Nursing home
D Building
90-28 VAN WYCK EXPRESSWAY · Richmond Hill · BIN 4196910
💬 Discuss this project
1978Year Built
5Stories
I6Building Class
R6Zoning
47,863 sfGross Floor Area
1Units
LL97 Covered8 Open Violations 7 unresolved · 1 paperwork only ▸FDNY Report ↗
Nursing home · Owner of record: MEDISYS HEALTH NETWORK INC. · 31,400 sf lot · 1.52 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire ProtectionGeneral
Roof2p · 1 filing · 20 docs
Bulkhead1p · 1 filing · 20 docs
Floor 62p · 1 filing · 20 docs
Floor 53p · 1 filing · 20 docs
Floor 41p · 1 filing · 20 docs
Floor 33p · 1 filing · 20 docs
Floor 22p · 1 filing · 20 docs
Floor 12p · 1 filing · 20 docs
Cellar1p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
JAMAICA HOSPITAL609/13/2026
JAMAICA HOSPITAL MEDICAL CENTER1407/08/2026
MEDISYS HEALTH NETWORK INC.303/22/2026
TRUMP HOUSING & REHAB.103/22/2026
JAMAICA HOSPITAL NURSI603/22/2026
JAMAICA HOSPITAL MED.103/22/2026
KEYSTONE CONTRACTING203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
J CALLAHAN CONSULTING603/21/2026
LEWSAN CONSULTING403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TAVELLA PLBG & HTG CORPPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
EC SPECIAL INSPECTIONS8355204/23/2024
Building Lifecycle
All (120)Filed (8)Permit Issued (2)Signed Off (2)Violation (60)Inspection (4)Objection (14)Special Inspection (30)
04/17/2026
Objection raised — Energy
04/16/2026
Objection raised — Energy
04/02/2026
Objection resolved — Addressed
04/02/2026
Objection resolved — Addressed
04/02/2026
Special inspection requirement — Sprayed fire-resistant materials
04/02/2026
Special inspection requirement — Structural Cold-Formed Steel
03/18/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
NEW 6TH FLOOR ROOFTOP ADDITION, SELECTIVE DEMOLITION OF EXISTING FLOORS AND REPLACEMENT CONSTRUCTION OF FLOORS 3, 4, AND 5, CONSTRUCTION OF NON-BEARING INTERIOR PARTITIONS, SUSPENDED CEILING, AND FINISHES TO CREATE A NEW CANCER TREATMENT CENTER.
Q01238257-S3
03/17/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
NEW 6TH FLOOR ROOFTOP ADDITION, SELECTIVE DEMOLITION OF EXISTING FLOORS AND REPLACEMENT CONSTRUCTION OF FLOORS 3, 4, AND 5, CONSTRUCTION OF NON-BEARING INTERIOR PARTITIONS, SUSPENDED CEILING, AND FINISHES TO CREATE A NEW CANCER TREATMENT CENTER.
Q01238257-S4
03/17/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
NEW 6TH FLOOR ROOFTOP ADDITION, SELECTIVE DEMOLITION OF EXISTING FLOORS AND REPLACEMENT CONSTRUCTION OF FLOORS 3, 4, AND 5, CONSTRUCTION OF NON-BEARING INTERIOR PARTITIONS, SUSPENDED CEILING, AND FINISHES TO CREATE A NEW CANCER TREATMENT CENTER.
Q01238257-S5
03/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
03/03/2026
Special inspection requirement — Seismic Isolation Systems
03/03/2026
Special inspection requirement — Post-installed Anchors
03/02/2026
Special inspection requirement — Duct leakage testing, insulation and design
03/02/2026
Special inspection requirement — Maintenance information
02/26/2026
Special inspection requirement — Standpipe Systems
02/26/2026
Special inspection requirement — Sprinkler Systems
02/23/2026
Special inspection requirement — Final
02/23/2026
Special inspection requirement — Mechanical Systems
02/23/2026
Special inspection requirement — Energy Code Compliance Inspections
02/23/2026
Special inspection requirement — HVAC-R and service water heating system controls
02/23/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
02/23/2026
Special inspection requirement — HVAC-R and service water heating equipment
02/23/2026
Special inspection requirement — Shutoff dampers
12/19/2025
Objection resolved — Addressed
09/05/2025
Objection raised — Admin
09/05/2025
Objection raised — Scope
08/13/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
NEW 6TH FLOOR ROOFTOP ADDITION, SELECTIVE DEMOLITION OF EXISTING FLOORS AND REPLACEMENT CONSTRUCTION OF FLOORS 3, 4, AND 5, CONSTRUCTION OF NON-BEARING INTERIOR PARTITIONS, SUSPENDED CEILING, AND FINISHES TO CREATE A NEW CANCER TREATMENT CENTER.
Q01238257-S1
08/13/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
NEW 6TH FLOOR ROOFTOP ADDITION, SELECTIVE DEMOLITION OF EXISTING FLOORS AND REPLACEMENT CONSTRUCTION OF FLOORS 3, 4, AND 5, CONSTRUCTION OF NON-BEARING INTERIOR PARTITIONS, SUSPENDED CEILING, AND FINISHES TO CREATE A NEW CANCER TREATMENT CENTER.
Q01238257-S2
07/24/2025
Objection resolved — Addressed
07/24/2025
Objection resolved — Addressed
07/24/2025
Objection resolved — Addressed
07/17/2025
Objection raised — Accessibility
07/17/2025
Objection raised — Scope
07/17/2025
Objection raised — Fire_Protection
07/17/2025
Objection raised — Admin
06/24/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
NEW 6TH FLOOR ROOFTOP ADDITION, SELECTIVE DEMOLITION OF EXISTING FLOORS AND REPLACEMENT CONSTRUCTION OF FLOORS 3, 4, AND 5, CONSTRUCTION OF NON-BEARING INTERIOR PARTITIONS, SUSPENDED CEILING, AND FINISHES TO CREATE A NEW CANCER TREATMENT CENTER.
Q01238257-I1
06/24/2025
Special inspection requirement — Mastic and Intumescent Fire-resistant Coatings
06/24/2025
Special inspection requirement — Designated Seismic System
06/20/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
06/12/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
06/12/2025
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
06/12/2025
Special inspection requirement — Energy Code Compliance Inspections
06/12/2025
Special inspection requirement — Fire-Resistance Rated Construction
06/12/2025
Special inspection requirement — Lowest Floor Elevation
06/12/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
06/12/2025
Special inspection requirement — Insulation placement and R values
06/12/2025
Special inspection requirement — Fenestration areas
06/12/2025
Special inspection requirement — Electrical motors and elevators
06/12/2025
Special inspection requirement — Air barrier — testing
06/12/2025
Special inspection requirement — Lighting controls
10/16/2024
Signed off — Alteration
Q01018895-S1
10/16/2024
Signed off — Alteration
Q01018895-I1
09/23/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/23/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/12/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/03/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
05/13/2024
Permit issued — Plumbing
Q01018895-S1-PL
05/13/2024
Permit issued — Boiler Equipment
Q01018895-I1-BE
04/23/2024
Filed — Alteration
Q01018895-S1
04/23/2024
Filed — Alteration
Q01018895-I1
Latest 60 of 120 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offTAVELLA PLBG & HTG CORP05/13/2024
DOB NOWBoiler EquipmentSigned-offTAVELLA PLBG & HTG CORP05/13/2024
BISEQISSUEDKEYSTONE CONTRACTING CORP07/14/2015
BISOTISSUEDKEYSTONE CONTRACTING CORP07/10/2015
BISOTISSUEDJAMAICA HOSPITAL MEDICAL11/09/2010
BISEQISSUEDSPARACO' PLUMBING & HEATING CORP07/05/2002
BISOTISSUEDSPARACO' PLUMBING & HEATING CORP07/05/2002
BISFBISSUEDWASOFF PLBG. & UTL.CO INC06/01/1999
BISPLISSUEDWASOFF PLBG & UTILITY CO06/01/1999
BISPLISSUEDTRI CITY MECHANICAL GROUP CORP05/19/1997
BISOTISSUEDPETER CIARAVELLA LTD05/14/1996
BISPLISSUEDGIRASAN PLUMBING AND HEATING06/07/1995
BISOTISSUEDPETER IARAVELLA05/17/1995
BISOTISSUEDCHAMPION COMPACTORS INC.11/23/1994
BIS—ISSUEDBERGER SIGN FABRICATION INC.01/18/1990
1 project · most recent 03/18/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
03/18/2026——Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Trane CSAA008 151,510 BTU · Chiller ×3
PUY-AK18NL 18,000 BTU · Vrf Outdoor ×2
RTAF310 310 tons · Air Cooled Chiller ×2
CSAA017 290,930 BTU · Rooftop Unit ×1
PURY-HM72TXU-A 72,000 BTU · Vrf Outdoor ×1
TURYE1683AMM0AN 168,000 BTU · Vrf Outdoor ×1
YCD600 540,670 BTU · Chiller ×1
YHK300 267,240 BTU · Chiller ×1
Ventilation
Greenheck VK-H-10-4 280 CFM · Exhaust Fan ×3
VK-H-10-7 950 CFM · Exhaust Fan ×3
SQ-97-VG 205 CFM · Exhaust Fan ×2
SQ-98-VG 370 CFM · Exhaust Fan ×2
VK-H-10-6 600 CFM · Exhaust Fan ×2
CUBE-160XP 1,480 CFM · Exhaust Fan ×1
CUBE-180HP 2,405 CFM · Exhaust Fan ×1
CUBE-2409XP 2,185 CFM · Exhaust Fan ×1
SE1-14-440-VG 730 CFM · Exhaust Fan ×1
VK-H-10-5 490 CFM · Exhaust Fan ×1
VK-H-12-8 1,580 CFM · Exhaust Fan ×1
1 project · most recent 02/18/2021
General Wiring
FiledStatusContractorScope
02/18/2021CompleteJAMAICA HOSPITAL MED CTRGeneral Wiring
1 project · most recent 03/18/2026
Steel Concrete
FiledStatusContractorScope
03/18/2026——Steel, Concrete
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
09/23/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/23/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/12/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/03/2024Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 52
DateRequirementInspectorRole
04/02/2026Sprayed fire-resistant materials—special
04/02/2026Structural Cold-Formed Steel—special
03/03/2026Fire-Resistant Penetrations and Joints—special
03/03/2026Seismic Isolation Systems—special
03/03/2026Post-installed Anchors—special
03/02/2026Duct leakage testing, insulation and design—energy_progress
03/02/2026Maintenance information—energy_progress
02/26/2026Standpipe Systems—special
02/26/2026Sprinkler Systems—special
02/23/2026Final—progress
02/23/2026Mechanical Systems—special
02/23/2026Energy Code Compliance Inspections—progress
02/23/2026HVAC-R and service water heating system controls—energy_progress
02/23/2026HVAC-R and service water piping design and insulation—energy_progress
02/23/2026HVAC-R and service water heating equipment—energy_progress
02/23/2026Shutoff dampers—energy_progress
06/24/2025Mastic and Intumescent Fire-resistant Coatings—special
06/24/2025Designated Seismic System—special
06/20/2025Structural Stability – Alterations of existing buildings—special
06/12/2025Structural Stability – Alterations of existing buildings—special
06/12/2025Wall Panels, Curtain Walls, and Veneers—special
06/12/2025Energy Code Compliance Inspections—progress
06/12/2025Fire-Resistance Rated Construction—progress
06/12/2025Lowest Floor Elevation—progress
06/12/2025Fenestration and door U-factor and product ratings—energy_progress
Latest 25 of 52.
▾Documents — 119 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/22/2026Q01018895-I1Request digital key ↗
08/22/2026Q01018895-S1Request digital key ↗
08/17/2026Q01238257-S3Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits16
▸BISPLAN / WORK APPROVAL APPLICATION13
07/19/2017420209679Open ↗
09/19/2016421234364Open ↗
03/30/2016421234364Open ↗
Showing 3 of 13 on file for this type
▸BISWORK PERMIT APPLICATION2
07/13/2015440234462Open ↗
07/09/2015440233212Open ↗
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
10/01/2015440233212Open ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026Q01238257-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q01238257-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026Q01238257-I1Open ↗
▸Seals & Professional Certifications31
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION9
12/04/2015440234462Open ↗
12/04/2015440234462Open ↗
11/20/2015421234364Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/22/2026Q01018895-S1Open ↗
08/22/2026Q01018895-I1Open ↗
08/17/2026Q01238257-S5Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
08/24/2026Q01018895-S1Open ↗
08/23/2026Q01018895-I1Open ↗
08/23/2026Q01018895-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/24/2026Q01018895-S1Open ↗
08/23/2026Q01018895-I1Open ↗
08/23/2026Q01018895-I1Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
07/13/2015440234462Open ↗
07/09/2015440233212Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
07/13/2015440234462Open ↗
07/09/2015440233212Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
07/13/2015440234462Open ↗
07/09/2015440233212Open ↗
▸Trade Schedules & Equipment5
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
03/30/2016421234364Open ↗
03/22/2016421234364Open ↗
11/20/2015421234364Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
06/06/2018420209679Open ↗
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026Q01238257-I1Open ↗
▸Safety & Tenant Protection4
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
11/12/2010420211149Open ↗
▸BISST-1 Street Tree Checklist1
05/03/2010420179498Open ↗
▸BISDS1-Demolition Submittal Certification Form1
11/12/2010420211149Open ↗
▸BISSTREET TREE CHECKLIST1
07/02/2010420211149Open ↗
▸Environmental & Asbestos8
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
07/20/2010420209679Open ↗
07/02/2010420211149Open ↗
05/03/2010420179498Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
01/30/2017421234364Open ↗
07/09/2015440233212Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/22/2026Q01018895-S1Open ↗
08/22/2026Q01018895-I1Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
11/20/2015421234364Open ↗
▸Energy Compliance7
▸BISAS-BUILT ENERGY ANALYSIS2
12/04/2015440234462Open ↗
10/01/2015440233212Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
11/20/2015421234364Open ↗
10/01/2015440233212Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
07/13/2015440234462Open ↗
07/09/2015440233212Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
07/09/2015440233212Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
07/13/2015440234462Open ↗
07/09/2015440233212Open ↗
▸Approvals, Objections & Sign-offs16
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter6
08/13/2026Q01238257-S5Open ↗
08/13/2026Q01238257-S4Open ↗
08/13/2026Q01238257-I1Open ↗
Showing 3 of 6 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
07/02/2010420211149Open ↗
06/30/2010420209679Open ↗
05/03/2010420179498Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE3
03/30/2016421234364Open ↗
03/22/2016421234364Open ↗
11/20/2015421234364Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
11/12/2010420211149Open ↗
05/03/2010420179498Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
12/04/2015440234462Open ↗
10/01/2015440233212Open ↗
▸Cost, Insurance & Ownership7
▸BISCOST AFFIDAVIT7
11/20/2015421234364Open ↗
10/01/2015440233212Open ↗
07/09/2015440233212Open ↗
Showing 3 of 7 on file for this type
▸Filing & Intake Forms8
▸BISEFILING COVER SHEET6
11/20/2015421234364Open ↗
07/02/2010420211149Open ↗
07/02/2010420211149Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
07/13/2015440234462Open ↗
07/09/2015440233212Open ↗
▸Other Documents4
▸BISPLOT DIAGRAM1
11/20/2015421234364Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026Q01238257-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/14/2026Q01238257-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026Q01238257-I1Open ↗