893 SARATOGA AVENUE
BROOKLYN · BIN 3082216
💬 Discuss this project
1930Year Built
2Stories
C3Building Class
R6Zoning
3,198 sfGross Floor Area
4Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Four families · Owner of record: 893 SARATOGA LLC · 2,500 sf lot · 1.28 FAR built · Flood zone X
Locations of Work
ArchitectureFire Protection
Floor 245p · 1 filing · 20 docs
Floor 145p · 1 filing · 20 docs
Basement47p · 1 filing · 20 docs
1 job · most recent 09/04/2025
Associated Ducts and Piping Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
09/04/2025Signed-offAB CONTRACTING USA INCAssociated Ducts and Piping, Ventilation Systems
Ventilation
Greenheck SP-LP0511 100 CFM · Exhaust Fan ×22
SQ-97-VG 70 CFM · Exhaust Fan ×1
Ducts & Piping
Greenheck ducts 10 kW ×2
1 job · most recent 09/04/2025
Sprinkler System
FiledStatusContractorScope
09/04/2025Signed-offTARGET PIPING NY LLCSprinkler System
1 job · most recent 09/04/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
09/04/2025Signed-offTARGET PIPING NY LLCGas, Storm, Water/Sanitary
1 job · most recent 04/28/2025
General Wiring
FiledStatusContractorScope
04/28/2025CompleteS&R ELECTRICAL & MECHANICGeneral Wiring
1 job · most recent 09/04/2025
Fence
FiledStatusContractorScope
09/04/2025Signed-offAB CONTRACTING USA INCFence
Building Lifecycle
All (120)Filed (12)Permit Issued (9)Signed Off (6)Violation (41)Inspection (10)Objection (12)Special Inspection (30)
10/16/2025
Signed off — Alteration CO
Filing boiler application subsequent to primary approved application B00836314-I1
B00836314-S4
10/16/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/03/2025
Special inspection requirement — Maintenance information
Younes Abouyaala
10/03/2025
Special inspection requirement — Fenestration air leakage
Younes Abouyaala
10/03/2025
Special inspection requirement — Metering
Younes Abouyaala
10/03/2025
Special inspection requirement — Permanent certificate
Younes Abouyaala
10/03/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Younes Abouyaala
10/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
10/03/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Younes Abouyaala
10/03/2025
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
10/03/2025
Special inspection requirement — Fire-Resistance Rated Construction
Younes Abouyaala
10/03/2025
Special inspection requirement — Interior lighting power
Younes Abouyaala
10/03/2025
Special inspection requirement — Fenestration areas
Younes Abouyaala
10/03/2025
Special inspection requirement — Air barrier - visual inspection
Younes Abouyaala
09/29/2025
Objection resolved — Addressed
09/25/2025
Signed off — Alteration CO
Filing boiler application subsequent to primary approved application B00836314-I1
B00836314-S2
09/18/2025
Objection resolved — Addressed
09/17/2025
Objection raised — Other
09/17/2025
Objection raised — Other
09/16/2025
Signed off — Alteration CO
Filing boiler application subsequent to primary approved application B00836314-I1
B00836314-S3
09/04/2025
Filed — Alteration CO
Filing boiler application subsequent to primary approved application B00836314-I1
B00836314-P6
09/02/2025
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
09/02/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/02/2025
Inspection — Pass-Final SP - Up to 9 Requested Floors
Pass
View inspection ↗
08/22/2025
Signed off — Alteration
Proposed interior demolition of non-bearing walls, in preparation for proposed construction alteration filed under B00836314-I1. No change to use, occupancy use, and egress.
B00978812-I1
08/21/2025
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
08/21/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
08/20/2025
Signed off — Alteration CO
Filing boiler application subsequent to primary approved application B00836314-I1
B00836314-S1
08/20/2025
Signed off — Alteration CO
Filing boiler application subsequent to primary approved application B00836314-I1
B00836314-S5
08/19/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/19/2025
Special inspection requirement — Sprinkler Systems
Younes Abouyaala
08/19/2025
Special inspection requirement — Post-installed Anchors
Younes Abouyaala
08/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
08/18/2025
Permit issued — Mechanical Systems
B00836314-S1-MS
08/08/2025
Permit issued — General Construction
B00836314-I1-GC
08/05/2025
Filed — Alteration CO
Filing boiler application subsequent to primary approved application B00836314-I1
B00836314-P5
08/01/2025
Special inspection requirement — Post-installed Anchors
Younes Abouyaala
08/01/2025
Special inspection requirement — Sprinkler Systems
Younes Abouyaala
08/01/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
07/29/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
07/22/2025
Filed — Alteration CO
Filing boiler application subsequent to primary approved application B00836314-I1
B00836314-P3
07/17/2025
Special inspection requirement — Post-installed Anchors
Younes Abouyaala
07/17/2025
Special inspection requirement — Sprinkler Systems
Younes Abouyaala
07/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
07/16/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/16/2025
Special inspection requirement — HVAC-R and service water heating equipment
Younes Abouyaala
07/16/2025
Special inspection requirement — HVAC-R and service water heating system controls
Younes Abouyaala
07/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
07/16/2025
Special inspection requirement — Maintenance information
Younes Abouyaala
07/16/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Younes Abouyaala
07/02/2025
Filed — Alteration CO
Filing boiler application subsequent to primary approved application B00836314-I1
B00836314-P2
06/26/2025
Special inspection requirement — HVAC-R and service water heating equipment
Younes Abouyaala
06/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
06/26/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Younes Abouyaala
06/26/2025
Special inspection requirement — Maintenance information
Younes Abouyaala
06/10/2025
Violation issued (HPD, closed)
A
05/14/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/30/2025
Permit issued — Boiler Equipment
B00836314-S4-BE
04/30/2025
Permit issued — Sprinklers
B00836314-S3-EW-SP
04/29/2025
Permit issued — Plumbing
B00836314-S2-PL
Latest 60 of 120 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
AB CONTRACTING USA103/22/2026
893 SARATOGA LLC103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/24/2023$750K—Private party → 893 SARATOGA LLC$235/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LEANDRO NILS DICKSON ARCHITECT, LLC409/04/2025
ALL CITY ENGINEERING, P.C.708/05/2025
KNF SERVICES CROP112/26/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NYC DESIGN FILE1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AB CONTRACTING USA INCGeneral Contractor707/08/2026
B&B MECH PLBG & HTG LLCPlumbing207/08/2026
TARGET PIPING NY LLCFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION15191009/04/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offAB CONTRACTING USA08/18/2025
DOB NOWGeneral ConstructionPermit IssuedAB CONTRACTING USA08/08/2025
DOB NOWBoiler EquipmentSigned-offTARGET PIPING NY LLC04/30/2025
DOB NOWSprinklersSigned-offTARGET PIPING NY LLC04/30/2025
DOB NOWPlumbingSigned-offTARGET PIPING NY LLC04/29/2025
DOB NOWConstruction FenceSigned-offAB CONTRACTING USA12/13/2024
DOB NOWGeneral ConstructionSigned-offAB CONTRACTING USA12/05/2024
DOB NOWConstruction FenceSigned-offAB CONTRACTING USA01/11/2024
DOB NOWGeneral ConstructionSigned-offAB CONTRACTING USA12/29/2023
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
10/16/2025Pass-Final CND-Occupancy InspectionPassView ↗
09/02/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
09/02/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/02/2025Pass-Final SP - Up to 9 Requested FloorsPassView ↗
08/21/2025Fail-Final CND-Occupancy InspectionFailView ↗
08/21/2025Pass-Final General Construction Non-Directive 14PassView ↗
08/19/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/29/2025Pass-Final Boiler Equipment InspectionPassView ↗
07/16/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/14/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 49
DateRequirementInspectorRole
10/03/2025Maintenance informationYounes Abouyaalaenergy_progress
10/03/2025Fenestration air leakageYounes Abouyaalaenergy_progress
10/03/2025MeteringYounes Abouyaalaenergy_progress
10/03/2025Permanent certificateYounes Abouyaalaenergy_progress
10/03/2025Fenestration and door U-factor and product ratingsYounes Abouyaalaenergy_progress
10/03/2025Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
10/03/2025Excavations - Sheeting, Shoring, and BracingYounes Abouyaalaspecial
10/03/2025Energy Code Compliance InspectionsYounes Abouyaalaprogress
10/03/2025Fire-Resistance Rated ConstructionYounes Abouyaalaprogress
10/03/2025Interior lighting powerYounes Abouyaalaenergy_progress
10/03/2025Fenestration areasYounes Abouyaalaenergy_progress
10/03/2025Air barrier - visual inspectionYounes Abouyaalaenergy_progress
08/19/2025Sprinkler SystemsYounes Abouyaalaspecial
08/19/2025Post-installed AnchorsYounes Abouyaalaspecial
08/19/2025Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
08/01/2025Post-installed AnchorsYounes Abouyaalaspecial
08/01/2025Sprinkler SystemsYounes Abouyaalaspecial
08/01/2025Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
07/17/2025Post-installed AnchorsYounes Abouyaalaspecial
07/17/2025Sprinkler SystemsYounes Abouyaalaspecial
07/17/2025Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
07/16/2025HVAC-R and service water heating equipmentYounes Abouyaalaenergy_progress
07/16/2025HVAC-R and service water heating system controlsYounes Abouyaalaenergy_progress
07/16/2025Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
07/16/2025Maintenance informationYounes Abouyaalaenergy_progress
Latest 25 of 49.
▾Documents — 67 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch12
08/26/2026B00978812-I1Request digital key ↗
08/21/2026B00836314-S1Request digital key ↗
08/21/2026B00836314-S4Request digital key ↗
Showing 3 of 12 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZoning Exhibit form (1-5)3
08/13/2026B00836314-P1Open ↗
08/13/2026B00836314-I1Open ↗
08/13/2026B00836314-P6Open ↗
▸Seals & Professional Certifications30
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/21/2026B00836314-S4Open ↗
08/21/2026B00836314-P1Open ↗
08/21/2026B00836314-S3Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/23/2026B00836314-S4Open ↗
09/02/2026B00836314-I1Open ↗
09/02/2026B00836314-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/23/2026B00836314-S4Open ↗
09/02/2026B00836314-I1Open ↗
09/01/2026B00836314-P5Open ↗
Showing 3 of 9 on file for this type
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist3
08/13/2026B00836314-I1Open ↗
08/13/2026B00836314-P1Open ↗
08/13/2026B00836314-P6Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026B00836314-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00836314-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026B00836314-I1Open ↗
▸Environmental & Asbestos12
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
08/21/2026B00836314-S3Open ↗
08/21/2026B00836314-S2Open ↗
08/21/2026B00836314-S1Open ↗
Showing 3 of 12 on file for this type
▸Other Documents4
▸DOB NOWProperty Ownership Certification3
08/21/2026B00836314-I1Open ↗
08/21/2026B00836314-P6Open ↗
08/15/2026B00836314-P1Open ↗
▸DOB NOWFinal Survey1
08/13/2026B00836314-I1Open ↗