← Back
Two family frame
90-11 170 STREET
QUEENS · Jamaica · BIN 4209753
💬 Discuss this project
1920Year Built
2Stories
B2Building Class
R6AZoning
2,448 sfGross Floor Area
2Units
9 Open Violations 8 unresolved · 1 paperwork only ▸FDNY Report ↗
Two family frame · 3,125 sf lot · 0.78 FAR built · Flood zone X
Locations of Work
Plumbing
Floor 21p · 1 filing · 20 docs
Floor 11p · 1 filing · 20 docs
Cellar1p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
URENA CONST DESIGN503/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
COLOMBO ARCHITECTURAL STUDIO PC310/18/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JOSE A. SANTOS P.E.P.C203/21/2026
JM ZONING, LLC.203/21/2026
JOSE A SANTOS P E P C203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ZONE PLUMBING & HEATING CPlumbing207/08/2026
ALL WAYS ELECTRIC CORP.WElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JOSE A SANTOS PE, PC3292310/18/2021
Building Lifecycle
All (33)Filed (3)Permit Issued (2)Signed Off (1)Violation (13)Special Inspection (14)
01/24/2022
Signed off — Alteration
PROPOSE TO REPLACE ALL PLUMBING FIXTURES, AFFECTED BY FIRE AND WATER DAMAGE, CAP & REMOVE BATHTUBS, INSTALL WASHING MACHINE & 2 STALL SHOWERS AND REPLACE BOILER AND WATER HOT WATER HEATER AS PER PLANS SUBMITTED HEREWITH.
Q00366337-I1
10/20/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jose Santos
10/20/2021
Special inspection requirement — Energy Code Compliance Inspections
Jose Santos
10/20/2021
Special inspection requirement — Fire-Resistance Rated Construction
Jose Santos
10/20/2021
Special inspection requirement — Maintenance information
Jose Santos
10/20/2021
Special inspection requirement — HVAC and service water heating system controls
Jose Santos
10/20/2021
Special inspection requirement — HVAC insulation and sealing
Jose Santos
10/20/2021
Special inspection requirement — HVAC and service water heating equipment
Jose Santos
10/18/2021
Filed — Alteration
PROPOSE TO REPLACE ALL PLUMBING FIXTURES, AFFECTED BY FIRE AND WATER DAMAGE, CAP & REMOVE BATHTUBS, INSTALL WASHING MACHINE & 2 STALL SHOWERS AND REPLACE BOILER AND WATER HOT WATER HEATER AS PER PLANS SUBMITTED HEREWITH.
Q00366337-P2
07/01/2021
Permit issued — Plumbing
Q00366337-I1-PL
06/23/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/02/2021
Violation issued (ECB, open)
Unknown
03/31/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/05/2021
Violation issued (ECB, closed)
Cranes and Derricks
01/05/2021
Violation issued (ECB, closed)
Construction
01/05/2021
Violation issued (ECB, open)
Unknown
01/05/2021
Violation issued (ECB, closed)
Construction
12/09/2020
Filed — Alteration
PROPOSE TO REPLACE ALL PLUMBING FIXTURES, AFFECTED BY FIRE AND WATER DAMAGE, CAP & REMOVE BATHTUBS, INSTALL WASHING MACHINE & 2 STALL SHOWERS AND REPLACE BOILER AND WATER HOT WATER HEATER AS PER PLANS SUBMITTED HEREWITH.
Q00366337-P1
12/08/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jose Santos
12/08/2020
Special inspection requirement — Energy Code Compliance Inspections
Jose Santos
12/08/2020
Special inspection requirement — Fire-Resistance Rated Construction
Jose Santos
12/08/2020
Special inspection requirement — HVAC and service water heating equipment
Jose Santos
12/08/2020
Special inspection requirement — HVAC insulation and sealing
Jose Santos
12/08/2020
Special inspection requirement — Maintenance information
Jose Santos
12/08/2020
Special inspection requirement — HVAC and service water heating system controls
Jose Santos
11/06/2020
Permit issued — Plumbing
Q00366337-I1-PL
07/28/2020
Filed — Alteration
PROPOSE TO REPLACE ALL PLUMBING FIXTURES, AFFECTED BY FIRE AND WATER DAMAGE, CAP & REMOVE BATHTUBS, INSTALL WASHING MACHINE & 2 STALL SHOWERS AND REPLACE BOILER AND WATER HOT WATER HEATER AS PER PLANS SUBMITTED HEREWITH.
Q00366337-I1
11/28/2001
Violation issued (HPD, open)
A
11/28/2001
Violation issued (HPD, open)
B
11/28/2001
Violation issued (HPD, open)
B
11/28/2001
Violation issued (HPD, open)
B
12/28/1999
Violation issued (ECB, open)
Quality of Life
12/28/1999
Violation issued (ECB, closed)
Quality of Life
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offZONE PLUMBING & HEATING C07/01/2021
DOB NOWPlumbingSigned-offZONE PLUMBING & HEATING C11/06/2020
BISOTISSUEDURENA CONST & DESIGN INC03/30/2021
BISOTISSUEDURENA CONST & DESIGN INC08/10/2020
2 projects · most recent 01/06/2021
General Wiring
FiledStatusContractorScope
01/06/2021CompleteA.X.M. ELECTRIC CORPGeneral Wiring
06/01/2020Permit IssuedALL WAYS ELECTRIC CORP.W2 meters
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
10/20/2021Fire-Resistant Penetrations and JointsJose Santosspecial
10/20/2021Energy Code Compliance InspectionsJose Santosprogress
10/20/2021Fire-Resistance Rated ConstructionJose Santosprogress
10/20/2021Maintenance informationJose Santosenergy_progress
10/20/2021HVAC and service water heating system controls Jose Santosenergy_progress
10/20/2021HVAC insulation and sealing Jose Santosenergy_progress
10/20/2021HVAC and service water heating equipment Jose Santosenergy_progress
12/08/2020Fire-Resistant Penetrations and JointsJose Santosspecial
12/08/2020Energy Code Compliance InspectionsJose Santosprogress
12/08/2020Fire-Resistance Rated ConstructionJose Santosprogress
12/08/2020HVAC and service water heating equipment Jose Santosenergy_progress
12/08/2020HVAC insulation and sealing Jose Santosenergy_progress
12/08/2020Maintenance informationJose Santosenergy_progress
12/08/2020HVAC and service water heating system controls Jose Santosenergy_progress
▾Documents — 65 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch - Plumbing3
08/28/2026Q00366337-I1Request digital key ↗
08/15/2026Q00366337-P2Request digital key ↗
08/15/2026Q00366337-P1Request digital key ↗
▸Applications & Permits9
▸BISPLAN / WORK APPROVAL APPLICATION7
09/13/2021440611866Open ↗
09/09/2021440611866Open ↗
06/08/2021440611866Open ↗
Showing 3 of 7 on file for this type
▸BISWORK PERMIT APPLICATION2
06/16/2021440611866Open ↗
08/10/2020440611866Open ↗
▸Zoning, Tax Lot & Property Records1
▸BISRESTRICTION: RESTRICTIVE DECLARATION1
08/05/2021440611866Open ↗
▸Seals & Professional Certifications21
▸DOB NOWProgress Inspector Seal & Signature12
08/25/2026Q00366337-I1Open ↗
08/25/2026Q00366337-I1Open ↗
08/25/2026Q00366337-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/28/2026Q00366337-I1Open ↗
08/28/2026Q00366337-P1Open ↗
08/28/2026Q00366337-P2Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/25/2026Q00366337-I1Open ↗
08/22/2026Q00366337-P1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
07/28/2020440611866Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
05/26/2021440611866Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
07/28/2020440611866Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
07/28/2020440611866Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/28/2026Q00366337-P2Open ↗
08/28/2026Q00366337-I1Open ↗
08/28/2026Q00366337-P1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
07/28/2020440611866Open ↗
▸Energy Compliance10
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
05/26/2021440611866Open ↗
05/26/2021440611866Open ↗
08/10/2020440611866Open ↗
Showing 3 of 4 on file for this type
▸BISINTERIOR LIGHTING POWER1
01/04/2023440611866Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
01/04/2023440611866Open ↗
▸BISLIGHTING IN DWELLING UNITS1
01/04/2023440611866Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
01/04/2023440611866Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
01/04/2023440611866Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
07/28/2020440611866Open ↗
▸Inspections & Test Reports7
▸BISTECHNICAL REPORT: RESPONSIBILITY3
05/26/2021440611866Open ↗
05/26/2021440611866Open ↗
07/28/2020440611866Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
01/04/2023440611866Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
01/04/2023440611866Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
01/04/2023440611866Open ↗
▸BISDOB FINAL INSPECTION REQUIRED1
01/04/2023440611866Open ↗
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
01/06/2023440611866Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT2
05/26/2021440611866Open ↗
07/28/2020440611866Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
01/04/2023440611866Open ↗
▸Filing & Intake Forms6
▸BISADDITIONAL INFORMATION4
09/13/2021440611866Open ↗
06/08/2021440611866Open ↗
01/27/2021440611866Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
07/28/2020440611866Open ↗
▸BISBOROUGH INTAKE FORM1
06/16/2021440611866Open ↗