Elevator apt, fireproof with stores
Nehemiah Gateway Site 26A
890 ERSKINE STREET · BIN 3429398
💬 Discuss this project
2024Year Built
8Stories
D6Building Class
R6Zoning
139,723 sfGross Floor Area
185Units
0 Active ViolationsFDNY Report ↗
Elevator apt, fireproof with stores · Owner of record: Nehemiah Spring Creek 26A Housing Develo Pment Fund · 34,665 sf lot · 4.03 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentLandscapeCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projects1 filing
RoofNehemiah 26a1p · 1 filing
Floor 1Monadnock DevelopmentUnder Construction2p · 2 filings · 4 docs
Site & exteriorNehemiah Spring Creek3 filings
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC Department of Housing Preservation and Development4407/08/2026
Monadnock Development3209/01/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JRS Engineering Services207/20/2026
De Nardis Engineering802/27/2026
Josephine Zurica1111/25/2025
Andrew Bernheimer511/05/2025
Dseny Engineering Services211/05/2025
Heng Loke309/03/2025
HC Pec606/14/2025
Synergic Design Architects103/20/2025
Ryan Hansen305/13/2024
Sue McCoy203/27/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM Zoning4103/21/2026
A1 Expediting Service403/21/2026
Dseny Engineering Services403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Monadnock ConstructionGeneral Contractor1807/08/2026
PJP InstallersScaffold307/08/2026
Rael Automatic Sprinkler CoFire Protection307/08/2026
Rael Automatic Sprinkler CoFire Protection307/08/2026
Long Island ConcreteScaffold307/08/2026
Monadnock ConstructionScaffold207/08/2026
Parkview P&HPlumbing207/08/2026
Tuxedo Electrical ContractingElectrical103/22/2026
Accord PowerGeneral Contractor107/08/2026
Accord Power ElectricElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Amaracon Testing & Inspec58422202/27/2026
Synergic Design8561103/20/2025
Building Lifecycle
All (138)Filed (43)Permit Issued (29)Signed Off (11)Violation (6)Inspection (10)Objection (9)Special Inspection (30)
09/01/2026
Signed off — New Building
Structural work as per plans filed. Filed in conjunction with DOB Now NB #B08021996-I1
B08021996-S8
08/12/2026
Signed off — New Building
Structural work as per plans filed. Filed in conjunction with DOB Now NB #B08021996-I1
B08021996-S6
08/06/2026
Signed off — New Building
Structural work as per plans filed. Filed in conjunction with DOB Now NB #B08021996-I1
B08021996-S5
07/31/2026
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
07/20/2026
Filed — Alteration
B01142334-P1
06/12/2026
Permit issued — Curb Cut
B08021996-S6-CC
06/08/2026
Signed off — New Building
Structural work as per plans filed. Filed in conjunction with DOB Now NB #B08021996-I1
B08021996-S2
06/08/2026
Signed off — New Building
Structural work as per plans filed. Filed in conjunction with DOB Now NB #B08021996-I1
B08021996-S7
06/08/2026
Signed off — New Building
Structural work as per plans filed. Filed in conjunction with DOB Now NB #B08021996-I1
B08021996-S4
04/30/2026
Signed off — Alteration
INSTALLATION OF SCAFFOLD FOR EXTERIOR WORK AT BUILDING FACADES.
B01094029-I1
04/27/2026
Signed off — New Building
Structural work as per plans filed. Filed in conjunction with DOB Now NB #B08021996-I1
B08021996-S9
03/23/2026
Objection raised — Inspections
02/27/2026
Filed — New Building
Structural work as per plans filed. Filed in conjunction with DOB Now NB #B08021996-I1
B08021996-B8
02/27/2026
Special inspection requirement — Post-installed Anchors
CONNIE PISANI
02/27/2026
Special inspection requirement — Final
CONNIE PISANI
02/27/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
CONNIE PISANI
02/27/2026
Special inspection requirement — Concrete - Cast-In-Place
CONNIE PISANI
02/27/2026
Special inspection requirement — Deep Foundation Elements
CONNIE PISANI
02/27/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
CONNIE PISANI
02/27/2026
Special inspection requirement — Footing and Foundation
CONNIE PISANI
02/10/2026
Signed off — Alteration
INSTALLATION OF SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01103918-I1
02/04/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/19/2025
Violation issued (ECB, closed)
Unknown
12/19/2025
Violation issued (ECB, closed)
Unknown
12/19/2025
Violation issued (ECB, closed)
Construction
12/19/2025
Violation issued (ECB, closed)
Unknown
12/17/2025
Special inspection requirement — Concrete – Prestressed
CONNIE PISANI
12/17/2025
Special inspection requirement — Post-installed Anchors
CONNIE PISANI
12/17/2025
Special inspection requirement — Structural Steel - Details
CONNIE PISANI
12/17/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
CONNIE PISANI
12/17/2025
Special inspection requirement — Structural Steel - Welding
CONNIE PISANI
12/17/2025
Special inspection requirement — HVAC-R and service water heating system controls
CONNIE PISANI
12/17/2025
Special inspection requirement — Concrete - Cast-In-Place
CONNIE PISANI
12/17/2025
Special inspection requirement — Concrete - Precast
CONNIE PISANI
12/17/2025
Special inspection requirement — Electrical motors and elevators
CONNIE PISANI
12/17/2025
Special inspection requirement — Structural Steel - High Strength Bolting
CONNIE PISANI
12/17/2025
Special inspection requirement — Maintenance information
CONNIE PISANI
12/17/2025
Special inspection requirement — Lighting in dwelling units
CONNIE PISANI
12/17/2025
Special inspection requirement — HVAC-R and service water heating equipment
CONNIE PISANI
12/17/2025
Special inspection requirement — Metering
CONNIE PISANI
12/17/2025
Special inspection requirement — Shutoff dampers
CONNIE PISANI
12/17/2025
Special inspection requirement — Lighting controls
CONNIE PISANI
12/17/2025
Special inspection requirement — Final
CONNIE PISANI
12/17/2025
Special inspection requirement — Exterior lighting power
CONNIE PISANI
12/17/2025
Special inspection requirement — Mechanical Systems
CONNIE PISANI
12/17/2025
Special inspection requirement — Masonry
CONNIE PISANI
12/17/2025
Special inspection requirement — Energy Code Compliance Inspections
CONNIE PISANI
12/17/2025
Special inspection requirement — Interior lighting power
CONNIE PISANI
12/17/2025
Special inspection requirement — Final
CONNIE PISANI
12/02/2025
Objection resolved — Addressed
11/25/2025
Filed — New Building
Structural work as per plans filed. Filed in conjunction with DOB Now NB #B08021996-I1
B08021996-B6
11/25/2025
Filed — New Building
Structural work as per plans filed. Filed in conjunction with DOB Now NB #B08021996-I1
B08021996-B7
11/24/2025
Objection raised — Other
11/19/2025
Permit issued — Supported Scaffold
B01094029-I1-SF
11/19/2025
Permit issued — General Construction
B01142334-I1-GC
11/18/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
11/14/2025
Signed off — Alteration
Installation of 97.555 kw solar energy system on roof. no change of occupancy, use or egress.
B01166117-I1
11/14/2025
Permit issued — Mechanical Systems
B08021996-S4-MS
11/05/2025
Filed — New Building
Structural work as per plans filed. Filed in conjunction with DOB Now NB #B08021996-I1
B08021996-B2
11/05/2025
Filed — Alteration
INSTALLATION OF SCAFFOLD FOR EXTERIOR WORK AT BUILDING FACADES.
B01094029-P1
Latest 60 of 138 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offMonadnock Construction06/12/2026
DOB NOWSupported ScaffoldSigned-offLong Island Concrete11/19/2025
DOB NOWGeneral ConstructionPermit IssuedMonadnock Construction11/19/2025
DOB NOWMechanical SystemsSigned-offMonadnock Construction11/14/2025
DOB NOWSidewalk ShedSigned-offPJP Installers09/02/2025
DOB NOWStructuralPermit IssuedMonadnock Construction07/07/2025
DOB NOWGeneral ConstructionPermit IssuedMonadnock Construction07/07/2025
DOB NOWPlumbingSigned-offParkview P&H06/24/2025
DOB NOWStandpipeSigned-offRael Automatic Sprinkler Co06/17/2025
DOB NOWSprinklersSigned-offRael Automatic Sprinkler Co06/17/2025
DOB NOWStandpipeSigned-offRael Automatic Sprinkler Co06/13/2025
DOB NOWFoundationSigned-offMonadnock Construction05/16/2025
DOB NOWSupport of ExcavationPermit IssuedMonadnock Construction04/10/2025
DOB NOWSolarSigned-offAccord Power03/31/2025
DOB NOWConstruction FenceSigned-offMonadnock Construction02/24/2025
DOB NOWGeneral ConstructionPermit IssuedMonadnock Construction12/11/2024
DOB NOWProtection and Mechanical MethodsSigned-offPJP Installers10/28/2024
DOB NOWSupported ScaffoldSigned-offLong Island Concrete10/24/2024
DOB NOWMechanical SystemsSigned-offMonadnock Construction10/15/2024
DOB NOWSidewalk ShedSigned-offPJP Installers09/03/2024
DOB NOWSprinklersSigned-offRael Automatic Sprinkler Co08/08/2024
DOB NOWStandpipeSigned-offRael Automatic Sprinkler Co08/08/2024
DOB NOWStandpipeSigned-offRael Automatic Sprinkler Co08/08/2024
DOB NOWStructuralPermit IssuedMonadnock Construction08/05/2024
DOB NOWGeneral ConstructionPermit IssuedMonadnock Construction08/02/2024
DOB NOWPlumbingSigned-offParkview P&H07/15/2024
DOB NOWFoundationSigned-offMonadnock Construction05/02/2024
DOB NOWSupport of ExcavationPermit IssuedMonadnock Construction04/25/2024
DOB NOWConstruction FenceSigned-offMonadnock Construction03/07/2024
1 project · most recent 02/27/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
02/27/2026Signed-offMonadnock ConstructionHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric PUY-A24NHA7 24,000 BTU · Condensing Unit ×9
ARUM096BTE5 96,000 BTU · Vrf Outdoor ×6
ARUM144BTE5 144,000 BTU · Vrf Outdoor ×3
PKA-A24KA7.TH 26,000 BTU · Fan Coil Indoor ×3
Ice Air RSXC09 9,200 BTU · Heat Pump Outdoor ×3
RSXC13 12,500 BTU · Heat Pump Outdoor ×3
RSXC18 16,300 BTU · Heat Pump Outdoor ×3
1 project · most recent 02/27/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
02/27/2026Signed-offParkview P&HGas, Storm, Water/Sanitary
9 projects · most recent 05/20/2026
General Wiring
FiledStatusContractorScope
05/20/2026Permit IssuedS. J. ElectricGeneral Wiring
10/10/2025CompleteAccord Power Electric—
12/17/2024Permit IssuedTuxedo Electrical Contracting—
11/25/2024CompleteS. J. Electric—
10/30/2024CompleteS. J. Electric—
09/18/2024CompleteRaiden ElectricGeneral Wiring
09/12/2024CompleteSpice Electric Company—
05/13/2024CompleteS. J. Electric1 meters, 1 new_meters
05/13/2024CompleteS. J. Electric—
1 project · most recent 02/27/2026
Steel Concrete Masonry
FiledStatusContractorScope
02/27/2026Signed-offMonadnock ConstructionSteel, Concrete, Masonry
1 project · most recent 11/05/2025
Scaffold
FiledStatusContractorScope
11/05/2025Signed-offLong Island ConcreteScaffold
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
07/31/2026Pass-Final Curb Cut Non-Directive 14PassView ↗
02/04/2026Pass-Final CND-Occupancy InspectionPassView ↗
11/18/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/25/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
03/10/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/11/2025Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
09/13/2024Pass-Final PL - UndergroundPassView ↗
08/28/2024Pass-Final PL - UndergroundPassView ↗
08/14/2024Pass-Final PL - UndergroundPassView ↗
07/31/2024Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
02/27/2026Excavations - Sheeting, Shoring, and BracingCONNIE PISANIspecial
02/27/2026Post-installed AnchorsCONNIE PISANIspecial
02/27/2026Subsurface Conditions – Fill Placement & In-Place DensityCONNIE PISANIspecial
02/27/2026FinalCONNIE PISANIprogress
02/27/2026Footing and FoundationCONNIE PISANIprogress
02/27/2026Concrete - Cast-In-PlaceCONNIE PISANIspecial
02/27/2026Deep Foundation ElementsCONNIE PISANIspecial
12/17/2025Shutoff dampersCONNIE PISANIenergy_progress
12/17/2025Lighting controlsCONNIE PISANIenergy_progress
12/17/2025Concrete – PrestressedCONNIE PISANIspecial
12/17/2025Concrete - Cast-In-PlaceCONNIE PISANIspecial
12/17/2025Post-installed AnchorsCONNIE PISANIspecial
12/17/2025Structural Steel - WeldingCONNIE PISANIspecial
12/17/2025Concrete - PrecastCONNIE PISANIspecial
12/17/2025Structural Steel - DetailsCONNIE PISANIspecial
12/17/2025Maintenance informationCONNIE PISANIenergy_progress
12/17/2025Lighting in dwelling unitsCONNIE PISANIenergy_progress
12/17/2025Exterior lighting powerCONNIE PISANIenergy_progress
12/17/2025HVAC-R and service water heating equipmentCONNIE PISANIenergy_progress
12/17/2025Electrical motors and elevatorsCONNIE PISANIenergy_progress
12/17/2025MeteringCONNIE PISANIenergy_progress
12/17/2025FinalCONNIE PISANIprogress
12/17/2025MasonryCONNIE PISANIspecial
12/17/2025Structural Steel - High Strength BoltingCONNIE PISANIspecial
12/17/2025Mechanical SystemsCONNIE PISANIspecial
Latest 25 of 150.
▾Documents — 245 on file (BIS + DOB NOW)
▸Plans & Drawings41
▸DOB NOWPlans/Sketch41
08/25/2026B08021996-P3Request digital key ↗
08/25/2026B08021996-P2Request digital key ↗
08/25/2026B08021996-P1Request digital key ↗
Showing 3 of 41 on file for this type
▸Applications & Permits18
▸DOB NOWDEP Stormwater Construction Permit10
08/25/2026B08021996-S3Open ↗
08/25/2026B08021996-S1Open ↗
08/25/2026B08021996-I1Open ↗
Showing 3 of 10 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION6
11/17/2025340871453Open ↗
11/10/2025340871453Open ↗
08/18/2025340871453Open ↗
Showing 3 of 6 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
08/07/2023340871453Open ↗
12/23/2022340871453Open ↗
▸Zoning, Tax Lot & Property Records11
▸DOB NOWZD1: DOB Zoning Diagram5
08/25/2026B08021996-P2Open ↗
08/25/2026B08021996-I1Open ↗
08/25/2026B08021996-B2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWZoning Exhibit form (1-5)5
08/25/2026B08021996-P2Open ↗
08/25/2026B08021996-I1Open ↗
08/25/2026B08021996-B2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/25/2026B08021996-I1Open ↗
▸Seals & Professional Certifications92
▸DOB NOWDPL-1: Design Professional Seal & Signature42
08/25/2026B08021996-S5Open ↗
08/25/2026B08021996-P3Open ↗
08/25/2026B08021996-S9Open ↗
Showing 3 of 42 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature27
09/05/2026B01094029-P1Open ↗
09/01/2026B08021996-S8Open ↗
09/01/2026B08021996-B8Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWProgress Inspector Seal & Signature21
09/01/2026B08021996-B8Open ↗
08/31/2026B08021996-S4Open ↗
08/31/2026B08021996-S4Open ↗
Showing 3 of 21 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
12/23/2022340871453Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
12/23/2022340871453Open ↗
▸Trade Schedules & Equipment1
▸DOB NOWStandpipe Alarms Drawings1
08/25/2026B08021996-I1—
▸Safety & Tenant Protection12
▸DOB NOWStreet Tree Checklist5
08/25/2026B08021996-P2Open ↗
08/25/2026B08021996-I1Open ↗
08/25/2026B08021996-B2Open ↗
Showing 3 of 5 on file for this type
▸BISSTREET TREE CHECKLIST4
08/07/2023340871453Open ↗
02/21/2023340871453Open ↗
02/21/2023340871453Open ↗
Showing 3 of 4 on file for this type
▸BISBPP: STREET TREES SITE PLAN1
08/07/2023340871453Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/25/2026B08021996-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/25/2026B08021996-I1Open ↗
▸Energy Compliance2
▸DOB NOWPreliminary Commissioning Report Certification2
08/25/2026B08021996-S4Open ↗
08/25/2026B08021996-S5Open ↗
▸Inspections & Test Reports9
▸DOB NOWSOIL REPORT7
08/25/2026B08021996-P3Open ↗
08/25/2026B08021996-S3Open ↗
08/25/2026B08021996-S1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram2
08/25/2026B08021996-S3Open ↗
08/25/2026B08021996-S1Open ↗
▸Approvals, Objections & Sign-offs36
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter35
08/25/2026B08021996-P3Open ↗
08/25/2026B08021996-P1Open ↗
08/25/2026B08021996-S9Open ↗
Showing 3 of 35 on file for this type
▸DOB NOWUtility Company Final Acceptance Letter1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms5
▸BISADDITIONAL INFORMATION3
09/05/2025340871453Open ↗
07/17/2025340871453Open ↗
02/21/2023340871453Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
12/23/2022340871453Open ↗
▸DOB NOWAI1 Form (from plan PDF)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Other Documents18
▸DOB NOWSite Survey: Initial5
08/25/2026B08021996-P2Open ↗
08/25/2026B08021996-I1Open ↗
08/25/2026B08021996-B2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
08/25/2026B08021996-I1Open ↗
08/25/2026B08021996-P2Open ↗
08/25/2026B08021996-B2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProperty Ownership Certification3
08/25/2026B08021996-I1Open ↗
08/25/2026B08021996-B2Open ↗
08/25/2026B08021996-A3Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF Property Tax Assessment Roll2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTREE REMOVAL: OUTSIDE PROP./PARKS APPR1
08/07/2023340871453Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
02/21/2023340871453Open ↗
▸DOB NOWAdjoining Owners Notification1
08/25/2026B08021996-S3Open ↗