RoofUnder Construction3p · 2 filings · 20 docs
ArchitectureStructural
Issued Permit Scope
General Construction
Work includes per filed plans remove/replace cracked stone coping, repair stone panels/copings, sealant joint restoration, replace damaged veneer anchors, repair stucco wall finish, brick replacement, brick stitching repair, brick corner reconstruction.
On file for this project
3 documents · 1 drawing sheet
Filing herewith modification to the existing sprinkler and standpipe system as per plans filed herewith. Marketing Floors: 9,10,11,41,42, Construction Floors: 8,9,10,40,41. No change to use, egress or occupancy.
On file for this project
21 documents · 1 drawing sheet
BulkheadUnder Construction1p · 1 filing · 10 docs
Structural
Suspended Scaffold for Facade Restoration & Inspection as Shown on Plans
On file for this project
10 documents · 1 drawing sheet
Floor 512p · 1 filing · 3 docs
Mechanical
MECHANICAL MODIFICATIONS TAKING PLACE ON 50TH FLOOR CONSTRUCTION (51ST MARKETING) AS PER PLANS FILED HEREWITH. MECHANICAL FLOOR NO OCCUPANCY. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents · 2 drawing sheets
Floor 50Under Construction12p · 3 filings · 18 docs
GeneralMechanicalStructural
Issued Permit Scope
Mechanical Systems · Structural
GENERAL CONSTRUCTION TAKING PLACE ON 49TH FLOOR CONSTRUCTION (50TH FLOOR MARKETING) AS PER PLANS FILED HREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
5 documents · 1 drawing sheet
STRUCTURAL MODIFICATIONS TAKING PLACE ON 50TH FL CONSTRUCTION (51ST MARKETING) AS PER PLANS FILED HEREWITH. MECHANICAL FLOOR, NO OCCUPANCY. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
10 documents
MECHANICAL MODIFICATIONS TAKING PLACE ON 50TH FLOOR CONSTRUCTION (51ST MARKETING) AS PER PLANS FILED HEREWITH. MECHANICAL FLOOR NO OCCUPANCY. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents
Floor 49Under Construction5p · 3 filings · 10 docs
ArchitectureGeneralPlumbing
Issued Permit Scope
General Construction
GENERAL CONSTRUCTION TAKING PLACE ON 49TH FLOOR CONSTRUCTION (50TH FLOOR MARKETING) AS PER PLANS FILED HREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
5 documents
Modification to existing plumbing fixtures as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
3 documents · 1 drawing sheet
No filed description on record for this project.
On file for this project
2 documents · 1 drawing sheet
Floor 48Under Construction7p · 4 filings · 20 docs
ArchitectureFire ProtectionGeneral
Issued Permit Scope
General Construction · Sprinklers
GENERAL CONSTRUCTION TAKING PLACE ON 47TH FLOOR CONSTRUCTION (48TH FLOOR MARKETING) AS PER PLANS FILED HREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
5 documents · 1 drawing sheet
SPRINKLER MODIFICATIONS TAKING PLACE ON 48TH FLOOR CONSTRUCTION (49TH FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
7 documents
INTERIOR DEMOLITION OF NON-STRUCTURAL ELEMENTS ON THE 48TH FLOOR AS PER THE DESIGN DRAWINGS
On file for this project
12 documents · 2 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 47Under Construction30p · 4 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalStructural
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers · Structural
SPRINKLER MODIFICATIONS TAKING PLACE ON 47TH FLOOR CONSTRUCTION (48TH FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
5 documents
GENERAL CONSTRUCTION TAKING PLACE ON 47TH FLOOR CONSTRUCTION (48TH FLOOR MARKETING) AS PER PLANS FILED HREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
5 documents
Structural modifications including concrete on metal deck infill at existing stair opening. No change in use, egress or occupancy.
On file for this project
24 documents · 2 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 4623p · 6 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbing
Modification of sprinkler system
On file for this project
23 documents · 10 drawing sheets
GENERAL CONSTRUCTION TAKING PLACE ON 45TH FL CONSTRUCTION (46TH MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
6 documents · 2 drawing sheets
Modification to sprinkler system as shown on plans
On file for this project
3 documents · 2 drawing sheets
Latest 3 of 6 filings on this floor.
Floor 4513p · 6 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems
SPRINKLER MODIFICATIONS TAKING PLACE ON 45TH FL CONSTRUCTION (46TH FL MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents · 1 drawing sheet
PLUMBING MODIFICATIONS TAKING PLACE ON 45TH FL CONSTRUCTION (46TH MKT) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents · 1 drawing sheet
GENERAL CONSTRUCTION TAKING PLACE ON 45TH FL CONSTRUCTION (46TH MARKETING)AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents · 1 drawing sheet
Latest 3 of 6 filings on this floor.
Floor 44Under Construction5p · 5 filings · 20 docs
ArchitectureFire ProtectionMechanical
Issued Permit Scope
General Construction · Mechanical Systems
Project M01452794Permit Issued · 09/29/2026
GENERAL CONSTRUCTION TAKING PLACE ON 44TH FLOOR CONSTRUCTION (45TH FLOOR MARKETING) AS PER PLANS FILED HREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Project M01452799Permit Issued · 09/29/2026
MECHANICAL MODIFICATIONS TAKING PLACE ON 44TH FLOOR CONSTRUCTION (45TH FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
SPRINKLER MODIFICATIONS TAKING PLACE ON 44TH FLOOR CONSTRUCTION (45TH MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
4 documents · 2 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 439p · 7 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructuralOther
SPRINKLER MODIFICATIONS TAKING PLACE ON 44TH FLOOR CONSTRUCTION (45TH MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
8 documents · 1 drawing sheet
SPRINKLER MODIFICATIONS TAKING PLACE ON 42ND FLOOR CONSTRUCTION (43RD MKT) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
7 documents · 2 drawing sheets
PLUMBING MODIFICATIONS TAKING PLACE ON 42ND FLOOR CONSTRUCTION (43RD MKT) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
9 documents · 1 drawing sheet
Latest 3 of 7 filings on this floor.
Floor 4233p · 11 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Structural
GENERAL CONSTRUCTION TAKING PLACE ON 42ND FLOOR CONSTRUCTION (43RD MKT) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
10 documents · 2 drawing sheets
Filing herewith modification to the existing sprinkler and standpipe system as per plans filed herewith. Marketing Floors: 9,10,11,41,42, Construction Floors: 8,9,10,40,41. No change to use, egress or occupancy.
On file for this project
21 documents · 4 drawing sheets
Filing herewith Structural work as per plans filed herewith. Marketing Floors:10,11,41,42, Construction Floors:9,10,40,41. No change to use, egress or occupancy.
On file for this project
10 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 4127p · 6 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems
Filing herewith modification to the existing sprinkler and standpipe system as per plans filed herewith. Marketing Floors: 9,10,11,41,42, Construction Floors: 8,9,10,40,41. No change to use, egress or occupancy.
On file for this project
21 documents · 4 drawing sheets
Filing herewith Structural work as per plans filed herewith. Marketing Floors:10,11,41,42, Construction Floors:9,10,40,41. No change to use, egress or occupancy.
On file for this project
10 documents · 1 drawing sheet
Filing herewith mechanical work on the 10, 11 ,41 and 42 FLS. as per plans filed herewith. Construction Floors 9,10,40,41. Marketing Floors 10,11,41,42. No change to use, egress or occupancy.
On file for this project
22 documents · 2 drawing sheets
Latest 3 of 6 filings on this floor.
Floor 4013p · 5 filings · 20 docs
ArchitectureDMFire ProtectionPlumbingStructural
Modification/additions to existing sprinkler system on the 39th & 40th Floors. Installation of new pre-action sprinkler system on the 40th Floor as shown on drawings. No change in use, egress or occupancy.
On file for this project
4 documents · 1 drawing sheet
Modification to plumbing fixtures and related piping as shown on drawings. No change in use, egress or occupancy.
On file for this project
8 documents · 3 drawing sheets
Minor interior revisions to office space, removal of stair and expansion to men's restroom as show on drawings. No change in use, egress or occupancy.
On file for this project
6 documents · 8 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 392p · 2 filings · 12 docs
Fire ProtectionPlumbing
Modification/additions to existing sprinkler system on the 39th & 40th Floors. Installation of new pre-action sprinkler system on the 40th Floor as shown on drawings. No change in use, egress or occupancy.
On file for this project
4 documents · 1 drawing sheet
Modification to plumbing fixtures and related piping as shown on drawings. No change in use, egress or occupancy.
On file for this project
8 documents · 2 drawing sheets
Floor 38Under Construction45p · 6 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers
SPRINKLER MODIFICATIONS TAKING PLACE ON 37TH FLOOR CONSTRUCTION (38TH FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
2 documents · 1 drawing sheet
REMOVAL OF EXISTING PRIMARY AIR DUCTS, SECONDARY WATER RETURN RISERS, PERIMETER INDUCTION UNITS, SUPPLY AIR MAIN & DUCT; INSTALLATION OF VARIOUS EQUIPMENTS, DUCTS, LINES, FANS, UNITS, PIPING AS PER DESIGN DRAWINGS
On file for this project
27 documents · 10 drawing sheets
Modifications to the existing HVAC System; Installation of two new AC Units and associated ductwork as per plans (Artisan Partners - Interior Renovations.) No change to use, egress or occupancy.
On file for this project
8 documents · 2 drawing sheets
Latest 3 of 6 filings on this floor.
Floor 37128p · 13 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
REMOVAL OF EXISTING TEMP. SPRINKLER WITHIN LOBBY AREA OF 37TH FLOOR AND INSTALLATION OF NEW SPRINKLER SYSTEM AS PER DESIGN DRAWINGS
On file for this project
32 documents · 3 drawing sheets
Sprinkler work as shown on the plans.
On file for this project
21 documents · 11 drawing sheets
MODIFICATION OF EXISTING SPRINKLER SYSTEM ON PARTIAL 37TH FLOOR AS SHOWN IN DESIGN DRAWINGS
On file for this project
24 documents · 8 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 361p · 1 filing · 3 docs
Mechanical
Modification to HVAC ductwork and related piping as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this project
3 documents · 1 drawing sheet
Floor 35
Floor 3422p · 10 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbing
Modification to sprinkler system and related piping as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this project
8 documents · 1 drawing sheet
Modification to HVAC ductwork and related piping as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this project
8 documents · 4 drawing sheets
Modification to existing plumbing systems and installation of plumbing fixtures. No change to use, egress or occupancy.
On file for this project
3 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 334p · 2 filings · 8 docs
ArchitecturePlumbing
PLUMBING MODIFICATIONS TAKING PLACE AT 33RD FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents · 1 drawing sheet
GENERAL CONSTRUCTION TAKING PLACE ON 33RD FLOOR PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
5 documents · 3 drawing sheets
Floor 324p · 3 filings · 19 docs
Fire ProtectionPlumbingStructural
STRUCTURAL REFRAMING OF FLOOR TO ACCOMMODATE NEW CONVENIENCE STAIR OPENING AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
5 documents · 1 drawing sheet
STANDPIPE WORK CONSISTING OF THE INSTALLATION OF NEW FIRE HOSE CABINET AND RELATED PIPING IN CONJUNCTION WITH THE 32ND FLOOR INTERIOR MODIFICATION, AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents · 1 drawing sheet
FILING FOR INSTALLATION OF NEW PLUMBING FIXTURES, SPRINKLER HEADS AND RELATED PIPING AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
10 documents · 2 drawing sheets
Floor 3113p · 9 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingOther
Filing for plumbing work to accommodate the Veritas - 31st Floor Expansion as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this project
3 documents · 5 drawing sheets
Filing for modifications to the existing HVAC system and related duct work to accommodate the Veritas - 31st Floor Expansion as shown on drawings filed herewith. No change in use, egress or occupancy.
On file for this project
13 documents · 3 drawing sheets
Hereby filing application for Non Structural Interior Renovation portion of the 31st floor as per drawings.
On file for this project
18 documents · 3 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 30Under Construction5p · 3 filings · 14 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction
GENERAL CONSTRUCTION TAKING PLACE ON 30TH FL CONSTRUCTION (31ST MARKETING)AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
4 documents
Modification to existing Plumbing fixtures and Sprinkler system as per plans filed herewith
On file for this project
4 documents · 3 drawing sheets
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
6 documents · 2 drawing sheets
Floor 29Under Construction99p · 14 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
REMOVAL AND INSTALLATION OF INTERIOR NON-BEARING PARTITIONS AND RELATED FINISHES AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
5 documents · 4 drawing sheets
SPRINKLER MODIFICATIONS TAKING PLACE ON 29 FLOOR CONSTRUCTION (30 FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
8 documents
GENERAL CONSTRUCTION TAKING PLACE ON 29 FLOOR CONSTRUCTION (30 FLOOR MARKETING) AS PER PLANS FILED HREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
9 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 2823p · 7 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Sprinklers
Removal and installation of interior nonbearing partitions as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
6 documents · 1 drawing sheet
Removal and installation of interior nonbearing partitions as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
3 documents · 3 drawing sheets
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
13 documents · 2 drawing sheets
Latest 3 of 7 filings on this floor.
Floor 2713p · 12 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Sprinklers
REMOVAL AND INSTALLATION OF INTERIOR NON-BEARING PARTITIONS AND RELATED FINISHES AS PER DRAWINGS FILED HEREWITH. ADDITION OF ASSEMBLY OCCUPANCY, AND INCREASE IN FLOOR CAPACITY ON THE 27TH FLOOR.
On file for this project
8 documents · 2 drawing sheets
SPRINKLER MODIFICATIONS TAKING PLACE ON 26TH FLOOR CONSTRUCTION (27TH FLOOR MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
8 documents · 1 drawing sheet
GENERAL CONSTRUCTION TAKING PLACE ON 27TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
8 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 26Under Construction13p · 11 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction
GENERAL CONSTRUCTION TAKING PLACE ON 25TH FLOOR CONSTRUCTION (26TH FLOOR MARKETING) FOR CHANGE OF USE - OFFICE WITH ACCESSORY EXERCISE ROOM AND COMMERCIAL KITCHEN
On file for this project
10 documents
PLUMBING MODIFICATIONS TAKING PLACE ON 25TH FL CONSTRUCTION (26TH MKT) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
8 documents · 2 drawing sheets
REMOVAL AND INSTALLATION OF INTERIOR NON-BEARING PARTITIONS AND RELATED FINISHES AS PER DRAWINGS FILED HEREWITH. ADDITION OF ASSEMBLY OCCUPANCY, AND INCREASE IN FLOOR CAPACITY ON THE 27TH FLOOR.
On file for this project
8 documents
Latest 3 of 8 filings on this floor.
Floor 25Under Construction73p · 8 filings · 20 docs
ArchitectureCivilFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers
GENERAL CONSTRUCTION TAKING PLACE ON 25TH FLOOR CONSTRUCTION (26TH FLOOR MARKETING) AS PER PLANS FILED HREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
12 documents · 1 drawing sheet
GENERAL CONSTRUCTION TAKING PLACE ON 25TH FLOOR CONSTRUCTION (26TH FLOOR MARKETING) FOR CHANGE OF USE - OFFICE WITH ACCESSORY EXERCISE ROOM AND COMMERCIAL KITCHEN
On file for this project
10 documents
MECHANICAL MODIFICATIONS TAKING PLACE ON 25TH FL CONSTRUCTION (26TH FL MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents
Latest 3 of 8 filings on this floor.
Floor 2420p · 5 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Sprinklers
Modification to existing Plumbing fixtures, Sprinkler system, and Standpipe system as per plans filed herewith
On file for this project
12 documents · 7 drawing sheets
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
7 documents · 2 drawing sheets
Support of slab opening for new feature stair, and support of mechanical equipment .Approximate Linear footage: 280 ft.
On file for this project
3 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Floor 234p · 2 filings · 20 docs
ArchitectureGeneralStructural
MECHANICAL MODIFICATIONS TAKING PLACE ON 22ND FL CONSTRUCTION (23RD FL MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
18 documents · 1 drawing sheet
Removal and installation of interior nonbearing partitions as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
3 documents · 3 drawing sheets
Floor 224p · 2 filings · 15 docs
Architecture
GENERAL CONSTRUCTION TAKING PLACE ON 22ND FL CONSTRUCTION (23RD MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
12 documents · 2 drawing sheets
Filing herewith interior demolition and renovation as per plans filed herewith. Marketing Floors: 12 and 22. Construction Floors: 11 and 21. No change to use, egress, or occupancy.
On file for this project
3 documents · 2 drawing sheets
Floor 211p · 1 filing · 5 docs
Architecture
Filing herewith interior renovation of the 21st FL. (Construction FL.20, Marketing FL.21) as per plans filed herewith. No change to use, egress or occupancy.
On file for this project
5 documents · 1 drawing sheet
Floor 2010p · 4 filings · 20 docs
ArchitectureFire ProtectionMechanicalStructural
Sprinkler and standpipe work in conjunction with an interior fit-out. No change to use, egress, or occupancy.
On file for this project
12 documents · 2 drawing sheets
Mechanical work in conjunction with an interior fit-out as per plans filed. No change to use, egress, or occupancy.
On file for this project
12 documents · 1 drawing sheet
Alt 2 renovation of the office spaces at the 19th & 20th floors as per plans filed. No change to use, egress, or occupancy.
On file for this project
6 documents · 6 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 1911p · 5 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Sprinkler and standpipe work in conjunction with an interior fit-out. No change to use, egress, or occupancy.
On file for this project
12 documents · 2 drawing sheets
Installation of Core Restroom, Wellness, and Pantry piping and fixtures on the 19th & 20th floors. No change to use, egress, or occupancy.
On file for this project
6 documents · 1 drawing sheet
Mechanical work in conjunction with an interior fit-out as per plans filed. No change to use, egress, or occupancy.
On file for this project
12 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Floor 187p · 4 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbing
Removal and installation of interior non-bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy.
On file for this project
6 documents · 2 drawing sheets
Modification to existing HVAC system as per plans filed herewith. NO change in use, egress or occupancy.
On file for this project
14 documents · 1 drawing sheet
Modification to existing Sprinkler system & Additions / modifications to existing plumbing system as plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
8 documents · 6 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 1721p · 11 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Sprinklers
Modification to existing Sprinkler system & Additions / modifications to existing plumbing system as plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
8 documents · 3 drawing sheets
MECHCANICAL SYSTEMS WORK AS PER PLANS FILED HEREWITH.
On file for this project
9 documents · 1 drawing sheet
ARCHITECTURAL/GENERAL CONSTRUCTION AS PER PLANS FILED HEREWITH
On file for this project
6 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 161p · 1 filing · 4 docs
Fire Protection
No filed description on record for this project.
On file for this project
4 documents · 1 drawing sheet
Floor 152p · 2 filings · 20 docs
MechanicalStructural
Filing herewith mechanical work as per plans filed herewith (Construction FL. 13,14,15, Marketing FL.14,15,16). No change to use, egress or occupancy.
On file for this project
19 documents · 1 drawing sheet
Filing herewith structural work as per plans filed herewith. Marketing Floors:11,12,13,14. Construction Floors:10,11,12,13. No change to use, egress or occupancy.
On file for this project
10 documents · 1 drawing sheet
Floor 1411p · 8 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Filing herewith plumbing work as per plans filed herewith (Construction FL.14,15, Marketing FL.15,16). No change to use, egress or occupancy.
On file for this project
16 documents · 1 drawing sheet
Filing herewith mechanical work as per plans filed herewith (Construction FL. 13,14,15, Marketing FL.14,15,16). No change to use, egress or occupancy.
On file for this project
19 documents · 4 drawing sheets
Filing herewith modification to the sprinkler and standpipe system as per plans filed herewith. Marketing Floors: 11,13,14. Construction Floors: 10,12,13. No change to use, egress or occupancy.
On file for this project
8 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 135p · 5 filings · 18 docs
DMFire ProtectionMechanicalPlumbing
Filing herewith plumbing demo. work on the 13th FL.. as per plans filed herewith. Construction Floor:12, Marketing Floor:13. No change to use, egress or occupancy.
On file for this project
3 documents · 1 drawing sheet
Filing herewith plumbing work as per plans filed herewith. Marketing Floors: 12, 13, 14. Construction Floors: 11, 12, 13. No change to use, egress or occupancy.
On file for this project
3 documents · 1 drawing sheet
Filing herewith Mechanical work as per plans filed herewith. Marketing Floors: 12, 13, 14. Construction Floors: 11,12,13. No change to use, egress or occupancy.
On file for this project
5 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Floor 1212p · 8 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Filing herewith plumbing work as per plans filed herewith. Marketing FL.12 and 22, Construction FL.11 and 21. No change to use, egress or occupancy.
On file for this project
8 documents · 1 drawing sheet
Filing herewith modification to the existing sprinkler and standpipe system as per plans filed herewith. (Construction FL. 11, 21, Marketing FL. 12, 22). No change to use, egress or occupancy.
On file for this project
3 documents · 1 drawing sheet
Filing herewith interior demolition and renovation as per plans filed herewith. Marketing Floors: 12 and 22. Construction Floors: 11 and 21. No change to use, egress, or occupancy.
On file for this project
3 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 1128p · 9 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Structural
Filing herewith modification to the existing sprinkler and standpipe system as per plans filed herewith. Marketing Floors: 9,10,11,41,42, Construction Floors: 8,9,10,40,41. No change to use, egress or occupancy.
On file for this project
21 documents · 2 drawing sheets
Filing herewith plumbing work as per plans filed herewith. Marketing Floors: 12, 13, 14. Construction Floors: 11, 12, 13. No change to use, egress or occupancy.
On file for this project
3 documents · 1 drawing sheet
Filing herewith Structural work as per plans filed herewith. Marketing Floors:10,11,41,42, Construction Floors:9,10,40,41. No change to use, egress or occupancy.
On file for this project
10 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 1027p · 9 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems
Filing herewith mechanical work on the 10th FL. (Construction FL.:9, Marketing FL:10) as per plans filed herewith. No change to use, egress, or occupancy.
On file for this project
13 documents · 1 drawing sheet
Filing herewith modification to the existing sprinkler and standpipe system as per plans filed herewith. Marketing Floors: 9,10,11,41,42, Construction Floors: 8,9,10,40,41. No change to use, egress or occupancy.
On file for this project
21 documents · 2 drawing sheets
Filing herewith Structural work as per plans filed herewith. Marketing Floors:10,11,41,42, Construction Floors:9,10,40,41. No change to use, egress or occupancy.
On file for this project
10 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 9Under Construction32p · 8 filings · 20 docs
ArchitectureFire ProtectionPlumbingStructural
Issued Permit Scope
General Construction
Filing herewith interior demolition and renovation as per plan filed herewith (8th FL. Construction, 9th FL. Marketing). No change to use, egress or occupancy.
On file for this project
9 documents · 2 drawing sheets
Filing herewith Plumbing and Sprinkler work on the 10th FL. (Construction FL.:9, Marketing FL:10) as per plans filed herewith. No change to use, egress or occupancy.
On file for this project
7 documents · 1 drawing sheet
GENERAL CONSTRUCTION TAKING PLACE ON CELLAR FOR CHANGE OF USE AND INCREASE IN POPULATION
On file for this project
14 documents
Latest 3 of 8 filings on this floor.
Floor 86p · 4 filings · 20 docs
ArchitecturePlumbingStructural
Filing herewith interior demolition and renovation as per plans filed herewith. (Construction FL.7, Marketing FL.8) No change to use, egress, or occupancy.
On file for this project
5 documents · 1 drawing sheet
MODIFICATION TO EXISTING SPRINKLER & STANDPIPE SYSTEM AS PER PLANS FILED HEREWITH. INSTALLATION OF PRE-ACTION SPRINKLER SYSTEM WITH NEW HEADS. NO CHANGE IN USE, EGRESS OR OCCUPANCY
On file for this project
12 documents · 1 drawing sheet
MODIFICATION TO EXISTING PLUMBING SYSTEM AND RELATED FIXTURES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
6 documents · 3 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 715p · 6 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Filing herewith mechanical work as per plans filed herewith (Construction FL.7, Marketing FL.8). No change to use, egress or occupancy.
On file for this project
9 documents · 3 drawing sheets
Filing herewith modification to the existing Sprinkler System on the 7th FL. (Construction FL.6, Marketing FL.7) as per plans filed herewith. No change to use, egress or occupancy.
On file for this project
3 documents · 2 drawing sheets
Filing herewith mechanical work on the 7th FL. (Construction FL.:6, Marketing FL:7) as per plans filed herewith. No change to use, egress, or occupancy.
On file for this project
6 documents · 3 drawing sheets
Latest 3 of 6 filings on this floor.
Floor 621p · 1 filing · 20 docs
Architecture
Issued Permit Scope
General Construction
GENERAL CONSTRUCTION TAKING PLACE ON 26TH FLOOR CONSTRUCTION (27TH FLOOR MARKETING) FOR CHANGE OF USE AND POPULATION INCREASE.
On file for this project
30 documents
Floor 5Under Construction13p · 2 filings · 20 docs
Architecture
Issued Permit Scope
General Construction
MECHANICAL MODIFICATIONS TAKING PLACE ON CELLAR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents
GENERAL CONSTRUCTION TAKING PLACE ON 26TH FLOOR CONSTRUCTION (27TH FLOOR MARKETING) FOR CHANGE OF USE AND POPULATION INCREASE.
On file for this project
30 documents
Floor 423p · 3 filings · 20 docs
ArchitectureMechanical
Issued Permit Scope
General Construction
GENERAL CONSTRUCTION TAKING PLACE ON 26TH FLOOR CONSTRUCTION (27TH FLOOR MARKETING) FOR CHANGE OF USE AND POPULATION INCREASE.
On file for this project
30 documents
MECHANICAL MODIFICATIONS TAKING PLACE ON CELLAR AND 4TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents · 1 drawing sheet
No filed description on record for this project.
On file for this project
5 documents · 1 drawing sheet
Floor 322p · 2 filings · 20 docs
ArchitectureDM
Issued Permit Scope
General Construction
GENERAL CONSTRUCTION TAKING PLACE ON 42ND FLOOR CONSTRUCTION (43RD MKT) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
10 documents · 1 drawing sheet
GENERAL CONSTRUCTION TAKING PLACE ON 26TH FLOOR CONSTRUCTION (27TH FLOOR MARKETING) FOR CHANGE OF USE AND POPULATION INCREASE.
On file for this project
30 documents
Floor 224p · 4 filings · 20 docs
ArchitectureGeneralPlumbingStructural
Issued Permit Scope
General Construction
Modification to existing Plumbing fixtures, Sprinkler System, and Standpipe system as per plans filed herewith
On file for this project
12 documents · 1 drawing sheet
GENERAL CONSTRUCTION TAKING PLACE ON 26TH FLOOR CONSTRUCTION (27TH FLOOR MARKETING) FOR CHANGE OF USE AND POPULATION INCREASE.
On file for this project
30 documents
STRUCTURAL MODIFICATIONS TAKING PLACE ON CELLAR, 1ST AND 2ND FLOORS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY
On file for this project
21 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 113p · 8 filings · 20 docs
ArchitectureElectricalFire ProtectionPlumbingStructural
Issued Permit Scope
General Construction · Sprinklers
SPRINKLER MODIFICATIONS TAKING PLACE ON SC#2 (3B MKT), SC#1 (2B MKT), CEL (1B MKT) & 1ST Fl AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
4 documents · 1 drawing sheet
GENERAL CONSTRUCTION TAKING PLACE ON 1ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
6 documents · 3 drawing sheets
GENERAL CONSTRUCTION TAKING PLACE ON 1ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
4 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
Mezzanine21p · 1 filing · 20 docs
Architecture
Issued Permit Scope
General Construction
GENERAL CONSTRUCTION TAKING PLACE ON 26TH FLOOR CONSTRUCTION (27TH FLOOR MARKETING) FOR CHANGE OF USE AND POPULATION INCREASE.
On file for this project
30 documents
Cellar90p · 25 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
GENERAL CONSTRUCTION TAKING PLACE ON 26TH FLOOR CONSTRUCTION (27TH FLOOR MARKETING) FOR CHANGE OF USE AND POPULATION INCREASE.
On file for this project
30 documents
GENERAL CONSTRUCTION AT CELLAR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
5 documents · 1 drawing sheet
PLUMBING MODIFICATIONS TAKING PLACE ON CELLAR AND 1ST AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
12 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Sub-CellarUnder Construction64p · 10 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
MECHANICAL MODIFICATIONS TAKING PLACE ON SUB-CELLAR #1 (MARKETING B-2) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
6 documents
GENERAL CONSTRUCTION TAKING PLACE ON SUB-CELLAR #1 (B-2 MARKETING) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
14 documents
SPRINKLER MODIFICATIONS TAKING PLACE ON SUB-CELLAR #1 (MARKETING B-2) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
8 documents
Latest 3 of 8 filings on this floor.
Basement1p · 1 filing · 8 docs
Architecture
GENERAL CONSTRUCTION TAKING PLACE AT CELLAR, SUB-CELLAR, AND 1ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
8 documents · 1 drawing sheet
Sub-Basement7p · 1 filing · 8 docs
Plumbing
Issued Permit Scope
Plumbing
INCLUDING BUT NOT LIMITED TO ADDITION OF NEW WATER & SANITARY LINES AND HOT WATER HEATER PER DESIGN DRAWINGS
On file for this project
8 documents