← Back
One family attached or semi-detached
8903 RIDGE BOULEVARD
BROOKLYN · BIN 3154104
💬 Discuss this project
1920Year Built
2Stories
A5Building Class
R4-1Zoning
1,625 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
One family attached or semi-detached · 1,800 sf lot · 0.9 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Permit Issued — active, not yet Signed-off
Floor 2Under Construction9p · 1 filing · 20 docs
Floor 1Under Construction8p · 1 filing · 20 docs
CellarUnder Construction8p · 1 filing · 20 docs
1 job · most recent 02/13/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
02/13/2026Permit IssuedAMERICAN STANDARD P&H CORGas, Storm, Water/Sanitary
1 job · most recent 12/26/2025
General Wiring
FiledStatusContractorScope
12/26/2025Permit IssuedERIC & NG ELEC'L, INC.General Wiring
Building Lifecycle
All (33)Filed (4)Permit Issued (2)Violation (2)Inspection (3)Special Inspection (22)
02/26/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
02/26/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/26/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
02/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAZAL BANGASH
02/17/2026
Special inspection requirement — Fire-Resistance Rated Construction
FAZAL BANGASH
02/17/2026
Special inspection requirement — Energy Code Compliance Inspections
FAZAL BANGASH
02/17/2026
Special inspection requirement — Final
FAZAL BANGASH
02/17/2026
Special inspection requirement — Interior lighting power
FAZAL BANGASH
02/17/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
FAZAL BANGASH
02/17/2026
Special inspection requirement — Fenestration air leakage
FAZAL BANGASH
02/17/2026
Special inspection requirement — Air barrier - visual inspection
FAZAL BANGASH
02/17/2026
Special inspection requirement — Fenestration areas
FAZAL BANGASH
02/17/2026
Special inspection requirement — Insulation placement and R values
FAZAL BANGASH
02/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Chih Hsu
02/13/2026
Filed — Alteration
RENOVATION OF EXISTING 1 FAMILY DWELLING 2-STORY BUILDING WITH CELLAR AND WITH GENERAL CONSTRUCTION WORK AS PER PLANS FILED HEREWITH.
B01329921-P2
02/13/2026
Filed — Alteration
RENOVATION OF EXISTING 1 FAMILY DWELLING 2-STORY BUILDING WITH CELLAR AND WITH GENERAL CONSTRUCTION WORK AS PER PLANS FILED HEREWITH.
B01329921-P1
02/13/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAZAL BANGASH
02/13/2026
Special inspection requirement — Final
FAZAL BANGASH
02/13/2026
Special inspection requirement — Fire-Resistance Rated Construction
FAZAL BANGASH
02/13/2026
Special inspection requirement — Fenestration areas
FAZAL BANGASH
02/13/2026
Special inspection requirement — Fenestration air leakage
FAZAL BANGASH
02/13/2026
Special inspection requirement — Insulation placement and R values
FAZAL BANGASH
02/13/2026
Special inspection requirement — Interior lighting power
FAZAL BANGASH
02/13/2026
Special inspection requirement — Air barrier - visual inspection
FAZAL BANGASH
02/13/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
FAZAL BANGASH
02/13/2026
Special inspection requirement — Energy Code Compliance Inspections
FAZAL BANGASH
02/05/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Chih Hsu
12/12/2025
Permit issued — General Construction
B01329921-I1-GC
12/11/2025
Permit issued — Plumbing
B01329921-S1-PL
12/09/2025
Filed — Alteration
RENOVATION OF EXISTING 1 FAMILY DWELLING 2-STORY BUILDING WITH CELLAR AND WITH GENERAL CONSTRUCTION WORK AS PER PLANS FILED HEREWITH.
B01329921-I1
12/09/2025
Filed — Alteration
RENOVATION OF EXISTING 1 FAMILY DWELLING 2-STORY BUILDING WITH CELLAR AND WITH GENERAL CONSTRUCTION WORK AS PER PLANS FILED HEREWITH.
B01329921-S1
12/13/2011
Violation issued (ECB, closed)
Construction
05/10/2006
Violation issued (ECB, closed)
Construction
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/05/2025$1.2M—— → —$748/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BANGASH ASSOCIATES INC.402/13/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NYC BUILDING CONSULTANTS403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LT PRO CONSTRUCTION INCGeneral Contractor104/09/2026
AMERICAN STANDARD P&H CORORP.Plumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BANGASH ASSOCIATES INC8488202/13/2026
LT INSPECTIONS INC9795202/13/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedLT PRO CONSTRUCTION INC12/12/2025
DOB NOWPlumbingPermit IssuedAMERICAN STANDARD P&H CORORP.12/11/2025
BISOTISSUEDLONG & DELOSA CONST GROUP LTD03/31/2007
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
02/26/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/26/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/26/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
02/17/2026Fire-Resistant Penetrations and JointsFAZAL BANGASHspecial
02/17/2026Fire-Resistance Rated ConstructionFAZAL BANGASHprogress
02/17/2026Energy Code Compliance InspectionsFAZAL BANGASHprogress
02/17/2026FinalFAZAL BANGASHprogress
02/17/2026Interior lighting powerFAZAL BANGASHenergy_progress
02/17/2026Fenestration and door U-factor and product ratingsFAZAL BANGASHenergy_progress
02/17/2026Fenestration air leakageFAZAL BANGASHenergy_progress
02/17/2026Air barrier - visual inspectionFAZAL BANGASHenergy_progress
02/17/2026Fenestration areasFAZAL BANGASHenergy_progress
02/17/2026Insulation placement and R valuesFAZAL BANGASHenergy_progress
02/17/2026Fire-Resistant Penetrations and JointsChih Hsuspecial
02/13/2026Fire-Resistant Penetrations and JointsFAZAL BANGASHspecial
02/13/2026FinalFAZAL BANGASHprogress
02/13/2026Fire-Resistance Rated ConstructionFAZAL BANGASHprogress
02/13/2026Fenestration areasFAZAL BANGASHenergy_progress
02/13/2026Fenestration air leakageFAZAL BANGASHenergy_progress
02/13/2026Insulation placement and R valuesFAZAL BANGASHenergy_progress
02/13/2026Interior lighting powerFAZAL BANGASHenergy_progress
02/13/2026Air barrier - visual inspectionFAZAL BANGASHenergy_progress
02/13/2026Fenestration and door U-factor and product ratingsFAZAL BANGASHenergy_progress
02/13/2026Energy Code Compliance InspectionsFAZAL BANGASHprogress
02/05/2026Fire-Resistant Penetrations and JointsChih Hsuspecial
▾Documents — 20 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/19/2026B01329921-S1Request digital key ↗
08/19/2026B01329921-I1Request digital key ↗
08/19/2026B01329921-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications12
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/19/2026B01329921-S1Open ↗
08/19/2026B01329921-I1Open ↗
08/19/2026B01329921-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/27/2026B01329921-I1Open ↗
08/27/2026B01329921-I1Open ↗
08/25/2026B01329921-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026B01329921-S1Open ↗
08/27/2026B01329921-I1Open ↗
08/25/2026B01329921-P2Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/19/2026B01329921-I1Open ↗
08/19/2026B01329921-S1Open ↗
08/19/2026B01329921-P1Open ↗
Showing 3 of 4 on file for this type