← Back
BuildNYC
Bungalow colony - cooperatively owned land
Breezy Point Cooperative
9 UTICA WALK · BIN 4466673
💬 Discuss this project
1938Year Built
1Stories
A8Building Class
R4Zoning
1,600,000 sfGross Floor Area
1,906Units
LL97 Covered59 Active Violations 1 unresolved · 58 paperwork only ▸FDNY Report ↗
Bungalow colony - cooperatively owned land · Owner of record: Breezy Point Cooperative · 12,253,428 sf lot · 0.13 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire Protection
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof2p · 2 filings · 20 docs
Attic10p · 1 filing · 20 docs
Floor 310p · 1 filing · 20 docs
Floor 212p · 1 filing · 20 docs
Floor 110p · 1 filing · 20 docs
Site & exterior26p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Breezy Point Cooperative2907/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Bungalow Design & Engineering810/31/2025
Parker and West Engineering103/18/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Sunrun103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Sand-Bar ContractorsGeneral Contractor404/09/2026
Sunrun Installation ServiceGeneral Contractor203/21/2026
Sand-Bar ContractorsScaffold203/21/2026
Sunrun Solar ElectlElectrical103/22/2026
Malbro Construction ServicesGeneral Contractor107/08/2026
Joseph O'Grady P & HPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Bungalow Design & Engineering4105610/31/2025
Parker and West Engineering5272103/18/2024
Building Lifecycle
All (66)Filed (9)Permit Issued (7)Signed Off (5)Inspection (7)Objection (8)Special Inspection (30)
04/08/2026
Signed off — New Building
New plumbing work associated with NB Q00827181
Q00827181-I1
03/20/2026
Signed off — New Building
New plumbing work associated with NB Q00827181
Q00827181-S1
03/12/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/19/2025
Special inspection requirement — Fire-Resistance Rated Construction
Deidre Duffy
11/19/2025
Special inspection requirement — Interior lighting power
Deidre Duffy
11/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Deidre Duffy
11/19/2025
Special inspection requirement — Structural Wood Frame
Deidre Duffy
11/19/2025
Special inspection requirement — HVAC-R and service water heating system controls
Deidre Duffy
11/19/2025
Special inspection requirement — Fenestration areas
Deidre Duffy
11/19/2025
Special inspection requirement — Concrete - Cast-In-Place
Deidre Duffy
11/19/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Deidre Duffy
11/19/2025
Special inspection requirement — Final
Deidre Duffy
11/19/2025
Special inspection requirement — Lowest Floor Elevation
Deidre Duffy
11/19/2025
Special inspection requirement — Maintenance information
Deidre Duffy
11/19/2025
Special inspection requirement — Fenestration air leakage
Deidre Duffy
11/19/2025
Special inspection requirement — HVAC-R and service water heating equipment
Deidre Duffy
11/19/2025
Special inspection requirement — Ventilation and air distribution system
Deidre Duffy
11/19/2025
Special inspection requirement — Construction Utilizing CLT or SCL, Type IV
Deidre Duffy
11/19/2025
Special inspection requirement — Subgrade Inspections
Deidre Duffy
11/19/2025
Special inspection requirement — Heating Systems
Deidre Duffy
11/19/2025
Special inspection requirement — Wood – Prefabricated I-Joists
Deidre Duffy
11/19/2025
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
Deidre Duffy
11/19/2025
Special inspection requirement — Mechanical Systems
Deidre Duffy
11/19/2025
Special inspection requirement — Footing and Foundation
Deidre Duffy
11/19/2025
Special inspection requirement — Energy Code Compliance Inspections
Deidre Duffy
11/19/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Deidre Duffy
11/19/2025
Special inspection requirement — Air barrier — testing
Deidre Duffy
11/19/2025
Special inspection requirement — Air barrier - visual inspection
Deidre Duffy
11/19/2025
Special inspection requirement — Permanent certificate
Deidre Duffy
11/19/2025
Special inspection requirement — Metering
Deidre Duffy
11/19/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Deidre Duffy
11/19/2025
Special inspection requirement — Insulation placement and R values
Deidre Duffy
10/31/2025
Filed — New Building
New plumbing work associated with NB Q00827181
Q00827181-P7
10/29/2025
Special inspection requirement — HVAC-R and service water heating system controls
Deidre Duffy
10/17/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/09/2024
Permit issued — Structural
Q00827181-I1-MS
10/09/2024
Permit issued — Foundation
Q00827181-I1-ST
09/23/2024
Signed off — New Building
New plumbing work associated with NB Q00827181
Q00827181-S2
07/09/2024
Filed — New Building
New plumbing work associated with NB Q00827181
Q00827181-P6
06/28/2024
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01018040-I1
06/14/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/31/2024
Objection resolved — Addressed
05/30/2024
Objection raised — Energy
05/30/2024
Objection resolved — Addressed
05/30/2024
Objection raised — Energy
05/17/2024
Filed — New Building
New plumbing work associated with NB Q00827181
Q00827181-P2
05/17/2024
Filed — New Building
New plumbing work associated with NB Q00827181
Q00827181-P1
03/22/2024
Permit issued — Solar
Q01018040-I1-SL
03/18/2024
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01018040-I1
12/20/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
12/20/2023
Inspection — Certified Sprinkler (PL)-SP-Fixtures (PL)-Finish
Certified
View inspection ↗
12/20/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/20/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
11/29/2023
Permit issued — Plumbing
Q00827181-S1-PL
10/16/2023
Permit issued — Mechanical Systems
Q00827181-I1-GC-CX
10/13/2023
Signed off — Full Demolition
HAND DEMOLITION OF 1-STORY RESIDENTIAL BUILDING.
Q00878415-I1
10/03/2023
Permit issued — Full Demolition
Q00878415-I1-FD
09/19/2023
Permit issued — Construction Fence
Q00827181-S2-FN
06/05/2023
Filed — Full Demolition
HAND DEMOLITION OF 1-STORY RESIDENTIAL BUILDING.
Q00878415-I1
05/31/2023
Filed — New Building
New plumbing work associated with NB Q00827181
Q00827181-S2
Latest 60 of 66 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offSand-Bar Contractors10/09/2024
DOB NOWFoundationSigned-offSand-Bar Contractors10/09/2024
DOB NOWSolarSigned-offSunrun Installation Service03/22/2024
DOB NOWPlumbingSigned-offJoseph O'Grady P & H11/29/2023
DOB NOWMechanical SystemsPermit IssuedSand-Bar Contractors10/16/2023
DOB NOWFull DemolitionSigned-offMalbro Construction Services10/03/2023
DOB NOWConstruction FenceSigned-offSand-Bar Contractors09/19/2023
1 project · most recent 10/31/2025
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
10/31/2025Signed-offSand-Bar ContractorsAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Trane TRANE 4TTR4036N1000B AND 4TTR4024N1000A 3 tons · Condensing Unit ×2
Heating
Trane Furnace #1 - Trane S8X1B060MP4PSCA, Furnace #2 - S8X1B080MP4PSCA 140,000 BTU · Furnace ×2
Ventilation
Panasonic WhisperGreen FV-0511VKS2 200 CFM · Erv ×1
1 project · most recent 10/31/2025
Gas Plumbing-Sprinkler Water/Sanitary
FiledStatusContractorScope
10/31/2025Signed-offJoseph O'Grady P & HGas, Plumbing-Sprinkler, Water/Sanitary
2 projects · most recent 03/18/2024
General Wiring
FiledStatusContractorScope
03/18/2024CompleteSunrun Solar Electl—
12/08/2023CompleteG.E.O. ElectricGeneral Wiring
1 project · most recent 10/31/2025
Wood
FiledStatusContractorScope
10/31/2025Signed-offSand-Bar ContractorsWood
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
03/12/2026Pass-Final CND-Occupancy InspectionPassView ↗
10/17/2024Pass-Final CND-Occupancy InspectionPassView ↗
06/14/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/20/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/20/2023Certified Sprinkler (PL)-SP-Fixtures (PL)-FinishCertifiedView ↗
12/20/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/20/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 116
DateRequirementInspectorRole
11/19/2025Construction Utilizing CLT or SCL, Type IVDeidre Duffyspecial
11/19/2025Interior lighting powerDeidre Duffyenergy_progress
11/19/2025Fenestration areasDeidre Duffyenergy_progress
11/19/2025Ventilation and air distribution systemDeidre Duffyenergy_progress
11/19/2025Insulation placement and R valuesDeidre Duffyenergy_progress
11/19/2025HVAC-R and service water heating equipmentDeidre Duffyenergy_progress
11/19/2025Fenestration and door U-factor and product ratingsDeidre Duffyenergy_progress
11/19/2025MeteringDeidre Duffyenergy_progress
11/19/2025HVAC-R and service water heating system controlsDeidre Duffyenergy_progress
11/19/2025Fenestration air leakageDeidre Duffyenergy_progress
11/19/2025Permanent certificateDeidre Duffyenergy_progress
11/19/2025Air barrier - visual inspectionDeidre Duffyenergy_progress
11/19/2025Maintenance informationDeidre Duffyenergy_progress
11/19/2025Air barrier — testing Deidre Duffyenergy_progress
11/19/2025HVAC-R and service water piping design and insulationDeidre Duffyenergy_progress
11/19/2025Fire-Resistance Rated ConstructionDeidre Duffyprogress
11/19/2025Structural Wood FrameDeidre Duffyprogress
11/19/2025Lowest Floor ElevationDeidre Duffyprogress
11/19/2025Energy Code Compliance InspectionsDeidre Duffyprogress
11/19/2025Footing and FoundationDeidre Duffyprogress
11/19/2025FinalDeidre Duffyprogress
11/19/2025Mechanical SystemsDeidre Duffyspecial
11/19/2025Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)Deidre Duffyspecial
11/19/2025Fire-Resistant Penetrations and JointsDeidre Duffyspecial
11/19/2025Subsurface Investigations (Borings/Test Pits)Deidre Duffyspecial
Latest 25 of 116.
▾Documents — 110 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/25/2026Q00827181-S1Request digital key ↗
08/25/2026Q00827181-S2Request digital key ↗
08/25/2026Q00827181-P6Request digital key ↗
Showing 3 of 9 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZD1: DOB Zoning Diagram3
08/14/2026Q00827181-I1Open ↗
08/13/2026Q00827181-P2Open ↗
08/13/2026Q00827181-P7Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/14/2026Q00827181-I1Open ↗
▸Seals & Professional Certifications66
▸DOB NOWSpecial Inspector Seal & Signature30
08/31/2026Q00827181-P6Open ↗
08/28/2026Q00827181-S1Open ↗
08/26/2026Q00827181-P7Open ↗
Showing 3 of 30 on file for this type
▸DOB NOWProgress Inspector Seal & Signature27
08/31/2026Q00827181-P6Open ↗
08/31/2026Q00827181-P6Open ↗
08/28/2026Q00827181-S1Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/25/2026Q00827181-P7Open ↗
08/25/2026Q00827181-I1Open ↗
08/25/2026Q00827181-S1Open ↗
Showing 3 of 9 on file for this type
▸Trade Schedules & Equipment4
▸DOB NOWGas Cut-Off1
08/13/2026Q00878415-I1Open ↗
▸DOB NOWElectric Cut-Off1
08/13/2026Q00878415-I1Open ↗
▸DOB NOWWater Cut-Off1
08/13/2026Q00878415-I1Open ↗
▸DOB NOWSewer Cut-Off1
08/13/2026Q00878415-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/23/2026Q01018040-I1Open ↗
08/13/2026Q00878415-I1Open ↗
▸DOB NOWRodent Control1
08/13/2026Q00878415-I1Open ↗
▸Inspections & Test Reports7
▸DOB NOWGeotechnical Report (BC 1803.6)3
08/14/2026Q00827181-I1Open ↗
08/13/2026Q00827181-P2Open ↗
08/13/2026Q00827181-P7Open ↗
▸DOB NOWSOIL REPORT3
08/14/2026Q00827181-I1Open ↗
08/13/2026Q00827181-P2Open ↗
08/13/2026Q00827181-P7Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/14/2026Q00827181-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01018040-I1Open ↗
▸Other Documents16
▸DOB NOWProperty Ownership Certification4
08/25/2026Q00827181-P7Open ↗
08/14/2026Q00827181-P2Open ↗
08/14/2026Q00827181-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/14/2026Q00827181-I1Open ↗
08/13/2026Q00827181-P2Open ↗
08/13/2026Q00827181-P7Open ↗
▸DOB NOWSite Survey: Initial3
08/14/2026Q00827181-I1Open ↗
08/13/2026Q00827181-P2Open ↗
08/13/2026Q00827181-P7Open ↗
▸DOB NOWFEMA Elevation Certificate (086-0-33)/Flood Proofing Certificate (086-0-34)1
08/14/2026Q00827181-I1Open ↗
▸DOB NOWStructure Photographs1
08/13/2026Q00878415-I1Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
08/13/2026Q00878415-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/14/2026Q00827181-I1Open ↗
▸DOB NOWCommunity Board Notification1
08/13/2026Q00878415-I1Open ↗
▸DOB NOWFinal Survey1
08/14/2026Q00827181-I1Open ↗