← Back
Three families
9 LEFFERTS PLACE
BROOKLYN · BIN 3057656
💬 Discuss this project
1899Year Built
3Stories
C0Building Class
R6BZoning
3,134 sfGross Floor Area
3Units
Rent Stabilized3 Open Violations ▸FDNY Report ↗
Three families · 2,250 sf lot · 1.39 FAR built · Flood zone X
Locations of Work
Basement1p · 1 filing · 6 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/17/2022$3.6M—Private party → Private party$1,149/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BLUE SKY DESIGN, INC.106/06/2022
BO LEE ARCHITECT PC204/25/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ANZALONE ARCHITECTURE603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AMARO CONSTRUCTION CORPGeneral Contractor403/21/2026
DNA PLUMBING CONTR. INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BLUE SKY DESIGN, INC.1908206/06/2022
CATALPA SPECIAL INSPECTIO2004204/25/2022
Building Lifecycle
All (17)Filed (3)Permit Issued (3)Signed Off (3)Violation (8)
05/05/2026
Violation issued (HPD, open)
A
03/30/2023
Signed off — Alteration
STRUCTURAL WORK FILED IN CONJUNCTION WITH APT. RENOVATION. STRUCTURAL FRAMING WORK, NEW REAR DECK WITH SONOTUBE FOUNDATION.
B00703012-I1
03/29/2023
Signed off — Alteration
PLUMBING WORK FILED IN CONJUNCTION WITH EXISTING DUPLEX APARTMENT RENOVATION AT BASEMENT & 1ST FLOOR. RENOVATE KITCHEN, NEW POWDER ROOM. INSTALL PLUMBING FIXTURES AND RELATED PIPING.
B00703055-I1
03/29/2023
Signed off — Alteration
MINOR RENOVATION TO EX DUPLEX APT AT THE BASEMENT & 1ST FL. RENOVATE EX KITCHEN, NEW POWDER ROOM. CONSTRUCT NEW REAR DECK. DEMOLISH EXISTING 1-STY REAR ADDITION. NEW KITCHEN EXHAUST. NEW SPLIT A/C. PLUMBING AND STRUCTURAL/FOUNDATION WORK FILED SEPARATELY
B00702894-I1
03/23/2023
Violation issued (HPD, closed)
A
08/10/2022
Permit issued — Plumbing
B00703055-I1-PL
07/18/2022
Permit issued — Mechanical Systems
B00702894-I1-GC-CX
07/12/2022
Permit issued — General Construction
B00703012-I1-GC-CX
06/06/2022
Filed — Alteration
STRUCTURAL WORK FILED IN CONJUNCTION WITH APT. RENOVATION. STRUCTURAL FRAMING WORK, NEW REAR DECK WITH SONOTUBE FOUNDATION.
B00703012-I1
04/25/2022
Filed — Alteration
PLUMBING WORK FILED IN CONJUNCTION WITH EXISTING DUPLEX APARTMENT RENOVATION AT BASEMENT & 1ST FLOOR. RENOVATE KITCHEN, NEW POWDER ROOM. INSTALL PLUMBING FIXTURES AND RELATED PIPING.
B00703055-I1
04/15/2022
Filed — Alteration
MINOR RENOVATION TO EX DUPLEX APT AT THE BASEMENT & 1ST FL. RENOVATE EX KITCHEN, NEW POWDER ROOM. CONSTRUCT NEW REAR DECK. DEMOLISH EXISTING 1-STY REAR ADDITION. NEW KITCHEN EXHAUST. NEW SPLIT A/C. PLUMBING AND STRUCTURAL/FOUNDATION WORK FILED SEPARATELY
B00702894-I1
04/09/2021
Violation issued (HPD, closed)
A
04/09/2021
Violation issued (HPD, closed)
I
10/30/2019
Violation issued (HPD, closed)
I
11/27/2017
Violation issued (HPD, closed)
I
09/16/2010
Violation issued (HPD, open)
C
09/16/2010
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offDNA PLUMBING CONTR. INC08/10/2022
DOB NOWMechanical SystemsSigned-offAMARO CONSTRUCTION CORP07/18/2022
DOB NOWGeneral ConstructionSigned-offAMARO CONSTRUCTION CORP07/12/2022
BISOTISSUEDBURDA CONSTRUCTION CORP08/17/2012
BISPLISSUEDA.M.N. CORPORATION07/17/2012
BISEQISSUEDCS BRIDGE CORP11/10/2011
BISOTISSUEDBURDA CONSTRUCTION CORP11/07/2011
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
01/05/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/05/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/21/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/05/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/26/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 25
DateRequirementInspectorRole
06/09/2022Structural Steel - High Strength BoltingANDREW RENFROEspecial
06/09/2022Structural Steel - WeldingANDREW RENFROEspecial
06/09/2022Post-installed AnchorsANDREW RENFROEspecial
06/09/2022Concrete - Cast-In-PlaceANDREW RENFROEspecial
05/27/2022Structural Steel - DetailsANDREW RENFROEspecial
04/14/2022HVAC-R and service water heating equipmentBO LEEenergy_progress
04/14/2022HVAC-R and service water piping design and insulationBO LEEenergy_progress
04/14/2022HVAC-R and service water heating system controlsBO LEEenergy_progress
04/14/2022Maintenance informationBO LEEenergy_progress
03/30/2022Shutoff dampersBO LEEenergy_progress
03/30/2022Fire-Resistant Penetrations and JointsERIC BERLENTspecial
03/30/2022Energy Code Compliance InspectionsBO LEEprogress
03/30/2022HVAC-R and service water piping design and insulationBO LEEenergy_progress
03/30/2022Fire-Resistant Penetrations and JointsERIC BERLENTspecial
03/30/2022Energy Code Compliance InspectionsBO LEEprogress
03/30/2022Fenestration air leakageBO LEEenergy_progress
03/30/2022Fenestration areasBO LEEenergy_progress
03/30/2022Fenestration and door U-factor and product ratingsBO LEEenergy_progress
03/30/2022Lighting in dwelling unitsBO LEEenergy_progress
03/21/2022FinalBO LEEprogress
03/21/2022Mechanical SystemsERIC BERLENTspecial
03/21/2022Structural Stability – Alterations of existing buildingsANDREW RENFROEspecial
03/21/2022Structural Stability – Alterations of existing buildingsANDREW RENFROEspecial
03/21/2022FinalANDREW RENFROEprogress
03/21/2022Footing and FoundationANDREW RENFROEprogress
▾Documents — 54 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/29/2026B00702894-I1Request digital key ↗
08/29/2026B00703055-I1Request digital key ↗
08/14/2026B00703012-I1Request digital key ↗
▸Applications & Permits7
▸BISWORK PERMIT APPLICATION4
08/22/2012320235330Open ↗
07/18/2012320235330Open ↗
11/15/2011320392543Open ↗
Showing 3 of 4 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION3
02/11/2013320235330Open ↗
11/15/2011320392543Open ↗
11/08/2010320235330Open ↗
▸Seals & Professional Certifications21
▸DOB NOWProgress Inspector Seal & Signature6
09/12/2026B00703055-I1Open ↗
09/12/2026B00703055-I1Open ↗
08/26/2026B00702894-I1Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
04/05/2013320235330Open ↗
03/29/2013320392543Open ↗
11/08/2010320235330Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/12/2026B00703055-I1Open ↗
08/26/2026B00702894-I1Open ↗
08/26/2026B00702894-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/29/2026B00703055-I1Open ↗
08/13/2026B00702894-I1Open ↗
08/13/2026B00703012-I1Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
11/15/2011320392543Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
11/15/2011320392543Open ↗
▸Trade Schedules & Equipment3
▸BISSELF-CERT PLUMBING NOTICE2
11/14/2012320235330Open ↗
08/22/2012320235330Open ↗
▸BISSCHEDULE B - PLUMBING1
11/08/2010320235330Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/29/2026B00703055-I1Open ↗
08/13/2026B00703012-I1Open ↗
08/13/2026B00702894-I1Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
04/05/2013320235330Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
11/15/2011320392543Open ↗
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis2
08/29/2026B00703055-I1Open ↗
08/13/2026B00702894-I1Open ↗
▸Approvals, Objections & Sign-offs6
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
04/05/2013320235330Open ↗
03/29/2013320392543Open ↗
05/22/2013320235330Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
11/15/2011320392543Open ↗
11/08/2010320235330Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
11/09/2011320235330Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
05/22/2013320235330Open ↗
04/05/2013320235330Open ↗
11/08/2010320235330Open ↗
▸Filing & Intake Forms4
▸BISADDITIONAL INFORMATION2
02/20/2013320235330Open ↗
08/03/2012320235330Open ↗
▸BISEFILING COVER SHEET1
11/08/2010320235330Open ↗
▸BISeFiling Job Application Cover Sheet1
11/15/2011320392543Open ↗