← Back
Condo, residential tower (mixed-use, multi-family elevator) [derived]
Franklin Building Condominium
9 MURRAY STREET · BIN 1001446
💬 Discuss this project
1900Year Built
12Stories
RMBuilding Class
C6-3AZoning
105,032 sfGross Floor Area
42Units
LL97 CoveredRent Stabilized0 Open ViolationsFISP: SWARMPFDNY Report ↗
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: THE FRANKLIN BUILDING CONDOMINIUM · 10,123 sf lot · 10.38 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
Roof5p · 2 filings · 20 docs
Floor 123p · 2 filings · 20 docs
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1
CellarUnder Construction4p · 2 filings · 11 docs
Sub-Cellar3p · 1 filing · 6 docs
1 job · most recent 07/24/2025
FiledStatusContractorScope
07/24/2025Signed-offA PLUS PLUMBING CORP8 heads
2 jobs · most recent 07/24/2025
Gas
FiledStatusContractorScope
07/24/2025Signed-offBLAZE PLUMBING & HEATINGGas
12/11/2020Permit IssuedDEPENDABLE MECH CORPGas
14 jobs · most recent 04/17/2024
General Wiring
FiledStatusContractorScope
04/17/2024CompleteCAPUTEK ELEC'L SERVICES,—
12/26/2023CompleteILLUMINOUS ELECTRIC CORP.General Wiring
04/23/2023CompleteRND ELECTRIC CORPGeneral Wiring
08/09/2022CompleteRND ELECTRIC CORP—
06/03/2022CompleteFRACCAVENTO ELEC. CORPGeneral Wiring
04/06/2022CompleteTRIPLE T ELECTRIC INCGeneral Wiring
01/19/2022CompleteHERTZ ELECTRIC LLCGeneral Wiring
06/25/2021CompleteFRACCAVENTO ELEC. CORPGeneral Wiring
02/25/2021CompleteREDLINE ELECTRIC INC—
10/27/2020CompleteDEMAND ELECTRIC INC—
08/13/2020CompleteA.M.J ELECTRIC CORP—
02/15/2019CompleteATN ELECTRIC CORPGeneral Wiring
09/28/2018CompleteGLENDALE ELECTL CONTNG INGeneral Wiring
05/03/2018CompleteZIN ELECTRICAL, INCGeneral Wiring
Building Lifecycle
All (177)Filed (19)Permit Issued (22)Signed Off (11)Facade (FISP) (15)Violation (60)Inspection (14)Objection (10)Special Inspection (26)
06/08/2026
Permit issued — Plumbing
M00437131-I1-PL
05/26/2026
Signed off — Alteration
APPLICATION IS FILED FOR THE INSTALLATION OF NEW SPRINKLER HEADS (3) WITH SERVICE FROM EXISTING SPRINKLER SYSTEM; AND FOR THE INSTALLATION OF NEW GAS EQUIPMENT AND PIPING AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M00573828-I1
05/26/2026
Signed off — Alteration
APPLICATION IS FILED FOR NEW PARTITIONS WITHING APARTMENT # 12SW AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
M00455898-I1
04/28/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/19/2026
Permit issued — Plumbing
M00573828-I1-EW-SP
03/16/2026
Signed off — Alteration
Replacement of 275 sf of face brick at upper portion of building facade.
M01249436-I1
12/09/2025
Signed off — Alteration
INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. PIPE SCAFFOLDING SHALL COMPLY WITH CHAPTER # 33 OF THE NYC CODE 2022, NO CHANGES IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01020522-I1
12/09/2025
Signed off — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE NYC CODE 2022, NO CHANGES IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00971974-I1
11/18/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/10/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/21/2025
Permit issued — General Construction
M01249436-I1-GC
08/05/2025
Filed — Alteration
Replacement of 275 sf of face brick at upper portion of building facade.
M01249436-I1
07/31/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
07/31/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/28/2025
Special inspection requirement — Maintenance information
JONAR MADRIAGA
07/28/2025
Special inspection requirement — Sprinkler Systems
JONAR MADRIAGA
07/28/2025
Special inspection requirement — Energy Code Compliance Inspections
JONAR MADRIAGA
07/28/2025
Special inspection requirement — HVAC-R and service water heating equipment
JONAR MADRIAGA
07/24/2025
Filed — Alteration
APPLICATION IS FILED FOR THE INSTALLATION OF NEW SPRINKLER HEADS (3) WITH SERVICE FROM EXISTING SPRINKLER SYSTEM; AND FOR THE INSTALLATION OF NEW GAS EQUIPMENT AND PIPING AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M00573828-P2
07/10/2025
Permit issued — General Construction
M00455898-I1-GC
07/01/2025
Special inspection requirement — Fire-Resistance Rated Construction
David Katz
07/01/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
David Katz
07/01/2025
Special inspection requirement — Masonry
David Katz
07/01/2025
Special inspection requirement — Tenant Protection Plan Compliance
David Katz
07/01/2025
Special inspection requirement — Final
David Katz
06/17/2025
Permit issued — Sprinklers
M00573828-I1-PL
04/21/2025
Signed off — Alteration
Gas work being done in the cellar. No change to use, egress or occupancy.
M00864492-I1
04/03/2025
Permit issued — Plumbing
M00437131-I1-PL
03/25/2025
Permit issued — Supported Scaffold
M01020522-I1-SF
02/19/2025
Special inspection requirement — Sprinkler Systems
JONAR MADRIAGA
02/19/2025
Special inspection requirement — Energy Code Compliance Inspections
JONAR MADRIAGA
02/19/2025
Special inspection requirement — HVAC-R and service water heating equipment
JONAR MADRIAGA
02/19/2025
Special inspection requirement — Maintenance information
JONAR MADRIAGA
12/04/2024
Permit issued — Sidewalk Shed
M00971974-I1-SH
09/20/2024
Filed — Alteration
Gas work being done in the cellar. No change to use, egress or occupancy.
M00864492-P1
03/28/2024
Permit issued — Supported Scaffold
M01020522-I1-SF
03/27/2024
Filed — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE NYC CODE 2022, NO CHANGES IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00971974-P1
03/26/2024
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. PIPE SCAFFOLDING SHALL COMPLY WITH CHAPTER # 33 OF THE NYC CODE 2022, NO CHANGES IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01020522-I1
03/20/2024
Filed — Alteration
Gas work being done in the cellar. No change to use, egress or occupancy.
M00864492-I1
12/07/2023
Permit issued — Sidewalk Shed
M00971974-I1-SH
12/06/2023
Filed — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE NYC CODE 2022, NO CHANGES IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00971974-I1
11/15/2023
Violation issued (HPD, closed)
I
04/26/2023
Signed off — Alteration
Replace existing units on roof. No change in use egress or occupancy.
M00742725-I1
04/25/2023
Signed off — Alteration
Plumbing work in conjunction with alteration. No change in use egress or occupancy.
M00743428-I1
04/25/2023
Signed off — Alteration
Renovation of Apartment 8SE
M00742666-I1
04/10/2023
Filed — Alteration
Plumbing work in conjunction with alteration. No change in use egress or occupancy.
M00743428-P2
03/15/2023
Violation issued (HPD, closed)
A
01/19/2023
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
01/10/2023
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
12/29/2022
Filed — Alteration
Plumbing work in conjunction with alteration. No change in use egress or occupancy.
M00743428-P1
12/08/2022
Inspection — Fail-Final PL - Up to 9 Requested Floors
Fail
View inspection ↗
11/02/2022
Violation issued (HPD, closed)
I
10/18/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
09/30/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/21/2022
Permit issued — Plumbing
M00573828-I1-EW-SP
09/21/2022
Permit issued — Plumbing
M00573828-I1-PL
09/02/2022
Cycle 9 facade report signed — SWARMP
08/30/2022
Permit issued — Mechanical Systems
M00742725-I1-MS
08/29/2022
Permit issued — Plumbing
M00743428-I1-PL
07/27/2022
Objection resolved — Addressed
Latest 60 of 177 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PLATINUM SERVICES NY1107/08/2026
ABC REALTY304/09/2026
KELLOGG PROPERTIES1303/22/2026
MURRAY ST REALTY ASSOCS1103/22/2026
MURRAY ST REALTY ASSOC LTD LL6003/22/2026
MURRARY ST. ASSOC.403/22/2026
MURRAY STREET REAL ESTATE LLP503/21/2026
THE FRANKLIN CONDO.C/OABC REALTY403/21/2026
MURRAY ST. REALITY ASSOC.LTD,LLP403/21/2026
9 MURRAY STREET103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PLATINUM SERVICES NY403/21/2026
J CALLAHAN CONSULTING1003/21/2026
M W EXPEDITING603/21/2026
NEW YORK DESIGN ARHICTECTS1003/21/2026
DOMANI CONSULTING103/21/2026
ARINNITY NYC103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PLATINUM SERVICES NY LLCGeneral Contractor407/08/2026
AURA PLUMBING INCPlumbing407/08/2026
GERLAK CONSTRUCTION INCGeneral Contractor303/21/2026
BLAZE PLUMBING & HEATINGPlumbing207/08/2026
LIONHEART CONSTRUCTION COGeneral Contractor207/08/2026
PANKO MC LLCGeneral Contractor107/08/2026
REGAL RESTORATION USA LLCGeneral Contractor104/09/2026
A&H EXPRESS PLBG&HTG CORPPlumbing107/08/2026
AMN PLUMBING CORPPlumbing107/08/2026
HYDROKINETIC PLBG & HTG IPlumbing107/08/2026
ATN ELECTRIC CORPElectrical103/22/2026
ORBIT PLBG & HTG INCPlumbing107/08/2026
RND ELECTRIC CORPElectrical103/22/2026
A PLUS PLUMBING CORPFire Protection107/08/2026
ORBIT SPRINKLER CORPFire Protection107/08/2026
ABC REMODELING CORPGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
KATZ ARCHITECTURE1371108/05/2025
OUTSOURCE SPECIAL INSPECT2827607/24/2025
BERGMAN CONSULTING ENGINE253206/09/2022
KCE CONSULTING ENGINEERIN3712106/09/2022
ARCO ENGINEERING PC3769109/11/2020
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedA&H EXPRESS PLBG&HTG CORP06/08/2026
DOB NOWPlumbingSigned-offA PLUS PLUMBING CORP03/19/2026
DOB NOWGeneral ConstructionSigned-offREGAL RESTORATION USA LLC08/21/2025
DOB NOWGeneral ConstructionSigned-offABC REMODELING CORP07/10/2025
DOB NOWSprinklersSigned-offBLAZE PLUMBING & HEATING06/17/2025
DOB NOWPlumbingPermit IssuedBLAZE PLUMBING & HEATING04/03/2025
DOB NOWSupported ScaffoldSigned-offPLATINUM SERVICES NY LLC03/25/2025
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC12/04/2024
DOB NOWSupported ScaffoldSigned-offPLATINUM SERVICES NY LLC03/28/2024
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC12/07/2023
DOB NOWPlumbingSigned-offAURA PLUMBING INC09/21/2022
DOB NOWPlumbingSigned-offAURA PLUMBING INC09/21/2022
DOB NOWMechanical SystemsSigned-offPANKO MC LLC08/30/2022
DOB NOWPlumbingSigned-offAMN PLUMBING CORP08/29/2022
DOB NOWGeneral ConstructionSigned-offGERLAK CONSTRUCTION INC07/21/2022
DOB NOWSprinklersSigned-offORBIT SPRINKLER CORP03/03/2022
DOB NOWSprinklersSigned-offAURA PLUMBING INC09/24/2021
DOB NOWSprinklersSigned-offAURA PLUMBING INC09/24/2021
DOB NOWGeneral ConstructionSigned-offLIONHEART CONSTRUCTION CO07/29/2021
DOB NOWGeneral ConstructionSigned-offLIONHEART CONSTRUCTION CO04/16/2021
DOB NOWPlumbingPermit IssuedORBIT PLBG & HTG INC12/22/2020
DOB NOWPlumbingSigned-offHYDROKINETIC PLBG & HTG I11/09/2020
BISPLISSUEDAURA PLUMBING INC04/21/2022
BISSPISSUEDGERARD'S PLBG & HTG CORP01/28/2022
BISSPISSUEDROBERT PARCHMENT P & H01/27/2021
BISPLISSUEDACE CONTRACTING, INC01/14/2021
BISOTISSUEDGALLERY RESTORATION LTD11/01/2020
BISSPISSUEDGERARD'S PLBG & HTG CORP10/16/2020
BISOTISSUEDK.O. TECHNOLOGIES INC07/09/2020
BISOTISSUEDK.O. TECHNOLOGIES INC07/09/2020
BISMHISSUEDMEC-CON ASSOCIATES INC03/09/2020
BISSPISSUEDGERARD'S PLBG & HTG CORP10/21/2019
BISOTISSUEDK.O. TECHNOLOGIES INC05/24/2019
BISOTISSUEDK.O. TECHNOLOGIES INC05/24/2019
BISMHISSUEDROYAL HVAC SYSTEMS INC03/14/2019
BISMHISSUEDMEC-CON ASSOCIATES INC02/26/2019
BISSPISSUEDGERARD'S PLBG & HTG CORP10/31/2018
BISPLISSUEDACE CONTRACTING, INC10/29/2018
BISOTISSUEDK.O. TECHNOLOGIES INC10/24/2018
BISPLISSUEDM C M PLBG & HTG, INC09/27/2018
+ 32 more permits on file
▾Field Inspections (DOB CAP) — 14
DateTypeResultReport
04/28/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/18/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/10/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/31/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/31/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/19/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
01/10/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
12/08/2022Fail-Final PL - Up to 9 Requested FloorsFailView ↗
10/18/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/30/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/17/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/15/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/12/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/08/2021Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
07/28/2025Maintenance informationJONAR MADRIAGAenergy_progress
07/28/2025Sprinkler SystemsJONAR MADRIAGAspecial
07/28/2025Energy Code Compliance InspectionsJONAR MADRIAGAprogress
07/28/2025HVAC-R and service water heating equipmentJONAR MADRIAGAenergy_progress
07/01/2025Fire-Resistance Rated ConstructionDavid Katzprogress
07/01/2025Structural Stability – Alterations of existing buildingsDavid Katzspecial
07/01/2025MasonryDavid Katzspecial
07/01/2025Tenant Protection Plan ComplianceDavid Katzspecial
07/01/2025FinalDavid Katzprogress
02/19/2025Sprinkler SystemsJONAR MADRIAGAspecial
02/19/2025Energy Code Compliance InspectionsJONAR MADRIAGAprogress
02/19/2025HVAC-R and service water heating equipmentJONAR MADRIAGAenergy_progress
02/19/2025Maintenance informationJONAR MADRIAGAenergy_progress
05/20/2022FinalBRYAN NATINSKYprogress
05/20/2022Fire-Resistant Penetrations and JointsJACOB BERGMANspecial
05/20/2022Fire-Resistance Rated ConstructionJACOB BERGMANprogress
05/08/2022Energy Code Compliance InspectionsJONAR MADRIAGAprogress
05/08/2022Maintenance informationJONAR MADRIAGAenergy_progress
05/08/2022HVAC-R and service water heating equipmentJONAR MADRIAGAenergy_progress
05/08/2022Sprinkler SystemsJONAR MADRIAGAspecial
09/17/2021Structural Stability – Alterations of existing buildingsJONAR MADRIAGAspecial
09/17/2021Energy Code ComplianceJONAR MADRIAGAprogress
09/17/2021FinalJONAR MADRIAGAprogress
09/17/2021Mastic and Intumescent Fire-resistant Coatings—special
09/17/2021Fire-Resistant Penetrations and JointsJONAR MADRIAGAspecial
Latest 25 of 26.
▾Documents — 1,094 on file (BIS + DOB NOW)
▸Plans & Drawings19
▸DOB NOWPlans/Sketch14
09/02/2026M00743428-P2Request digital key ↗
09/02/2026M00743428-P1Request digital key ↗
08/27/2026M01020522-I1Request digital key ↗
Showing 3 of 14 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
09/04/2026M00379313-I1Request digital key ↗
09/04/2026M00437131-I1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction2
09/04/2026M00455898-I1Request digital key ↗
09/04/2026M00455898-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
09/04/2026M00385430-I1Request digital key ↗
▸Applications & Permits205
▸BISPLAN / WORK APPROVAL APPLICATION120
03/07/2025103093938Open ↗
03/05/2025103093938Open ↗
08/07/2024103093938Open ↗
Showing 3 of 120 on file for this type
▸BISWORK PERMIT APPLICATION81
04/22/2022104100036Open ↗
01/27/2021140661969Open ↗
11/01/2020140925337Open ↗
Showing 3 of 81 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION3
08/02/2023122403504Open ↗
11/21/2022103093938Open ↗
09/23/2020140925337Open ↗
▸BISEQUIPMENT (EQ) PERMITS1
01/31/2022123236033Open ↗
▸Zoning, Tax Lot & Property Records6
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP3
03/13/2024103331592Open ↗
03/13/2024103451337Open ↗
03/22/2023122403504Open ↗
▸BISVERIFY TAX LOT3
03/13/2024103331592Open ↗
03/13/2024103451337Open ↗
12/21/2022122403504Open ↗
▸Seals & Professional Certifications169
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION91
03/05/2020140779236Open ↗
03/05/2020140779236Open ↗
03/05/2020140779236Open ↗
Showing 3 of 91 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature19
09/04/2026M00379313-I1Open ↗
09/04/2026M00455898-I1Open ↗
09/02/2026M00742666-I1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWProgress Inspector Seal & Signature15
09/02/2026M00455898-P1Open ↗
09/02/2026M00455898-P1Open ↗
08/31/2026M01249436-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/02/2026M00455898-P1Open ↗
09/02/2026M00455898-P1Open ↗
08/31/2026M01249436-I1Open ↗
Showing 3 of 10 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY5
09/23/2020140925337Open ↗
Showing 1 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE4
09/23/2020140925337Open ↗
Showing 1 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISPROFESSIONAL/OWNER SIGNATURES1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment134
▸BISEQUIPMENT USE PERMITS28
05/02/2022140599458Open ↗
02/07/2022123236033Open ↗
02/07/2022123236033Open ↗
Showing 3 of 28 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE28
03/24/2020123236033Open ↗
Showing 1 of 28 on file for this type
▸BISSCHEDULE B - PLUMBING26
12/04/2021140599458Open ↗
08/18/2021123236033Open ↗
03/18/2021123236033Open ↗
Showing 3 of 26 on file for this type
▸BISSELF-CERT PLUMBING NOTICE22
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 22 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT16
05/02/2022140599458Open ↗
02/07/2022123236033Open ↗
02/01/2022140599458Open ↗
Showing 3 of 16 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA6
12/18/2020123404869Open ↗
06/24/2020123552048Open ↗
Showing 2 of 6 on file for this type
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION5
08/07/2024102959176Open ↗
03/13/2024102084254Open ↗
03/13/2024103451337Open ↗
Showing 3 of 5 on file for this type
▸BISSPRINKLER INSP REPORT : FP-852
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISCO/SMOKE DETECTOR LETTER1
01/23/2023122403504Open ↗
▸Safety & Tenant Protection18
▸BISTenant Protection Plan and Notes15
09/23/2020140925337Open ↗
03/14/2025103093938Open ↗
Showing 2 of 15 on file for this type
▸DOB NOWTenant Protection Plan3
08/13/2026M00379313-I1Open ↗
08/13/2026M00437131-I1Open ↗
08/13/2026M00385430-I1Open ↗
▸Environmental & Asbestos51
▸BISASBESTOS: CERTIFICATION (DEP ACP5)23
09/23/2020140925337Open ↗
Showing 1 of 23 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report16
09/04/2026M00379313-I1Open ↗
09/04/2026M00455898-I1Open ↗
09/02/2026M00743428-P1Open ↗
Showing 3 of 16 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISASBESTOS-EXEMPTION (ASB4)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance78
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS33
03/05/2020140779236Open ↗
03/05/2020140779236Open ↗
Showing 2 of 33 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS18
05/02/2022140599458Open ↗
04/19/2022140599458Open ↗
03/04/2022140599458Open ↗
Showing 3 of 18 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY15
05/02/2022140599458Open ↗
04/19/2022140599458Open ↗
03/04/2022140599458Open ↗
Showing 3 of 15 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS3
09/23/2020140925337Open ↗
Showing 1 of 3 on file for this type
▸BISTECHNICAL REPORT: ENERGY3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)3
12/21/2022122403504Open ↗
12/14/2021123236033Open ↗
03/08/2021140925337Open ↗
▸BISTR8: Energy Code Progress Inspections2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00573828-I1Open ↗
▸Inspections & Test Reports41
▸BISTECHNICAL REPORT: RESPONSIBILITY37
06/22/2022104717077Open ↗
06/22/2022104717077Open ↗
05/25/2022104100036Open ↗
Showing 3 of 37 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISMECHANICAL SYSTEMS1
12/14/2021123236033Open ↗
▸BISSTRUCTURAL STABILITY - EXISTING BUILDINGS1
12/13/2021123236033Open ↗
▸BISHYDRAULIC FLOW CALCULATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs111
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST64
06/29/2022104717077Open ↗
05/26/2022104100036Open ↗
05/03/2022140599458Open ↗
Showing 3 of 64 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE21
03/07/2025103093938Open ↗
03/05/2025103093938Open ↗
12/22/2022102959176Open ↗
Showing 3 of 21 on file for this type
▸BISADMINISTRATIVE OBJECTIONS14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISSUPERSEDING LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISMECHANICAL (MH) SIGNOFF2
04/04/2025103451337Open ↗
09/05/2023103093938Open ↗
▸Cost, Insurance & Ownership82
▸BISCOST AFFIDAVIT74
05/02/2022140599458Open ↗
04/19/2022140599458Open ↗
03/04/2022140599458Open ↗
Showing 3 of 74 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW38
03/16/2024103451337Open ↗
03/16/2024102084254Open ↗
12/21/2022122403504Open ↗
Showing 3 of 8 on file for this type
▸Filing & Intake Forms142
▸BISADDITIONAL INFORMATION55
08/11/2025102959176Open ↗
01/04/2023102959176Open ↗
12/19/2022122403504Open ↗
Showing 3 of 55 on file for this type
▸BISBOROUGH INTAKE FORM45
04/06/2020102084254Open ↗
03/24/2020123236033Open ↗
03/05/2020140779236Open ↗
Showing 3 of 45 on file for this type
▸BISEFILING COVER SHEET34
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 34 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET8
09/23/2020140925337Open ↗
Showing 1 of 8 on file for this type
▸Other Documents5
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISCOFO-OBJ-NEED-CORRECT-SCHEDULE A-LOTS-ERROR-ON-SCHEDULE A.1
08/11/2025102959176Open ↗
▸BISAMEND SCHEDULE A TO INCLUDE THE ROOF. DEMONSTRATE ROOF RECREATIONAL AREA SIZED 30% GFA+ 1,500 SF PER ZR 15-12,111-40.1
03/26/2025103093938Open ↗