← Back
Two stories - detached, small or mid-size
90-18 218 PLACE
QUEENS · Queens Village · BIN 4229590
💬 Discuss this project
1925Year Built
2Stories
A1Building Class
R2Zoning
1,136 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 2,900 sf lot · 0.39 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC105/07/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272105/07/2025
Building Lifecycle
All (22)Filed (1)Permit Issued (1)Signed Off (1)Violation (14)Special Inspection (5)
07/29/2025
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01218608-I1
05/12/2025
Permit issued — Solar
Q01218608-I1-SL
05/07/2025
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01218608-I1
04/30/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
04/30/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
04/30/2025
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
04/30/2025
Special inspection requirement — Final
Walid Abdulla
04/30/2025
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
11/10/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/12/2011
Violation issued (ECB, closed)
Construction
07/27/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/17/2011
Violation issued (ECB, closed)
Unknown
04/30/2011
Violation issued (ECB, closed)
Construction
02/15/2011
Violation issued (ECB, closed)
Unknown
07/22/2010
Violation issued (ECB, closed)
Unknown
02/04/2010
Violation issued (ECB, closed)
Unknown
09/16/2009
Violation issued (ECB, closed)
Unknown
04/23/2009
Violation issued (ECB, closed)
Unknown
04/23/2009
Violation issued (ECB, closed)
Construction
09/11/2008
Violation issued (ECB, closed)
Construction
09/11/2008
Violation issued (ECB, closed)
Construction
08/26/2008
Violation issued (ECB, closed)
Unknown
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC05/12/2025
BISPLISSUEDRRP PLUMBING CORP05/20/2011
1 project · most recent 05/07/2025
FiledStatusContractorScope
05/07/2025CompleteSUNRUN SOLAR ELECTL CORP—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
04/30/2025Fire-Resistant Penetrations and JointsWalid Abdullaspecial
04/30/2025Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
04/30/2025Energy Code Compliance InspectionsWalid Abdullaprogress
04/30/2025FinalWalid Abdullaprogress
04/30/2025Air barrier - visual inspectionWalid Abdullaenergy_progress
▾Documents — 25 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/20/2026Q01218608-I1Request digital key ↗
▸Applications & Permits5
▸BISPLAN / WORK APPROVAL APPLICATION2
04/21/2011410200036Open ↗
12/16/2008410200036Open ↗
▸BISWORK PERMIT APPLICATION2
05/23/2011410200036Open ↗
05/17/2011410200036Open ↗
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
07/29/2011410200036Open ↗
▸Seals & Professional Certifications8
▸DOB NOWProgress Inspector Seal & Signature3
08/23/2026Q01218608-I1Open ↗
08/23/2026Q01218608-I1Open ↗
08/23/2026Q01218608-I1Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
07/29/2011410200036Open ↗
05/20/2011410200036Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/23/2026Q01218608-I1Open ↗
08/23/2026Q01218608-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/20/2026Q01218608-I1Open ↗
▸Trade Schedules & Equipment2
▸BISSELF-CERT PLUMBING NOTICE1
06/02/2011410200036Open ↗
▸BISSCHEDULE B - PLUMBING1
12/16/2008410200036Open ↗
▸Environmental & Asbestos2
▸BISTHIS IS NOT AN ASBESTOS PROJECT1
11/23/2010410200036Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/20/2026Q01218608-I1Open ↗
▸Approvals, Objections & Sign-offs4
▸BISADMINISTRATIVE OBJECTIONS1
12/16/2008410200036Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
07/29/2011410200036Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
07/29/2011410200036Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01218608-I1Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
07/29/2011410200036Open ↗
12/16/2008410200036Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
12/16/2008410200036Open ↗