895 WEST END AVENUE
MANHATTAN · BIN 1057198
💬 Discuss this project
1912Year Built
12Stories
D4Building Class
R8Zoning
93,759 sfGross Floor Area
47Units
LL97 CoveredRent Stabilized0 Active ViolationsFISP: SWARMP
Elevator cooperative · Owner of record: 895 West End Avenue Owners · 10,000 sf lot · 9.38 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projects895 West End Avenue Cooperative Corp.3 filings
RoofInstall mini split system with ductworkUnder Construction7p · 11 filings · 20 docs
Floor 12Unit 12D3 filings · 12 docs
Floor 11Unit 11A1 filing · 5 docs
Floor 10Unit 10AUnder Construction6p · 1 filing · 12 docs
Floor 9Unit 9A1 filing · 9 docs
Floor 8Unit 8A1 filing · 13 docs
Floor 7
Floor 6Unit 6A, Unit 6C10p · 4 filings · 20 docs
Floor 5Unit 5B1p · 1 filing · 10 docs
Floor 4
Floor 3Unit 3AUnder Construction3p · 2 filings · 11 docs
Floor 2Unit 2A1 filing · 8 docs
Floor 1
CellarMidboro Management INC1p · 1 filing · 20 docs
Site & exteriorExterior restoration2 filings · 15 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
895 West End Ave Coop4303/21/2026
895 West End Avenue1203/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Idm Associates403/21/2026
Rand Engineering & Arch1003/21/2026
Municipal Building Consultants103/21/2026
Richard Swanson103/21/2026
Agouti Construction Consulting403/21/2026
J.A.M. Associates1003/21/2026
Dynamic Building Consultants203/21/2026
JMV Associates603/21/2026
Superstructures Engineering +203/21/2026
Perotto Group403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
All Makes Heating A Cspecialty_contractor1309/18/2026
Marek K ContractingGeneral Contractor1103/21/2026
LemxGeneral Contractor1007/08/2026
LemxScaffold603/21/2026
BrookvilleGeneral Contractor407/10/2026
R.J.C. MechanicalPlumbing307/14/2026
J.G.C. ElectricElectrical303/22/2026
Jodom MechanicalPlumbing207/08/2026
Central Construction Managementspecialty_contractor203/21/2026
Wolf InstallationGeneral Contractor103/21/2026
Carreras Home ImprovementsPlumbing103/21/2026
H Z Plumbing & HeatingPlumbing103/21/2026
JL PlumbingPlumbing103/21/2026
A & S Master ElectricalElectrical103/22/2026
Peter Miceli PlumbingPlumbing103/21/2026
Practical Plumbing & HeatingPlumbing103/21/2026
PSI MechanicalPlumbing103/21/2026
Triple Crown Plumbing & HeatingPlumbing103/21/2026
Z W Plumbing & HeatingPlumbing103/21/2026
Atlas Design Contractorspecialty_contractor107/08/2026
KRS Renovationspecialty_contractor107/08/2026
Wulfing Constructionspecialty_contractor103/21/2026
Monarch MechanicalPlumbing103/21/2026
Empower Electric ServicesElectrical103/22/2026
Gsa ElectricElectrical103/22/2026
Atlas Design ContractorGeneral Contractor103/21/2026
J.R. Fordham Paintingspecialty_contractor107/08/2026
Kitchenfactory ComGeneral Contractor103/21/2026
SGC ContractingGeneral Contractor103/21/2026
All Makes Heating & A/CGeneral Contractor107/18/2019
Amd & AssociatesPlumbing110/06/2010
Amd & .AssociatesPlumbing208/23/2016
Anchor PlumbingPlumbing112/15/2004
Central Construction ManagementGeneral Contractor207/17/2020
DJM NYCGeneral Contractor210/30/2020
Dream RemodelingGeneral Contractor206/27/2019
Everest ScaffoldingGeneral Contractor807/08/2015
Gallery RestorationGeneral Contractor207/18/2017
Ganic Plumbing & HeatingPlumbing106/08/2023
Hamilton Air CompanyGeneral Contractor109/07/2016
Henry Myers Plumbing & HeatingPlumbing106/16/2008
Hydro MechanicalPlumbing107/16/2014
Lee CostrGeneral Contractor111/30/2004
Palone Brothers Air CondiGeneral Contractor108/02/2017
Patrick ConlonGeneral Contractor107/25/2016
Peter Dinatale & AssociatesGeneral Contractor612/30/2014
Skyline RestorationGeneral Contractor109/15/1997
Spring ScaffoldingGeneral Contractor112/15/1997
Superb Plumbing & HeatingPlumbing105/21/2019
UC DesignGeneral Contractor103/26/2019
VGC NYCGeneral Contractor106/09/2008
Viles ContractingGeneral Contractor405/14/2013
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Jon Libasci3068109/08/2026
Metric Consulting1803308/01/2026
Amhac4867609/21/2023
Richmond Testing Lab263209/30/2022
Superstructures Engineering374209/30/2022
Rand Engineering266306/24/2022
Gregory V. Perotto, P.E.947208/09/2021
Charles G Michel Engineering2871303/18/2021
Building Lifecycle
02/20/2028
Facade inspection report due (FISP Cycle 9, sub-cycle B)
The filing window opened 02/21/2026. No Cycle 9 filing on record yet
09/17/2026
Permit issued — Mechanical Systems
M01451267-I1-MS
09/08/2026
Filed — Alteration
Respectfully request to install mini spilt system with associated ductwork. No change in use, egress, or occupancy.
M01451267-I1
08/25/2026
Special inspection requirement — Final
RAYMOND NERENBERG
08/25/2026
Special inspection requirement — Mechanical Systems
jon libasci
242 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedAll Makes Heating & A/C09/17/2026
DOB NOWSuspended ScaffoldPermit IssuedCentral Construction Management07/20/2026
DOB NOWPlumbingPermit IssuedR.J.C. Mechanical07/13/2026
DOB NOWGeneral ConstructionPermit IssuedBrookville07/09/2026
DOB NOWMechanical SystemsSigned-offAll Makes Heating & A/C11/13/2023
DOB NOWGeneral ConstructionSigned-offJ.R. Fordham Painting10/16/2023
DOB NOWGeneral ConstructionPermit IssuedLemx10/03/2023
DOB NOWStructuralPermit IssuedLemx10/02/2023
DOB NOWSidewalk ShedSigned-offLemx06/14/2023
DOB NOWMechanical SystemsSigned-offAll Makes Heating & A/C06/01/2023
DOB NOWMechanical SystemsSigned-offAll Makes Heating & A/C04/14/2023
DOB NOWGeneral ConstructionSigned-offBrookville10/25/2022
DOB NOWPlumbingSigned-offR.J.C. Mechanical10/11/2022
DOB NOWStructuralPermit IssuedLemx10/04/2022
DOB NOWStructuralPermit IssuedLemx10/04/2022
DOB NOWPlumbingSigned-offJodom Mechanical09/01/2022
DOB NOWMechanical SystemsSigned-offWulfing Construction08/22/2022
DOB NOWSidewalk ShedSigned-offLemx06/17/2022
DOB NOWMechanical SystemsSigned-offAll Makes Heating & A/C06/16/2022
DOB NOWMechanical SystemsPermit IssuedAll Makes Heating & A/C02/01/2022
DOB NOWMechanical SystemsPermit IssuedAtlas Design Contractor01/21/2022
DOB NOWGeneral ConstructionSigned-offBrookville10/18/2021
DOB NOWMechanical SystemsSigned-offAll Makes Heating & A/C07/23/2021
DOB NOWGeneral ConstructionSigned-offBrookville07/22/2021
DOB NOWPlumbingSigned-offR.J.C. Mechanical07/20/2021
DOB NOWPlumbingSigned-offJodom Mechanical04/23/2021
DOB NOWMechanical SystemsPermit IssuedAll Makes Heating & A/C04/16/2021
DOB NOWMechanical SystemsSigned-offAll Makes Heating & A/C04/16/2021
DOB NOWMechanical SystemsSigned-offAll Makes Heating & A/C04/13/2021
DOB NOWMechanical SystemsSigned-offCentral Construction Management04/05/2021
DOB NOWBoiler EquipmentSigned-offEast Coast Petroleum03/10/2021
DOB NOWMechanical SystemsSigned-offKRS Renovation10/28/2020
BISPLISSUEDGanic Plumbing & Heating06/08/2023
BISEQISSUEDLemx06/02/2023
BISEQISSUEDLemx06/18/2022
BISOTISSUEDAtlas & Design Contractors04/27/2021
BISOTISSUEDDJM NYC10/30/2020
BISOTISSUEDDJM NYC10/30/2020
BISOTISSUEDCentral Construction Management07/17/2020
BISOTISSUEDCentral Construction Management11/12/2019
+ 42 more permits on file
2 projects · most recent 09/08/2026
Air Conditioning Systems Heating and Air Conditioning Systems
FiledStatusContractorScope
09/08/2026Permit IssuedAll Makes Heating & A/CAir Conditioning Systems
08/01/2026Permit IssuedBrookvilleHeating and Air Conditioning Systems
1 project · most recent 08/01/2026
Gas Water/Sanitary
FiledStatusContractorScope
08/01/2026Permit IssuedR.J.C. MechanicalGas, Water/Sanitary
22 projects · most recent 07/16/2026
General Wiring HVAC Wiring
FiledStatusContractorScope
07/16/2026Permit IssuedA & S Master ElectricalGeneral Wiring
07/15/2026Permit IssuedA&E Electrical SystemsGeneral Wiring
04/08/2024CompleteJ.G.C. ElectricGeneral Wiring
08/22/2023CompleteA & S Master ElectricalGeneral Wiring
08/04/2023Permit IssuedJoseph Weinstein ElectricGeneral Wiring
03/14/2023Permit IssuedJ.G.C. ElectricGeneral Wiring
01/31/2023CompleteJ.G.C. Electric—
01/29/2023Permit IssuedEmpower Electric ServicesGeneral Wiring
09/11/2022CompleteA & S Master Electrical—
06/10/2022CompleteElpo Electrical Contg—
05/09/2022CompleteJ.G.C. ElectricGeneral Wiring
02/10/2022CompleteMLS ElectricGeneral Wiring
02/05/2022Permit IssuedJ.G.C. ElectricHVAC Wiring
07/27/2021CompleteA & S Master ElectricalGeneral Wiring
06/30/2021CompleteJ.G.C. ElectricGeneral Wiring
1 project · most recent 09/30/2022
FiledStatusContractorScope
09/30/2022Permit IssuedLemx—
1 project · most recent 07/07/2026
FiledStatusContractorScope
07/07/2026Permit IssuedCentral Construction Management—
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
04/17/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/14/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
02/14/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
03/01/2022Pass-Final PL - Up to 9 Requested FloorsPassView ↗
12/17/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 57
DateRequirementInspectorRole
08/25/2026FinalRAYMOND NERENBERGprogress
08/25/2026Mechanical Systemsjon libascispecial
07/17/2023Energy Code Compliance InspectionsMichael Schmittprogress
07/06/2023Lighting controlsMichael Schmittenergy_progress
07/06/2023Lighting in dwelling unitsMichael Schmittenergy_progress
07/06/2023FinalMichael Schmittprogress
05/09/2023HVAC-R and service water piping design and insulationRAYMOND NERENBERGenergy_progress
05/09/2023Energy Code Compliance InspectionsRAYMOND NERENBERGprogress
05/09/2023Fire-Resistant Penetrations and JointsRAYMOND NERENBERGspecial
05/09/2023HVAC-R and service water heating equipmentRAYMOND NERENBERGenergy_progress
05/09/2023HVAC-R and service water heating system controlsRAYMOND NERENBERGenergy_progress
03/29/2023Mechanical SystemsRAYMOND NERENBERGspecial
03/29/2023FinalRAYMOND NERENBERGprogress
02/20/2023FinalRAYMOND NERENBERGprogress
02/20/2023Mechanical SystemsRAYMOND NERENBERGspecial
05/19/2022Energy Code Compliance InspectionsRaymond Lociceroprogress
01/04/2022Fire-Resistant Penetrations and JointsPeter Varsalonaspecial
01/04/2022FinalRaymond Lociceroprogress
01/04/2022Mechanical SystemsPeter Varsalonaspecial
08/09/2021HVAC-R and service water heating system controlsGregory Perottoenergy_progress
08/09/2021Maintenance informationGregory Perottoenergy_progress
08/09/2021Fire-Resistant Penetrations and JointsGregory Perottospecial
08/09/2021Fuel-Oil Storage and Fuel-Oil Piping SystemsGregory Perottospecial
08/09/2021Lowest Floor ElevationGregory Perottoprogress
08/09/2021HVAC-R and service water heating equipmentGregory Perottoenergy_progress
Latest 25 of 57.
730 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account