← Back
Primarily 3 family with 1 store or office
895 BROADWAY
BROOKLYN · BIN 3071783
💬 Discuss this project
1931Year Built
4Stories
S3Building Class
R6Zoning
6,940 sfGross Floor Area
4Units
Rent Stabilized7 Open Violations ▸FDNY Report ↗
Primarily 3 family with 1 store or office · Owner of record: PENN-HILL RLTY CORP · 2,110 sf lot · 3.29 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DOUGLAS ELLIMAN PROPERTY MANAGEMENT403/22/2026
PENN HILL REALTY903/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JASON SCHUBERT111/10/2023
SOHAIL HUMAYUN P E INC405/31/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JACK JAFFA & ASSOCIATES103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
WYNNE PLBG & HEATING CORPPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ASE ENGINEERING PLLC5785111/10/2023
SOHAIL HUMAYUN P E INC8457405/31/2023
Building Lifecycle
All (42)Filed (5)Permit Issued (2)Signed Off (1)Violation (19)Inspection (7)Special Inspection (8)
02/05/2025
Violation issued (HPD, open)
B
02/05/2025
Violation issued (HPD, open)
B
02/05/2025
Violation issued (HPD, closed)
C
02/05/2025
Violation issued (HPD, open)
C
02/05/2025
Violation issued (HPD, open)
A
02/05/2025
Violation issued (HPD, closed)
A
02/05/2025
Violation issued (HPD, open)
B
02/05/2025
Violation issued (HPD, open)
B
11/25/2024
Violation issued (HPD, closed)
I
04/09/2024
Violation issued (HPD, closed)
A
01/29/2024
Signed off — Alteration
B00953878-I1
01/04/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
12/18/2023
Inspection — No Access-Final Boiler Equipment Inspection
No Access
View inspection ↗
12/11/2023
Permit issued — Boiler Equipment
B00953878-I1-BE
11/10/2023
Filed — Alteration
B00953878-I1
06/01/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
SOHAIL HUMAYUN
06/01/2023
Special inspection requirement — Energy Code Compliance Inspections
SOHAIL HUMAYUN
05/31/2023
Filed — Alteration
APPLICATION FILED TO INSTALL NEW GAS COOKING EQUIPMENTS AND PLUMBING FIXTURES AT 1ST FLOOR COMMERCIAL SPACE. NO CHANGE TO USE, EGRESS, OR OCCUPANCY
B08046268-P2
05/31/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
SOHAIL HUMAYUN
05/31/2023
Special inspection requirement — Energy Code Compliance Inspections
SOHAIL HUMAYUN
05/17/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
05/12/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
05/09/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/31/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/31/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/21/2023
Violation issued (HPD, closed)
A
02/28/2023
Permit issued — Plumbing
B08046268-S1-PL
02/08/2023
Filed — Alteration
APPLICATION FILED TO INSTALL NEW GAS COOKING EQUIPMENTS AND PLUMBING FIXTURES AT 1ST FLOOR COMMERCIAL SPACE. NO CHANGE TO USE, EGRESS, OR OCCUPANCY
B08046268-P1
02/05/2023
Special inspection requirement — Energy Code Compliance Inspections
SOHAIL HUMAYUN
02/05/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
SOHAIL HUMAYUN
12/04/2022
Filed — Alteration
APPLICATION FILED TO INSTALL NEW GAS COOKING EQUIPMENTS AND PLUMBING FIXTURES AT 1ST FLOOR COMMERCIAL SPACE. NO CHANGE TO USE, EGRESS, OR OCCUPANCY
B08046268-S1
11/30/2022
Filed — Alteration
APPLICATION FILED TO INSTALL NEW GAS COOKING EQUIPMENTS AND PLUMBING FIXTURES AT 1ST FLOOR COMMERCIAL SPACE. NO CHANGE TO USE, EGRESS, OR OCCUPANCY
B08046268-I1
11/28/2022
Special inspection requirement — Mechanical Systems
SOHAIL HUMAYUN
11/28/2022
Special inspection requirement — Final
SOHAIL HUMAYUN
02/23/2022
Violation issued (HPD, closed)
A
10/16/2018
Violation issued (HPD, closed)
I
10/23/1998
Violation issued (HPD, open)
B
05/25/1994
Violation issued (ECB, closed)
Construction
09/17/1993
Violation issued (FDNY_NOV, closed)
08/25/1993
Violation issued (ECB, closed)
Construction
08/25/1993
Violation issued (ECB, closed)
Construction
05/21/1993
Violation issued (FDNY_NOV, closed)
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offWYNNE PLBG & HEATING CORP12/11/2023
DOB NOWPlumbingSigned-offWYNNE PLBG & HEATING CORP02/28/2023
BIS—ISSUEDNATALE BORRIELLO CONSTRUC05/14/2018
BISPLISSUEDKATAN P & H INC05/07/2018
BISPLISSUEDRRP PLUMBING CORP10/20/2017
BISPLISSUEDTRI STATE PLBG & HTG INC06/19/2017
BISPLISSUEDKATAN P & H INC04/28/2017
BIS—ISSUEDNATALE BORRIELLO CONSTRUC04/27/2017
BISEQISSUEDJERRICK ASSOCIATES INC10/12/2016
1 project · most recent 05/31/2023
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
05/31/2023——Ventilation Systems
Ventilation
Captiveaire NCA 18FA 5,000 CFM · Kitchen Exhaust ×1
1 project · most recent 05/31/2023
Gas Water/Sanitary
FiledStatusContractorScope
05/31/2023Signed-offWYNNE PLBG & HEATING CORPGas, Water/Sanitary
1 project · most recent 05/08/2018
General Wiring
FiledStatusContractorScope
05/08/2018CompleteRAL-BAR ELECTRIC INC.General Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
01/04/2024Pass-Final Boiler Equipment InspectionPassView ↗
12/18/2023No Access-Final Boiler Equipment InspectionNo AccessView ↗
05/17/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
05/12/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
05/09/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/31/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/31/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
06/01/2023Fire-Resistant Penetrations and JointsSOHAIL HUMAYUNspecial
06/01/2023Energy Code Compliance InspectionsSOHAIL HUMAYUNprogress
05/31/2023Fire-Resistant Penetrations and JointsSOHAIL HUMAYUNspecial
05/31/2023Energy Code Compliance InspectionsSOHAIL HUMAYUNprogress
02/05/2023Energy Code Compliance InspectionsSOHAIL HUMAYUNprogress
02/05/2023Fire-Resistant Penetrations and JointsSOHAIL HUMAYUNspecial
11/28/2022Mechanical SystemsSOHAIL HUMAYUNspecial
11/28/2022FinalSOHAIL HUMAYUNprogress
▾Documents — 155 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/27/2026B08046268-S1Request digital key ↗
08/27/2026B08046268-I1Request digital key ↗
08/27/2026B08046268-P2Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits42
▸BISPLAN / WORK APPROVAL APPLICATION20
09/25/2018321450504Open ↗
09/25/2018321450504Open ↗
07/31/2018321450504Open ↗
Showing 3 of 20 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION13
09/18/2018321450504Open ↗
09/17/2018321450504Open ↗
07/13/2018321450504Open ↗
Showing 3 of 13 on file for this type
▸BISWORK PERMIT APPLICATION7
05/14/2018321450504Open ↗
05/07/2018321450504Open ↗
11/13/2017321450504Open ↗
Showing 3 of 7 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION2
06/27/2018321450504Open ↗
05/04/2017321450504Open ↗
▸Zoning, Tax Lot & Property Records1
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
01/24/2017321450504Open ↗
▸Seals & Professional Certifications25
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
06/15/2018321450504Open ↗
06/15/2018321450504Open ↗
05/11/2018340430607Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/27/2026B08046268-S1Open ↗
08/27/2026B08046268-I1Open ↗
08/27/2026B08046268-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/19/2026B08046268-S1Open ↗
08/26/2026B08046268-P1Open ↗
08/24/2026B08046268-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/19/2026B08046268-S1Open ↗
08/26/2026B08046268-P1Open ↗
08/24/2026B08046268-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
01/26/2018321450504Open ↗
01/24/2017321450504Open ↗
▸BISProfessional and Owner Certification (POC3)2
01/24/2017321450504Open ↗
01/24/2017321450504Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
10/07/2016340430607Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
10/07/2016340430607Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
10/07/2016340430607Open ↗
▸Trade Schedules & Equipment13
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE10
09/25/2018321450504Open ↗
07/02/2018321450504Open ↗
01/26/2018321450504Open ↗
Showing 3 of 10 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT2
10/23/2018321450504Open ↗
10/23/2018321450504Open ↗
▸BISEQUIPMENT USE PERMITS1
10/23/2018321450504Open ↗
▸Safety & Tenant Protection3
▸BISTENANT PROTECTION PLAN AND NOTES2
10/07/2016340430607Open ↗
01/24/2017321450504Open ↗
▸BISSTREET TREE CHECKLIST1
01/24/2017321450504Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/27/2026B08046268-I1Open ↗
08/27/2026B08046268-P2Open ↗
08/27/2026B08046268-P1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
01/24/2017321450504Open ↗
04/07/2015321112005Open ↗
04/07/2015321112005Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
06/28/2018321450504Open ↗
06/28/2018321450504Open ↗
01/24/2017321450504Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS1
06/28/2018321450504Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
10/07/2016340430607Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY1
10/07/2016340430607Open ↗
▸BISDEP Hydrant Flow Test Letter1
04/10/2017321450504Open ↗
▸Approvals, Objections & Sign-offs11
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST6
02/13/2019321450504Open ↗
11/08/2018321450504Open ↗
10/24/2018321450504Open ↗
Showing 3 of 6 on file for this type
▸BISSUPERSEDING LETTER3
05/07/2018321450504Open ↗
10/24/2017321450504Open ↗
06/21/2017321450504Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE2
04/10/2017321450504Open ↗
01/24/2017321450504Open ↗
▸Cost, Insurance & Ownership7
▸BISCOST AFFIDAVIT7
06/28/2018321450504Open ↗
06/28/2018321450504Open ↗
03/29/2018321450504Open ↗
Showing 3 of 7 on file for this type
▸Filing & Intake Forms31
▸BISADDITIONAL INFORMATION17
09/25/2018321450504Open ↗
09/25/2018321450504Open ↗
07/31/2018321450504Open ↗
Showing 3 of 17 on file for this type
▸BISBOROUGH INTAKE FORM10
02/13/2019321450504Open ↗
11/08/2018321450504Open ↗
07/31/2018321450504Open ↗
Showing 3 of 10 on file for this type
▸BISEFILING COVER SHEET3
01/24/2017321450504Open ↗
01/24/2017321450504Open ↗
04/07/2015321112005Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
10/07/2016340430607Open ↗
▸Other Documents1
▸BISPLOT DIAGRAM1
01/24/2017321450504Open ↗