← Back
Condo, residential unit in elevator building
Parkchester North Condominium
9 METROPOLITAN OVAL · BIN 2096684
💬 Discuss this project
1940Year Built
13Stories
R4Building Class
R6Zoning
2,812,639 sfGross Floor Area
3,857Units
LL97 CoveredRent Stabilized2,808 Open Violations 2,802 unresolved · 6 paperwork only ▸FISP: SWARMP
Condo, residential unit in elevator building · Owner of record: PPC RESIDENTIAL, LLC · 1,500,000 sf lot · 1.88 FAR built · Flood zone X
Locations of Work
ArchitectureEquipment
Permit Issued — active, not yet Signed-off
RoofUnder Construction11p · 3 filings · 19 docs
Bulkhead1p · 1 filing · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
KINGS GROUP NY309/13/2026
PARKCHESTER NORTH CONDOMINIUM1309/13/2026
PRATT CONSTRUCTION1007/08/2026
PPC RESIDENTIAL LLC PARKC203/22/2026
PPC RESIDENTIAL, LLC103/22/2026
GRENADIER REALTY103/22/2026
ROCK GROUP NY403/21/2026
PPC PROPERTY SERVICE1203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KMA DESIGNS LLC105/12/2026
RIMKUS NEW YORK PLLC201/07/2026
CONNOLLY ENGINEERING, PLLC101/21/2025
ASHRAF CORP102/05/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Rigid Structural Design, LLC103/21/2026
OUTSOURCE CONSULTANTS, INC.603/21/2026
NY EXPEDITERS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PRATT CONSTRUCTION & RESTGeneral Contractor603/21/2026
PRAT ENTERPRISES CORPGeneral Contractor407/08/2026
TWO-TONE CONTRACTING CORP.General Contractor307/08/2026
KINGS GROUP NY CORPGeneral Contractor208/26/2026
R.C.M. ELECTRIC CORP.Electrical103/22/2026
STEVEN FARKASElectrical103/21/2026
ROBERT MARCHISOTTOElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RIMKUS NEW YORK, PLLC8123101/07/2026
CONNOLLY ENGINEERING, PLL3427101/21/2025
OUTSOURCE SPECIAL INSPECT2827101/21/2025
SULLIVAN ENGINEERING LLC6827103/04/2021
Building Lifecycle
All (124)Filed (7)Permit Issued (11)Signed Off (4)Facade (FISP) (12)Violation (60)Objection (20)Special Inspection (10)
08/06/2026
Permit issued — Sidewalk Shed
X01327949-S1-SH
06/08/2026
Violation issued (HPD, closed)
C
05/23/2026
Violation issued (HPD, closed)
A
05/20/2026
Violation issued (HPD, closed)
B
05/20/2026
Violation issued (HPD, closed)
C
05/20/2026
Violation issued (HPD, closed)
B
05/20/2026
Violation issued (HPD, closed)
C
05/13/2026
Permit issued — Sidewalk Shed
X01327949-S1-SH
05/12/2026
Filed — Alteration
APPLICATION FILED HEREWITH FOR FISP AND LEAK RELATED FACADE RESTORATION WORK AS SHOWN ONPLANS SUBMITTED. NO CHANGE IN USE,EGRESS OR OCCUPANCY UNDER THIS APPLICATION
X01327949-S1
05/09/2026
Violation issued (HPD, open)
B
05/09/2026
Violation issued (HPD, open)
A
05/09/2026
Violation issued (HPD, open)
B
05/02/2026
Violation issued (HPD, closed)
C
05/02/2026
Violation issued (HPD, closed)
C
05/02/2026
Violation issued (HPD, closed)
B
05/02/2026
Violation issued (HPD, closed)
C
05/02/2026
Violation issued (HPD, closed)
B
05/02/2026
Violation issued (HPD, closed)
B
04/22/2026
Permit issued — Suspended Scaffold
X01377686-I1-SC
04/22/2026
Violation issued (HPD, open)
A
04/22/2026
Violation issued (HPD, open)
B
04/22/2026
Violation issued (HPD, open)
B
04/22/2026
Violation issued (HPD, open)
A
04/22/2026
Violation issued (HPD, open)
A
04/22/2026
Violation issued (HPD, open)
B
04/22/2026
Violation issued (HPD, closed)
A
04/22/2026
Violation issued (HPD, closed)
A
04/22/2026
Violation issued (HPD, open)
A
04/22/2026
Violation issued (HPD, open)
B
04/22/2026
Violation issued (HPD, open)
A
04/22/2026
Violation issued (HPD, open)
B
04/22/2026
Violation issued (HPD, closed)
A
04/22/2026
Violation issued (HPD, open)
B
04/08/2026
Permit issued — General Construction
X01327949-I1-GC
03/24/2026
Filed — Alteration
Installation of suspended scaffold for facade work or inspection.
X01377686-I1
03/03/2026
Signed off — Alteration
FISP INSPECTION VIA INDUSTRIAL ROPE ACCESS
X01323939-I1
02/05/2026
Objection resolved — Addressed
02/05/2026
Objection resolved — Addressed
02/05/2026
Objection resolved — Addressed
02/05/2026
Objection resolved — Addressed
01/20/2026
Objection raised — Other
01/20/2026
Objection raised — Other
01/20/2026
Objection raised — Scope
01/20/2026
Objection raised — Other
01/07/2026
Filed — Alteration
APPLICATION FILED HEREWITH FOR FISP AND LEAK RELATED FACADE RESTORATION WORK AS SHOWN ONPLANS SUBMITTED. NO CHANGE IN USE,EGRESS OR OCCUPANCY UNDER THIS APPLICATION
X01327949-I1
12/03/2025
Special inspection requirement — Tenant Protection Plan Compliance
JAMES MONAHAN
12/03/2025
Special inspection requirement — Final
JAMES MONAHAN
12/03/2025
Special inspection requirement — Masonry
JAMES MONAHAN
11/30/2025
Permit issued — Suspended Scaffold
X01323939-I1-SC
11/24/2025
Filed — Alteration
FISP INSPECTION VIA INDUSTRIAL ROPE ACCESS
X01323939-I1
11/14/2025
Signed off — Alteration
Alterations to building entry as per ADA requirement including removal of stairs, installation of ADA ramp. Work to include removal & replacement of building entry vestibule as per plans filed herewith. No change in use, egress or occupancy.
X01127153-I1
10/29/2025
Violation issued (HPD, open)
B
10/29/2025
Violation issued (HPD, open)
B
10/29/2025
Violation issued (HPD, open)
B
10/09/2025
Violation issued (HPD, open)
A
10/09/2025
Violation issued (HPD, open)
A
10/09/2025
Violation issued (HPD, open)
B
10/09/2025
Violation issued (HPD, open)
B
10/09/2025
Violation issued (HPD, closed)
A
10/09/2025
Violation issued (HPD, open)
B
Latest 60 of 124 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedKINGS GROUP NY CORP08/06/2026
DOB NOWSidewalk ShedPermit IssuedKINGS GROUP NY CORP05/13/2026
DOB NOWSuspended ScaffoldPermit IssuedTWO-TONE CONTRACTING CORP04/22/2026
DOB NOWGeneral ConstructionPermit IssuedTWO-TONE CONTRACTING CORP.04/08/2026
DOB NOWSuspended ScaffoldSigned-offTWO-TONE CONTRACTING CORP11/30/2025
DOB NOWStructuralSigned-offTWO-TONE CONTRACTING CORP04/21/2025
DOB NOWSidewalk ShedSigned-offPRAT ENTERPRISES CORP12/15/2021
DOB NOWGeneral ConstructionSigned-offTWO-TONE CONTRACTING CORP08/23/2021
DOB NOWSidewalk ShedSigned-offPRATT CONSTRUCTION & RES*06/03/2021
DOB NOWSidewalk ShedSigned-offPRAT ENTERPRISES CORP05/19/2021
DOB NOWSidewalk ShedSigned-offPRATT CONSTRUCTION & RES*02/08/2021
BISOTISSUEDL & Z CONSULTING CORP02/22/2017
BISOTISSUEDL & Z CONSULTING CORP01/19/2017
BISOTISSUEDAPA GROUP INC04/06/2015
BISEQISSUEDROCK GROUP NY CORP03/25/2015
BISOTISSUEDDF RESTORATION INC05/25/2011
BISEQISSUEDSKYLINE SCAFFOLDING GROUP05/17/2010
BISOTISSUEDDF RESTORATION INC03/19/2010
BISPLRE-ISSUEDBLUEPRINT PLUMBING CORP.04/01/2004
BISOTISSUEDP.P.C. CONSTRUCTION LLC04/01/2004
BISEQISSUEDATLANTIC HEYDT CORPORATION03/31/2004
3 projects · most recent 05/12/2026
FiledStatusContractorScope
05/12/2026Permit IssuedHIGH QUALITY ELEC.OF NYC—
10/05/2023Permit IssuedR.C.M. ELECTRIC CORP.—
04/08/2021CompleteSTEVEN FARKAS—
1 project · most recent 05/12/2026
Sidewalk Shed
FiledStatusContractorScope
05/12/2026Permit IssuedKINGS GROUP NY CORPSidewalk Shed
1 project · most recent 03/24/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
03/24/2026Permit IssuedTWO-TONE CONTRACTING CORPSuspended Scaffold (SC)
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
12/03/2025Tenant Protection Plan ComplianceJAMES MONAHANspecial
12/03/2025FinalJAMES MONAHANprogress
12/03/2025MasonryJAMES MONAHANspecial
10/15/2024Finaldaniel connollyprogress
10/15/2024Tenant Protection Plan ComplianceJONAR MADRIAGAspecial
10/15/2024Concrete - Cast-In-Placedaniel connollyspecial
10/15/2024Post-installed Anchorsdaniel connollyspecial
03/31/2021Energy Code Compliance InspectionsBrian Sullivanprogress
03/31/2021MasonryBrian Sullivanspecial
02/01/2021FinalBrian Sullivanprogress
▾Documents — 105 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch5
08/20/2026X01127153-I1Request digital key ↗
08/17/2026X01323939-I1Request digital key ↗
08/17/2026X01327949-S1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - General Construction1
08/14/2026X00463783-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/25/2026X00466034-I1Request digital key ↗
▸Applications & Permits16
▸BISPLAN / WORK APPROVAL APPLICATION8
01/23/2017220564217Open ↗
08/15/2016220113712Open ↗
04/01/2015220447005Open ↗
Showing 3 of 8 on file for this type
▸BISWORK PERMIT APPLICATION8
02/22/2017220564217Open ↗
01/20/2017220564217Open ↗
04/07/2015220447005Open ↗
Showing 3 of 8 on file for this type
▸Seals & Professional Certifications33
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION12
02/13/2018220564217Open ↗
01/23/2017220564217Open ↗
08/15/2016220113712Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
08/24/2026X01127153-I1Open ↗
08/24/2026X01127153-I1Open ↗
08/24/2026X01127153-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/17/2026X01327949-S1Open ↗
08/17/2026X01327949-I1Open ↗
08/13/2026X00466034-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/24/2026X01127153-I1Open ↗
08/23/2026X01327949-I1Open ↗
08/22/2026X00463783-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
01/23/2017220564217Open ↗
03/25/2015220447176Open ↗
05/17/2010220062768Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
01/23/2017220564217Open ↗
03/25/2015220447176Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
05/17/2010220062768Open ↗
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
01/23/2017220564217Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/14/2026X01327949-I1Open ↗
08/13/2026X01127153-I1Open ↗
08/13/2026X00463783-I1Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
04/18/2011220113712Open ↗
11/25/2009220038876Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
01/20/2017220564217Open ↗
04/01/2015220447005Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
05/17/2010220062768Open ↗
▸Energy Compliance11
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS7
02/14/2018220564217Open ↗
01/23/2017220564217Open ↗
08/15/2016220113712Open ↗
Showing 3 of 7 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
02/13/2018220564217Open ↗
08/11/2015220447005Open ↗
▸BISTECHNICAL REPORT: ENERGY1
05/19/2011220113712Open ↗
▸BISTR8: Energy Code Progress Inspections1
06/19/2012220113712Open ↗
▸Approvals, Objections & Sign-offs9
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
02/13/2018220564217Open ↗
08/22/2016220113712Open ↗
08/12/2016220113712Open ↗
Showing 3 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
04/18/2011220113712Open ↗
05/17/2010220062768Open ↗
11/25/2009220038876Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter1
08/17/2026X01327949-S1Open ↗
▸Cost, Insurance & Ownership9
▸BISCOST AFFIDAVIT9
02/13/2018220564217Open ↗
01/23/2017220564217Open ↗
08/15/2016220113712Open ↗
Showing 3 of 9 on file for this type
▸Filing & Intake Forms7
▸BISEFILING COVER SHEET6
01/23/2017220564217Open ↗
04/01/2015220447005Open ↗
03/25/2015220447176Open ↗
Showing 3 of 6 on file for this type
▸BISBOROUGH INTAKE FORM1
02/13/2018220564217Open ↗
▸Other Documents4
▸DOB NOWIRA Certification1
08/13/2026X01323939-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026X01377686-I1Open ↗
▸DOB NOWDHCR Document1
08/13/2026X00463783-I1Open ↗
▸DOB NOWCalculations1
08/13/2026X01377686-I1Open ↗