← Back
BuildNYC
Miscellaneous educational facility
John Jay College
899 10TH AVENUE · BIN 1027085
💬 Discuss this project
1920Year Built
6Stories
W9Building Class
C6-2Zoning
360,000 sfGross Floor Area
4Units
LL97 Covered7 Active Violations 1 unresolved · 6 paperwork only 2 likely answered 2 old, status unconfirmed ▸FISP: UNSAFE
Miscellaneous educational facility · Owner of record: Dormitory Authority State of New York · 60,249 sf lot · 5.98 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofJohn Jay College Haaren HallUnder Construction14p · 5 filings · 17 docs
Floor 6John Jay College Haaren Hall11p · 3 filings · 17 docs
Floor 5John Jay College Haaren Hall2 filings · 16 docs
Floor 4John Jay College Haaren Hall4p · 3 filings · 20 docs
Floor 3John Jay College Haaren Hall20p · 3 filings · 20 docs
Floor 2John Jay College Haaren HallUnder Construction37p · 2 filings · 20 docs
Floor 1John Jay College Haaren HallUnder Construction39p · 2 filings · 20 docs
MezzanineJohn Jay College Haaren HallUnder Construction23p · 4 filings · 18 docs
CellarJohn Jay College Haaren Hall, John Jay College of Criminal JUnder Construction33p · 5 filings · 19 docs
Sub-CellarJohn Jay College Haaren Hall, John Jay College of Criminal JUnder Construction20p · 6 filings · 16 docs
Sub-BasementJohn Jay College Haaren Hall32p · 3 filings · 17 docs
Site & exteriorJohn Jay College Haaren Hall, John Jay Haaren HallUnder Construction9p · 4 filings · 14 docs
Filed — no permit issuedJohn Jay College Haaren Hall29p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Dasny10209/10/2026
Dormitory Authority State of NY10203/22/2026
CUNY310/04/2026
Metropolis Realty103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Loring Consulting Engineers1203/21/2026
Construction Permit Services103/21/2026
Design 2147603/21/2026
JMV Architect603/21/2026
Lombardo Building Consultants103/21/2026
JM Zoning1003/21/2026
RPO1803/21/2026
CCM Services Group103/21/2026
William Vitacco Associates303/21/2026
PS Consultants203/21/2026
A1 Expediting Service203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PJP InstallersScaffold808/07/2026
Lindi Construction GroupGeneral Contractor707/08/2026
National Enviromental SafetyGeneral Contractor606/28/2026
Senco MetalsGeneral Contractor406/28/2026
Sierra Mechanical ContractingGeneral Contractor409/10/2026
Tundra AirGeneral Contractor307/08/2026
AJC SprinklerFire Protection307/08/2026
Sirina Fire ProtectionFire Protection207/08/2026
Lawrence J. LevineFire Protection203/21/2026
Jemco Electrical Contspecialty_contractor207/08/2026
Shaw MechanicalPlumbing107/08/2026
Gotham CommunicationsGeneral Contractor107/08/2026
John Jay CollegeElectrical103/21/2026
Mer ElectricElectrical103/22/2026
Stanco System Electrical ContElectrical103/21/2026
J.H. Electric of New YorkElectrical103/21/2026
RPJ ElectricElectrical103/21/2026
TristruxGeneral Contractor104/09/2026
Cross Hudson ElectricalElectrical103/21/2026
Advanced Construction EquipmentScaffold107/08/2026
Raptor Electrical ConstructionElectrical103/21/2026
Par Fire ProtectionFire Protection107/08/2026
Par Plumbing CoPlumbing107/08/2026
Nunez ElectricElectrical103/21/2026
Five Star ElectricElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Socotec Engineering4983910/09/2025
Future Tech Consultants O5891908/06/2025
Building Lifecycle
All (256)Filed (50)Permit Issued (39)Signed Off (9)Facade (FISP) (15)Violation (60)Inspection (8)Objection (45)Special Inspection (30)
10/01/2026
Objection raised — Other
09/24/2026
Objection raised — Admin
09/22/2026
Objection raised — Admin
09/11/2026
Filed — Alteration
Alterations and repairs of the John Jay College Haaren Hall building roof.
M01442976-S1
09/11/2026
Filed — Alteration
Alterations and repairs of the John Jay College Haaren Hall building roof.
M01442976-S2
09/11/2026
Filed — Alteration
Alterations and repairs of the John Jay College Haaren Hall building roof.
M01442976-I1
09/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
09/10/2026
Special inspection requirement — Post-installed Anchors
09/10/2026
Special inspection requirement — Structural Steel - Welding
09/10/2026
Special inspection requirement — Structural Steel - High Strength Bolting
09/09/2026
Permit issued — Mechanical Systems
M01292775-I1-MS
09/09/2026
Permit issued — General Construction
M01293805-I1-GC
09/09/2026
Special inspection requirement — Sprinkler Systems
09/04/2026
Special inspection requirement — Structural Steel - Details
09/04/2026
Special inspection requirement — Post-installed Anchors
09/04/2026
Special inspection requirement — Final
09/03/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
09/03/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
09/03/2026
Special inspection requirement — Exterior lighting power
09/03/2026
Special inspection requirement — Fenestration areas
09/03/2026
Special inspection requirement — Final
09/03/2026
Special inspection requirement — Post-installed Anchors
09/03/2026
Special inspection requirement — Air barrier - visual inspection
09/03/2026
Special inspection requirement — Interior lighting power
09/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
09/03/2026
Special inspection requirement — Insulation placement and R values
09/03/2026
Special inspection requirement — Lighting controls
09/03/2026
Special inspection requirement — Combustible Exterior Wall Coverings
09/03/2026
Special inspection requirement — Energy Code Compliance Inspections
08/11/2026
Signed off — Alteration
Modification, of the mechanical system, as shown on drawings. No changes to occupancy, use, or egress.
M00926549-S2
08/06/2026
Permit issued — Sidewalk Shed
M01378241-I1-SH
08/06/2026
Permit issued — Sidewalk Shed
M01399789-I1-SH
08/04/2026
Filed — Alteration
INSTALLATION OF SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01378241-I1
08/04/2026
Permit issued — Sidewalk Shed
M01378241-I1-SH
07/15/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/29/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/23/2026
Permit issued — Structural
M01026304-S4-ST
06/23/2026
Permit issued — Mechanical Systems
M01026304-S3-MS
06/23/2026
Permit issued — General Construction
M01026304-I1-GC
06/11/2026
Permit issued — General Construction
M01026805-I1-GC
06/11/2026
Permit issued — Structural
M01026805-S1-ST
06/10/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/08/2026
Signed off — Alteration
Modification, of the mechanical system, as shown on drawings. No changes to occupancy, use, or egress.
M00926549-S1
05/13/2026
Permit issued — Sidewalk Shed
M01399789-I1-SH
05/12/2026
Filed — Alteration
INSTALLATION OF SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01399789-I1
05/06/2026
Permit issued — Structural
M01026304-S4-ST
04/15/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
04/01/2026
Filed — Alteration
JJ Haaren Hall, Exterior repairs: Removal/replacement/repairs of cracked/spalled terracotta, brick masonry, Terracotta, Stone, EIFS and stucco. Masonry re-pointing. Install handrail extensions. Scrap & paint existing steel lintels/beams, win bars & rails.
M01355085-I1
03/10/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/06/2026
Permit issued — Mechanical Systems
M01026304-S3-MS
03/04/2026
Signed off — Alteration
M01043712-I1
02/26/2026
Permit issued — General Construction
M01026304-I1-GC
02/17/2026
Permit issued — Sprinklers
M01026304-S2-EW-SP
02/11/2026
Permit issued — Plumbing
M01026304-S1-PL
02/03/2026
Special inspection requirement — Masonry
02/03/2026
Special inspection requirement — Post-installed anchors in masonry
02/03/2026
Special inspection requirement — Structural Steel - Welding
02/03/2026
Special inspection requirement — Final
Paul Millman
01/14/2026
Permit issued — Sprinklers
M00926549-S2-EW-SP
11/24/2025
Signed off — Alteration
Modification to existing VERIZON site on the roof. Replacement of (9) RRH and (12) Antennas. Removal of (4) Cabinets and (3) MDBs from an existing platform. Installation of (1) Cabinet on existing platform on the roof.
M00918101-I1
Latest 60 of 256 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedSierra Mechanical Contracting09/09/2026
DOB NOWGeneral ConstructionPermit IssuedSierra Mechanical Contracting09/09/2026
DOB NOWSidewalk ShedPermit IssuedPJP Installers08/06/2026
DOB NOWSidewalk ShedPermit IssuedPJP Installers08/06/2026
DOB NOWSidewalk ShedPermit IssuedPJP Installers08/04/2026
DOB NOWStructuralPermit IssuedNational Enviromental Safety06/23/2026
DOB NOWMechanical SystemsPermit IssuedNational Enviromental Safety06/23/2026
DOB NOWGeneral ConstructionPermit IssuedNational Enviromental Safety06/23/2026
DOB NOWGeneral ConstructionPermit IssuedSenco Metals06/11/2026
DOB NOWStructuralPermit IssuedSenco Metals06/11/2026
DOB NOWSidewalk ShedPermit IssuedPJP Installers05/13/2026
DOB NOWStructuralPermit IssuedNational Enviromental Safety05/06/2026
DOB NOWMechanical SystemsPermit IssuedNational Enviromental Saf03/06/2026
DOB NOWGeneral ConstructionPermit IssuedNational Enviromental Saf02/26/2026
DOB NOWSprinklersPermit IssuedLawrence J. Levine02/17/2026
DOB NOWPlumbingPermit IssuedPar Plumbing Co02/11/2026
DOB NOWSprinklersSigned-offAJC Sprinkler01/14/2026
DOB NOWSprinklersPermit IssuedSirina Fire Protection09/22/2025
DOB NOWStructuralSigned-offLindi Construction Group08/28/2025
DOB NOWStructuralPermit IssuedSenco Metals06/03/2025
DOB NOWGeneral ConstructionPermit IssuedSenco Metals06/03/2025
DOB NOWSidewalk ShedSigned-offPJP Installers05/01/2025
DOB NOWAntennaSigned-offTristrux04/08/2025
DOB NOWSuspended ScaffoldPermit IssuedNicholson & Galloway03/27/2025
DOB NOWSprinklersSigned-offAJC Sprinkler01/08/2025
DOB NOWGeneral ConstructionSigned-offLindi Construction Group12/24/2024
DOB NOWMechanical SystemsSigned-offTundra Air09/26/2024
DOB NOWSprinklersPermit IssuedSirina Fire Protection09/23/2024
DOB NOWSprinklersSigned-offAJC Sprinkler08/21/2024
DOB NOWMechanical SystemsSigned-offTundra Air08/16/2024
DOB NOWMechanical SystemsSigned-offTundra Air07/23/2024
DOB NOWStructuralSigned-offLindi Construction Group07/01/2024
DOB NOWSidewalk ShedSigned-offPJP Installers05/01/2024
DOB NOWPlumbingSigned-offJames Cruz08/31/2022
DOB NOWMechanical SystemsSigned-offJemco Electrical Cont04/06/2022
DOB NOWMechanical SystemsSigned-offJemco Electrical Cont03/15/2022
DOB NOWGeneral ConstructionSigned-offGotham Communications10/21/2021
DOB NOWMechanical SystemsSigned-offSierra Mechanical Contracting08/11/2021
DOB NOWSidewalk ShedPermit IssuedAdvanced Construction Equipment06/15/2018
BISOTISSUEDVolmar Construction10/26/2023
+ 49 more permits on file
3 projects · most recent 10/09/2025
Ventilation Systems Heating Systems Associated Ducts and Piping
FiledStatusContractorScopeMake / Model / Capacity
10/09/2025Permit IssuedSierra Mechanical ContractingHeating Systems, Ventilation Systems
Heating
Taco E10214-S 3,052,000 BTU · Heat Exchanger ×2
G4208S 952,400 BTU · Heat Exchanger ×1
Ventilation
Trane CSAA-003 70,200 BTU · Makeup Air ×1
CSAA-1 360,220 BTU · Makeup Air ×1
08/07/2025——Ventilation Systems
Ventilation
— AX-125-533-1225-C200 36,000 CFM ×2
AX-72-190-063 16,400 CFM ×1
AX-90-190-061 20,000 CFM ×1
AX-90-275-0610-A75 14,000 CFM ×1
Greenheck AX-72-190-0630 16,400 CFM · Exhaust Fan ×1
GB-200HP-10 2,600 BTU · Exhaust Fan ×1
USF-33 14,200 CFM · Exhaust Fan ×1
USF-33-B4 20,200 CFM · Exhaust Fan ×1
USF-66 63,300 CFM · Exhaust Fan ×1
08/06/2025Signed-offLindi Construction GroupAssociated Ducts and Piping
Ducts & Piping
__Junk__ Modification of ductwork and mechanical devices 1 BTU ×2
4 projects · most recent 09/11/2026
FiledStatusContractorScope
09/11/2026———
08/06/2025Signed-offAJC Sprinkler18 heads
06/27/2025Permit IssuedPar Fire Protection188 heads
09/13/2024Permit IssuedSirina Fire Protection32 heads
3 projects · most recent 09/11/2026
Storm Water/Sanitary
FiledStatusContractorScope
09/11/2026——Storm, Water/Sanitary
10/09/2025——Water/Sanitary
06/27/2025Permit IssuedPar Plumbing CoStorm
12 projects · most recent 05/11/2026
General Wiring Lighting
FiledStatusContractorScope
05/11/2026Permit IssuedLabco Eletrt ContngGeneral Wiring
09/10/2024CompleteAujla ElectricGeneral Wiring
07/29/2024CompleteAujla Electric—
05/30/2024Permit IssuedTop Shelf Electric—
03/22/2024CompleteMer ElectricGeneral Wiring
08/04/2023Permit IssuedJemco Electric ContractorsGeneral Wiring
05/17/2022Permit IssuedJemco Electric ContractorsGeneral Wiring
03/22/2022Permit IssuedFalcon Electrical ContractingGeneral Wiring
01/31/2022CompleteArk Systems ElectricGeneral Wiring, Lighting
10/28/2020Permit IssuedJemco Electric ContractorsGeneral Wiring
02/10/2020Permit IssuedJemco Electric ContractorsGeneral Wiring
06/08/2018Permit IssuedStanco System Electrical Cont—
4 projects · most recent 09/11/2026
Steel
FiledStatusContractorScope
09/11/2026——Steel
04/01/2026——1 scope_items
08/07/2025——Steel
08/06/2025Signed-offAJC SprinklerSteel
1 project · most recent 03/19/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
03/19/2025Permit IssuedNicholson & GallowaySuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
07/15/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/29/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/10/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/15/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/10/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/01/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/20/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/12/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 145
DateRequirementInspectorRole
09/10/2026Structural Steel - Welding—special
09/10/2026Structural Steel - High Strength Bolting—special
09/10/2026Fire-Resistant Penetrations and Joints—special
09/10/2026Post-installed Anchors—special
09/09/2026Sprinkler Systems—special
09/04/2026Structural Steel - Details—special
09/04/2026Final—progress
09/04/2026Post-installed Anchors—special
09/03/2026Exterior lighting power—energy_progress
09/03/2026Interior lighting power—energy_progress
09/03/2026Air barrier - visual inspection—energy_progress
09/03/2026Fenestration areas—energy_progress
09/03/2026Insulation placement and R values—energy_progress
09/03/2026Fenestration and door U-factor and product ratings—energy_progress
09/03/2026Energy Code Compliance Inspections—progress
09/03/2026Final—progress
09/03/2026Post-installed Anchors—special
09/03/2026Fire-Resistant Penetrations and Joints—special
09/03/2026Exterior Insulation and Finish Systems (EIFS)—special
09/03/2026Combustible Exterior Wall Coverings—special
09/03/2026Lighting controls—energy_progress
02/03/2026Masonry—special
02/03/2026FinalPaul Millmanprogress
02/03/2026Structural Steel - Welding—special
02/03/2026Post-installed anchors in masonry—special
Latest 25 of 145.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
John Jay College Haaren HallEducationSub-cellar, Cellar, Sub-basement, Floors 1–6, Mezzanine, Roof
Project M01442976 Alteration · Objections · 09/11/2026
Project M01378241 Alteration · Permit Entire · 08/04/2026
Project M01355085 Alteration · Approved · 04/01/2026
Project M01292775 Alteration · Permit Entire · 10/09/2025
Project M01292777 Alteration · Approved · 10/09/2025
Project M01293805 Alteration · Permit Entire · 10/09/2025
Project M01292744 Alteration · Objections · 09/30/2025
Project M01254581 Alteration · Approved · 08/06/2025
Project M01026304 Alteration · Permit Entire · 06/23/2025
Project M00918101 Alteration · LOC Issued · 04/01/2025
Project M01177717 Alteration · Permit Entire · 03/19/2025
Project M01043712 Alteration · LOC Issued · 05/01/2024
John Jay Haaren HallEducation—
Project M01399789 Alteration · Permit Entire · 05/12/2026
John Jay College of Criminal JusticeEducationSub-cellar, Cellar
Project M00623114 Alteration · Approved · 02/07/2022
Project M00623101 Alteration · Approved · 02/04/2022
Project M00623110 Alteration · Permit Entire · 02/04/2022
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 1,061 on file (BIS + DOB NOW)
▸Plans & Drawings50
▸DOB NOWPlans/Sketch46
09/23/2026M01442976-S1Request digital key ↗
09/23/2026M01442976-I1Request digital key ↗
09/23/2026M01442976-S2Request digital key ↗
Showing 3 of 46 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly3
09/02/2026M00171555-P2Request digital key ↗
09/02/2026M00171555-I1Request digital key ↗
09/02/2026M00171555-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/14/2026M00346659-I1Request digital key ↗
▸Applications & Permits232
▸BISWORK PERMIT APPLICATION119
12/28/2021140902174Open ↗
07/27/2021123820099Open ↗
05/12/2021140914624Open ↗
Showing 3 of 119 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION94
10/11/2023140914624Open ↗
10/06/2023140914624Open ↗
09/19/2023140914624Open ↗
Showing 3 of 94 on file for this type
▸BISPLACE OF ASSEMBLY13
03/24/2023122716221Open ↗
03/24/2023120008491Open ↗
03/24/2023120008295Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWHPD Certification Letter or CPC Special Permit4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISPLACE OF ASSEMBLY APPLICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Seals & Professional Certifications205
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION81
03/13/2020122783568Open ↗
03/13/2020122783568Open ↗
03/13/2020122783568Open ↗
Showing 3 of 81 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature49
09/23/2026M01442976-I1Open ↗
09/23/2026M01442976-S1Open ↗
09/23/2026M01442976-S2Open ↗
Showing 3 of 49 on file for this type
▸DOB NOWProgress Inspector Seal & Signature29
10/03/2026M00171555-P2Open ↗
09/16/2026M00534514-P1Open ↗
09/16/2026M00534514-P1Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature19
09/16/2026M00534514-P1Open ↗
09/04/2026M01254581-S2Open ↗
09/01/2026M01026304-I1Open ↗
Showing 3 of 19 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE3
06/25/2020140914624Open ↗
05/15/2020140902174Open ↗
Showing 2 of 3 on file for this type
▸Trade Schedules & Equipment30
▸BISSCHEDULE B - PLUMBING9
03/14/2022123811312Open ↗
03/09/2022123820099Open ↗
Showing 2 of 9 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE7
07/01/2019123811312Open ↗
06/27/2019123820099Open ↗
Showing 2 of 7 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA6
02/18/2020122710628Open ↗
02/11/2020123191820Open ↗
Showing 2 of 6 on file for this type
▸BISSELF-CERT PLUMBING NOTICE5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Safety & Tenant Protection48
▸DOB NOWHPD-2: Clinton Special District Anti-Harassment Checklist34
09/23/2026M01442976-I1Open ↗
09/23/2026M01442976-S1Open ↗
09/23/2026M01442976-S2Open ↗
Showing 3 of 34 on file for this type
▸BISANTI-HARASSMENT CHECKLIST: CLINTON7
05/15/2020140902174Open ↗
Showing 1 of 7 on file for this type
▸BISHPD-2 - Clinton Special district Anti-Harassment Checklist2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISST-1 Street Tree Checklist1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWCertificate of No Harassment1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos78
▸DOB NOWDEP ACP-5: Asbestos Assessment Report37
09/03/2026M00534750-P1Open ↗
09/03/2026M00534750-I1Open ↗
09/03/2026M00534750-P4Open ↗
Showing 3 of 37 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER16
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 16 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)14
06/25/2020140914624Open ↗
01/31/2020123511262Open ↗
Showing 2 of 14 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)2
12/28/2021140902174Open ↗
07/23/2021123820099Open ↗
▸BISASBESTOS: VARIANCE (DEP FORM V5)1
01/18/2022123511262Open ↗
▸BISAPPLICANT SHALL PROVIDE 1 ACP-21 FORMPRIOR TO SIGN OFF: TRU2892MN191
01/18/2022123511262Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance60
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY18
11/10/2022123811312Open ↗
11/09/2022123811312Open ↗
03/23/2022123811312Open ↗
Showing 3 of 18 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS18
10/15/2019140560505Open ↗
08/20/2019123511262Open ↗
07/01/2019123811312Open ↗
Showing 3 of 18 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS5
10/26/2020123554545Open ↗
10/15/2019140560505Open ↗
Showing 2 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)4
02/08/2024140914624Open ↗
11/09/2022123811312Open ↗
11/07/2022140902174Open ↗
Showing 3 of 4 on file for this type
▸BISINTERIOR LIGHTING POWER3
11/09/2022123811312Open ↗
11/07/2022140902174Open ↗
01/19/2022123511262Open ↗
▸BISLIGHTING CONTROLS3
11/10/2022123811312Open ↗
11/07/2022140902174Open ↗
01/19/2022123511262Open ↗
▸BIS* HVAC INSULATION AND SEALING2
11/09/2022123811312Open ↗
01/19/2022123511262Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS2
11/09/2022123811312Open ↗
11/07/2022140902174Open ↗
▸BISTR8: Energy Code Progress Inspections2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISEXTERIOR LIGHTING POWER1
02/05/2024140914624Open ↗
▸Inspections & Test Reports36
▸BISTECHNICAL REPORT: RESPONSIBILITY25
10/05/2023140914624Open ↗
10/05/2023140914624Open ↗
11/11/2022123820099Open ↗
Showing 3 of 25 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER3
03/13/2020122783568Open ↗
03/13/2020122783568Open ↗
Showing 2 of 3 on file for this type
▸BISFIRE-RESISTIVE RATED CONSTRUCTION3
11/09/2022123811312Open ↗
11/07/2022140902174Open ↗
01/19/2022123511262Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)2
11/07/2022140902174Open ↗
09/19/2022123820099Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
03/13/2020122783568Open ↗
Showing 1 of 2 on file for this type
▸BISMECHANICAL SYSTEMS1
11/09/2022123811312Open ↗
▸Approvals, Objections & Sign-offs124
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter47
09/23/2026M01442976-I1Open ↗
09/23/2026M01442976-S1Open ↗
09/23/2026M01442976-S2Open ↗
Showing 3 of 47 on file for this type
▸BISADMINISTRATIVE OBJECTIONS24
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 24 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST18
02/08/2024140914624Open ↗
11/14/2022123820099Open ↗
11/10/2022123811312Open ↗
Showing 3 of 18 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION12
10/15/2019140560505Open ↗
Showing 1 of 12 on file for this type
▸BISSUPERSEDING LETTER11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISSHED LETTER5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISFINAL4
02/05/2024140914624Open ↗
11/09/2022123811312Open ↗
11/07/2022140902174Open ↗
Showing 3 of 4 on file for this type
▸BISCCD1-Construction Code Determination3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Cost, Insurance & Ownership49
▸BISCOST AFFIDAVIT45
09/09/2020140914624Open ↗
05/15/2020140902174Open ↗
03/13/2020122783568Open ↗
Showing 3 of 45 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW34
02/01/2024140914624Open ↗
11/09/2022123811312Open ↗
11/07/2022140902174Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms97
▸BISEFILING COVER SHEET50
07/01/2019123811312Open ↗
07/01/2019123811312Open ↗
06/27/2019123820099Open ↗
Showing 3 of 50 on file for this type
▸BISADDITIONAL INFORMATION32
10/23/2023140914624Open ↗
10/11/2023140914624Open ↗
11/10/2022123811312Open ↗
Showing 3 of 32 on file for this type
▸BISBOROUGH INTAKE FORM12
03/13/2020122783568Open ↗
03/13/2020122783568Open ↗
03/05/2020123191820Open ↗
Showing 3 of 12 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
06/25/2020140914624Open ↗
05/15/2020140902174Open ↗
Showing 2 of 3 on file for this type
▸Other Documents31
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION24
06/26/2019123811312Open ↗
Showing 1 of 24 on file for this type
▸BISSupporting Document: Fee Exempt2
05/15/2020140902174Open ↗
Showing 1 of 2 on file for this type
▸BISMAINTENANCE INFORMATION2
11/09/2022123811312Open ↗
01/19/2022123511262Open ↗
▸DOB NOWMultiple Dwelling Special District Notice to Community Board1
08/13/2026M00052960-I1Open ↗
▸DOB NOWManufacturer's Specifications1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWMultiple Dwelling Special District Feasibility of Government Funded Rehabilitation1
08/13/2026M00052960-I1Open ↗