Two stories - detached, small or mid-size
90-07 199 STREET
QUEENS · Hollis · BIN 4222950
💬 Discuss this project
1920Year Built
2Stories
A1Building Class
R4Zoning
1,264 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 2,400 sf lot · 0.53 FAR built · Flood zone X
Locations of Work
Electrical
Permit Issued — active, not yet Signed-off
RoofUnder Construction8p · 1 filing · 10 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC104/14/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272104/14/2026
Building Lifecycle
All (7)Filed (1)Permit Issued (1)Special Inspection (5)
05/06/2026
Permit issued — Solar
Q01386313-I1-SL
04/14/2026
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF-MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q01386313-I1
04/14/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
04/14/2026
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
04/13/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
04/13/2026
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
04/13/2026
Special inspection requirement — Final
Walid Abdulla
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedSUNRUN INSTALLATION SVC05/06/2026
BIS—ISSUEDBAHR-NONE, INC.11/09/1989
1 project · most recent 04/14/2026
FiledStatusContractorScope
04/14/2026Permit IssuedSUNRUN SOLAR ELECTL CORP—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
04/14/2026Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
04/14/2026Air barrier - visual inspectionWalid Abdullaenergy_progress
04/13/2026Fire-Resistant Penetrations and JointsWalid Abdullaspecial
04/13/2026Energy Code Compliance InspectionsWalid Abdullaprogress
04/13/2026FinalWalid Abdullaprogress
▾Documents — 11 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/17/2026Q01386313-I1Request digital key ↗
08/17/2026Q01386313-P1Request digital key ↗
▸Seals & Professional Certifications7
▸DOB NOWProgress Inspector Seal & Signature3
09/01/2026Q01386313-I1Open ↗
09/01/2026Q01386313-I1Open ↗
09/01/2026Q01386313-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/17/2026Q01386313-P1Open ↗
08/17/2026Q01386313-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026Q01386313-I1Open ↗
09/01/2026Q01386313-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/17/2026Q01386313-P1Open ↗
08/17/2026Q01386313-I1Open ↗