← Back
Primarily 2 family with 1 store or office
8902 3 AVENUE
BROOKLYN · BIN 3154131
💬 Discuss this project
1923Year Built
2Stories
S2Building Class
R6BZoning
3,600 sfGross Floor Area
3Units
4 Open Violations 3 unresolved · 1 paperwork only ▸FDNY Report ↗
Primarily 2 family with 1 store or office · Owner of record: 8902 LLC · 1,800 sf lot · 2 FAR built · Flood zone X
Locations of Work
Architecture
Roof1p · 1 filing · 12 docs
3 jobs · most recent 04/29/2026
General Wiring
FiledStatusContractorScope
04/29/2026Permit IssuedJ.V.C. ELEC SERVICE CORPGeneral Wiring
06/23/2025CompleteMERRICK TECH ELEC CORP4 meters, 1 new_meters
05/15/2025CompletePOWER SURGE ELECTRIC, INCGeneral Wiring
1 job · most recent 04/30/2026
Sidewalk Shed
FiledStatusContractorScope
04/30/2026Permit IssuedJNJ CONSTRUCTION GROUP LLSidewalk Shed
Building Lifecycle
All (37)Filed (4)Permit Issued (5)Signed Off (2)Violation (8)Special Inspection (18)
08/10/2026
Permit issued — Sidewalk Shed
B01394361-I1-SH
07/31/2026
Permit issued — General Construction
B01417623-I1-GC
07/30/2026
Violation issued (ECB, open)
Construction
07/07/2026
Filed — Alteration
Maintenance and repair of existing brick facade including parapet. Associated scaffold filing: B01394361-I1-SH.
B01417623-I1
06/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MARYAM RAKSHAN
06/16/2026
Special inspection requirement — Tenant Protection Plan Compliance
MARYAM RAKSHAN
06/16/2026
Special inspection requirement — Masonry
MARYAM RAKSHAN
06/16/2026
Special inspection requirement — Final
MARTIN MALEK
05/01/2026
Permit issued — Sidewalk Shed
B01394361-I1-SH
04/30/2026
Filed — Alteration
28-105.4.1 Emergency Work- Installation of sidewalk shed as directed by Brooklyn Boro Commissioner IED20211 to protect public from falling debris. No change in use, egress or occupacny. we shall comply with chapter 33 of 2022 B.C
B01394361-I1
04/28/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/27/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/27/2026
Violation issued (ECB, open)
Construction
10/30/2025
Signed off — Alteration
Renovation of existing commercial space on the ground floor
B01220402-S1
10/07/2025
Signed off — Alteration
Renovation of existing commercial space on the ground floor
B01220402-I1
09/23/2025
Permit issued — Mechanical Systems
B01220402-S1-MS
05/08/2025
Permit issued — General Construction
B01220402-I1-GC
05/05/2025
Filed — Alteration
Renovation of existing commercial space on the ground floor
B01220402-S1
05/05/2025
Filed — Alteration
Renovation of existing commercial space on the ground floor
B01220402-I1
05/04/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Thomas Barry
05/04/2025
Special inspection requirement — Fenestration areas
Thomas Barry
05/04/2025
Special inspection requirement — Lighting controls
Thomas Barry
05/04/2025
Special inspection requirement — Mechanical Systems
Thomas Barry
05/04/2025
Special inspection requirement — Final
Thomas Barry
05/04/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Thomas Barry
05/04/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Thomas Barry
05/04/2025
Special inspection requirement — Maintenance information
Thomas Barry
05/04/2025
Special inspection requirement — HVAC-R and service water heating system controls
Thomas Barry
05/04/2025
Special inspection requirement — Shutoff dampers
Thomas Barry
05/04/2025
Special inspection requirement — HVAC-R and service water heating equipment
Thomas Barry
05/04/2025
Special inspection requirement — Final
Thomas Barry
05/04/2025
Special inspection requirement — Fenestration air leakage
Thomas Barry
05/04/2025
Special inspection requirement — Interior lighting power
Thomas Barry
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/13/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/16/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/10/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/08/2023$1.9M—8902 THIRD AVENUE, LLC → 8902 LLC$528/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RAKSHAN MALEK ASSOCIATES, INC.107/07/2026
CONAPAC SERVICES, DBA104/30/2026
OPERA STUDIO ARCHITECTURE, LLC205/05/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HIGH QUALITY CONSTRUCTIONGeneral Contractor207/08/2026
JNJ CONSTRUCTION GROUP LLGeneral Contractor208/11/2026
MALEK & RAKSHAN ASSGeneral Contractor108/01/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RAKSHAN MALEK ASSOCIATES3352107/07/2026
OPERA STUDIO ARCHITECTURE5970205/05/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedJNJ CONSTRUCTION GROUP LL08/10/2026
DOB NOWGeneral ConstructionPermit IssuedMALEK & RAKSHAN ASS07/31/2026
DOB NOWSidewalk ShedPermit IssuedJNJ CONSTRUCTION GROUP LL05/01/2026
DOB NOWMechanical SystemsSigned-offHIGH QUALITY CONSTRUCTION09/23/2025
DOB NOWGeneral ConstructionSigned-offHIGH QUALITY CONSTRUCTION05/08/2025
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
06/16/2026Fire-Resistant Penetrations and JointsMARYAM RAKSHANspecial
06/16/2026Tenant Protection Plan ComplianceMARYAM RAKSHANspecial
06/16/2026MasonryMARYAM RAKSHANspecial
06/16/2026FinalMARTIN MALEKprogress
05/04/2025Fenestration and door U-factor and product ratingsThomas Barryenergy_progress
05/04/2025Fenestration areasThomas Barryenergy_progress
05/04/2025Lighting controlsThomas Barryenergy_progress
05/04/2025Mechanical SystemsThomas Barryspecial
05/04/2025FinalThomas Barryprogress
05/04/2025Fire-Resistant Penetrations and JointsThomas Barryspecial
05/04/2025HVAC-R and service water piping design and insulationThomas Barryenergy_progress
05/04/2025Maintenance informationThomas Barryenergy_progress
05/04/2025HVAC-R and service water heating system controlsThomas Barryenergy_progress
05/04/2025Shutoff dampersThomas Barryenergy_progress
05/04/2025HVAC-R and service water heating equipmentThomas Barryenergy_progress
05/04/2025FinalThomas Barryprogress
05/04/2025Fenestration air leakageThomas Barryenergy_progress
05/04/2025Interior lighting powerThomas Barryenergy_progress
▾Documents — 18 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/21/2026B01220402-S1Request digital key ↗
08/21/2026B01220402-I1Request digital key ↗
08/17/2026B01394361-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications12
▸DOB NOWProgress Inspector Seal & Signature5
09/02/2026B01220402-I1Open ↗
09/02/2026B01220402-I1Open ↗
08/30/2026B01220402-S1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/21/2026B01220402-S1Open ↗
08/21/2026B01220402-I1Open ↗
08/17/2026B01394361-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/02/2026B01220402-I1Open ↗
08/30/2026B01220402-S1Open ↗
08/27/2026B01417623-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/21/2026B01220402-S1Open ↗
08/21/2026B01220402-I1Open ↗