing Unit ×1
Heating
— A4-D.1000-30D-MPU 487,420 BTU · Makeup Air ×2
Captiveaire A4-D.1000-30D-MPU 487,420 BTU ×1
1 project · most recent 05/14/2026
Sprinkler System
FiledStatusContractorScope
05/14/2026Signed-offTRISTATE FIRE SPRINK INCSprinkler System
1 project · most recent 05/14/2026
FiledStatusContractorScope
05/14/2026———
1 project · most recent 01/22/2025
General Wiring
FiledStatusContractorScope
01/22/2025CompleteABZ ELECTRIC INCGeneral Wiring
1 project · most recent 05/14/2026
FiledStatusContractorScope
05/14/2026Permit IssuedBOINAH SATMAR LLC1 scope_items
▾Field Inspections (DOB CAP) — 15
DateTypeResultReport
05/04/2026Pass-Final CND-Occupancy InspectionPassView ↗
04/21/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/21/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/13/2026Pass-Final PL - UndergroundPassView ↗
06/23/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/03/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/28/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
08/28/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/22/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/22/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
06/11/2024Pass-Final SP - Up to 3 Requested FloorsPassView ↗
06/06/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/06/2024Fail-Final SP - Up to 3 Requested FloorsFailView ↗
06/03/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/23/2024Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 90
DateRequirementInspectorRole
05/25/2026Maintenance informationFAHAD FATEHenergy_progress
05/25/2026Lighting controlsFAHAD FATEHenergy_progress
05/25/2026Energy Code Compliance InspectionsFAHAD FATEHprogress
05/25/2026Fire-Resistance Rated ConstructionFAHAD FATEHprogress
05/25/2026Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
05/25/2026Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
05/25/2026Interior lighting powerFAHAD FATEHenergy_progress
05/25/2026Exterior lighting powerFAHAD FATEHenergy_progress
05/25/2026MeteringFAHAD FATEHenergy_progress
05/12/2026Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
05/12/2026Maintenance informationFAHAD FATEHenergy_progress
05/12/2026Lighting controlsFAHAD FATEHenergy_progress
05/12/2026Exterior lighting powerFAHAD FATEHenergy_progress
05/12/2026MeteringFAHAD FATEHenergy_progress
05/12/2026Interior lighting powerFAHAD FATEHenergy_progress
05/12/2026Fire-Resistance Rated ConstructionFAHAD FATEHprogress
05/12/2026Energy Code Compliance InspectionsFAHAD FATEHprogress
05/12/2026Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
04/21/2026Interior lighting powerFAHAD FATEHenergy_progress
04/21/2026Maintenance informationFAHAD FATEHenergy_progress
04/21/2026MeteringFAHAD FATEHenergy_progress
04/21/2026Exterior lighting powerFAHAD FATEHenergy_progress
04/21/2026Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
04/21/2026Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
04/21/2026Energy Code Compliance InspectionsFAHAD FATEHprogress
Latest 25 of 90.
▾Documents — 100 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch16
08/28/2026B00785364-I1Request digital key ↗
08/28/2026B08000847-I1Request digital key ↗
08/25/2026B01031555-I1Request digital key ↗
Showing 3 of 16 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00785370-I1Open ↗
▸Seals & Professional Certifications59
▸DOB NOWSpecial Inspector Seal & Signature24
09/27/2026B00785370-P8Open ↗
09/27/2026B00785370-P8Open ↗
09/23/2026B01031555-I1Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWProgress Inspector Seal & Signature19
09/23/2026B01031555-I1Open ↗
08/29/2026B00785370-A3Open ↗
08/29/2026B00785370-A3Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature16
08/28/2026B08000847-P1Open ↗
08/28/2026B08000847-I1Open ↗
08/17/2026B00785370-P2Open ↗
Showing 3 of 16 on file for this type
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist3
08/17/2026B00785370-A2Open ↗
08/15/2026B00785370-A3Open ↗
08/13/2026B00785370-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00785370-I1Open ↗
▸Environmental & Asbestos14
▸DOB NOWDEP ACP-5: Asbestos Assessment Report14
08/28/2026B08000847-I1Open ↗
08/17/2026B00785370-S1Open ↗
08/17/2026B00785370-I1Open ↗
Showing 3 of 14 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026B00785370-I1Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026B00785370-S3Open ↗
▸Other Documents4
▸DOB NOWProperty Ownership Certification3
08/17/2026B00785370-I1Open ↗
08/17/2026B00785370-A2Open ↗
08/15/2026B00785370-A3Open ↗
▸DOB NOWFinal Survey1
08/17/2026B00785370-I1Open ↗