DOB09/23/2024VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION
DOB09/23/2024VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL HGH PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2019 INTERNAL HGH PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2018 INTERNAL HGH PRESSURE INSPECTION
DOB04/25/2023VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL HIGH PRESSURE INSPECTION
DOB04/25/2023VIOLATION ISSUED-FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE INSPECTION
DOB03/16/2020VIOLATION ISSUED - FAILURE TO FILE 2017 INTERNAL HIGH PRESSURE BOILER INSPECTION
DOB03/16/2020VIOLATION ISSUED - FAILURE TO FILE 2017 EXTERNAL HIGH PRESSURE BOILER INSPECTION
DOB03/03/2015VIOLATION ISSUED FOR FAILURE TO FILE 2013 ANNUAL HIGH PRESSURE BOILER INSPECTION
DOB12/13/2011VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
DOB12/31/2009V-DOB VIOLATION - ACTIVE
DOB01/01/2009V-DOB VIOLATION - ACTIVE
DOB01/03/2008V-DOB VIOLATION - ACTIVE
DOB01/19/2007V-DOB VIOLATION - ACTIVE
DOB01/06/2006V-DOB VIOLATION - ACTIVE
DOB01/31/2005V-DOB VIOLATION - ACTIVE
DOB02/13/2004V-DOB VIOLATION - ACTIVE
DOB03/19/2003V-DOB VIOLATION - ACTIVE
DOB03/26/2002V-DOB VIOLATION - ACTIVE
DOB02/27/2001V-DOB VIOLATION - ACTIVE
DOB02/07/2000V-DOB VIOLATION - ACTIVE
DOB03/16/1999V-DOB VIOLATION - ACTIVE
DOB05/04/1998V-DOB VIOLATION - ACTIVE
DOB09/16/1997V-DOB VIOLATION - ACTIVE
DOB02/10/1997V-DOB VIOLATION - ACTIVE
DOB02/10/1997V-DOB VIOLATION - ACTIVE
ECB04/06/201050A, 50B, 50C. 50A: BOILER FEED PUMP LEAKING. 50B: REMOVE CEMENT FROM HAND HOLES TO ALLOW VISUAL INSPECTION OF HAND HOLE & RING. 50C: INSTALL GUAGE GLASS DRAIN VALVE & PIPING.Nothing owed — awaiting certificate of correction
ECB02/09/200711B/50A/50B/18B/48A/50C/50D/.50A-BOILER FLU PIPE NOT SEALED AT CHIMNEYBASE.50B-NO SUPPORT ON FLU PIPE.50C-CEILING ABOVE BOILER NOT PROPERLY FIRE RATED.50D-COMBUSTION LEAKS AROUND CASSING & AT LOWER HAND HOLE.Nothing owed — awaiting certificate of correction
ECB03/19/2004WORK W/OUT A PERMIT:WORK NOTED:INSTALLED NEW ALUMINIUM GLAZED DOOR 2'-0" WIDE X6'-10" HIGH AT FRONT WEST.ALSO ERECTED FULL HEIGHT PARTITION APPROX 12'-0" HIGH ALONG THE ENTIRE DEPTH OF BLDG CREATING AN ADDITIONNothing owed — awaiting certificate of correction