| Owner | Filings | Most Recent |
|---|---|---|
| JAMAICA HOSPITAL | 6 | 09/13/2026 |
| JAMAICA HOSPITAL MEDICAL CENTER | 14 | 07/08/2026 |
| MEDISYS HEALTH NETWORK INC. | 3 | 03/22/2026 |
| TRUMP HOUSING & REHAB. | 1 | 03/22/2026 |
| JAMAICA HOSPITAL NURSI | 6 | 03/22/2026 |
| JAMAICA HOSPITAL MED. | 1 | 03/22/2026 |
| KEYSTONE CONTRACTING | 2 | 03/21/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| RBSD ARCHITECTS PC | 4 | 03/18/2026 |
| SR HARWOOD CONSULTING ENGINEERING | 2 | 08/13/2025 |
| KEMS ENGINEERING AND CONSTRUCTION | 2 | 04/23/2024 |
| Representative | Filings | Most Recent |
|---|---|---|
| J CALLAHAN CONSULTING | 6 | 03/21/2026 |
| LEWSAN CONSULTING | 4 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| TAVELLA PLBG & HTG CORP | Plumbing | 2 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| EC SPECIAL INSPECTIONS | 8355 | 2 | 04/23/2024 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Plumbing | Signed-off | TAVELLA PLBG & HTG CORP | 05/13/2024 |
| DOB NOW | Boiler Equipment | Signed-off | TAVELLA PLBG & HTG CORP | 05/13/2024 |
| BIS | EQ | ISSUED | KEYSTONE CONTRACTING CORP | 07/14/2015 |
| BIS | OT | ISSUED | KEYSTONE CONTRACTING CORP | 07/10/2015 |
| BIS | OT | ISSUED | JAMAICA HOSPITAL MEDICAL | 11/09/2010 |
| BIS | EQ | ISSUED | SPARACO' PLUMBING & HEATING CORP | 07/05/2002 |
| BIS | OT | ISSUED | SPARACO' PLUMBING & HEATING CORP | 07/05/2002 |
| BIS | FB | ISSUED | WASOFF PLBG. & UTL.CO INC | 06/01/1999 |
| BIS | PL | ISSUED | WASOFF PLBG & UTILITY CO | 06/01/1999 |
| BIS | PL | ISSUED | TRI CITY MECHANICAL GROUP CORP | 05/19/1997 |
| BIS | OT | ISSUED | PETER CIARAVELLA LTD | 05/14/1996 |
| BIS | PL | ISSUED | GIRASAN PLUMBING AND HEATING | 06/07/1995 |
| BIS | OT | ISSUED | PETER IARAVELLA | 05/17/1995 |
| BIS | OT | ISSUED | CHAMPION COMPACTORS INC. | 11/23/1994 |
| BIS | — | ISSUED | BERGER SIGN FABRICATION INC. | 01/18/1990 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 03/18/2026 | — | — | Heating and Air Conditioning Systems, Ventilation Systems | Heat / Cool Trane CSAA008 151,510 BTU · Chiller ×3 PUY-AK18NL 18,000 BTU · Vrf Outdoor ×2 RTAF310 310 tons · Air Cooled Chiller ×2 CSAA017 290,930 BTU · Rooftop Unit ×1 PURY-HM72TXU-A 72,000 BTU · Vrf Outdoor ×1 TURYE1683AMM0AN 168,000 BTU · Vrf Outdoor ×1 YCD600 540,670 BTU · Chiller ×1 YHK300 267,240 BTU · Chiller ×1 Ventilation Greenheck VK-H-10-4 280 CFM · Exhaust Fan ×3 VK-H-10-7 950 CFM · Exhaust Fan ×3 SQ-97-VG 205 CFM · Exhaust Fan ×2 SQ-98-VG 370 CFM · Exhaust Fan ×2 VK-H-10-6 600 CFM · Exhaust Fan ×2 CUBE-160XP 1,480 CFM · Exhaust Fan ×1 CUBE-180HP 2,405 CFM · Exhaust Fan ×1 CUBE-2409XP 2,185 CFM · Exhaust Fan ×1 SE1-14-440-VG 730 CFM · Exhaust Fan ×1 VK-H-10-5 490 CFM · Exhaust Fan ×1 VK-H-12-8 1,580 CFM · Exhaust Fan ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 02/18/2021 | Complete | JAMAICA HOSPITAL MED CTR | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 03/18/2026 | — | — | Steel, Concrete |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 04/02/2026 | Sprayed fire-resistant materials | — | special |
| 04/02/2026 | Structural Cold-Formed Steel | — | special |
| 03/03/2026 | Fire-Resistant Penetrations and Joints | — | special |
| 03/03/2026 | Seismic Isolation Systems | — | special |
| 03/03/2026 | Post-installed Anchors | — | special |
| 03/02/2026 | Duct leakage testing, insulation and design | — | energy_progress |
| 03/02/2026 | Maintenance information | — | energy_progress |
| 02/26/2026 | Standpipe Systems | — | special |
| 02/26/2026 | Sprinkler Systems | — | special |
| 02/23/2026 | Final | — | progress |
| 02/23/2026 | Mechanical Systems | — | special |
| 02/23/2026 | Energy Code Compliance Inspections | — | progress |
| 02/23/2026 | HVAC-R and service water heating system controls | — | energy_progress |
| 02/23/2026 | HVAC-R and service water piping design and insulation | — | energy_progress |
| 02/23/2026 | HVAC-R and service water heating equipment | — | energy_progress |
| 02/23/2026 | Shutoff dampers | — | energy_progress |
| 06/24/2025 | Mastic and Intumescent Fire-resistant Coatings | — | special |
| 06/24/2025 | Designated Seismic System | — | special |
| 06/20/2025 | Structural Stability – Alterations of existing buildings | — | special |
| 06/12/2025 | Structural Stability – Alterations of existing buildings | — | special |
| 06/12/2025 | Wall Panels, Curtain Walls, and Veneers | — | special |
| 06/12/2025 | Energy Code Compliance Inspections | — | progress |
| 06/12/2025 | Fire-Resistance Rated Construction | — | progress |
| 06/12/2025 | Lowest Floor Elevation | — | progress |
| 06/12/2025 | Fenestration and door U-factor and product ratings | — | energy_progress |