← Back
Two stories - detached, small or mid-size
90-56 SHORE PARKWAY
QUEENS · Howard Beach-Lindenwood · BIN 4247509
💬 Discuss this project
1960Year Built
1Stories
A1Building Class
R2Zoning
2,450 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · Owner of record: JMP AND JF PROP LLC · 4,200 sf lot · 0.58 FAR built · Flood zone AE
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Roof39p · 2 filings · 20 docs
Floor 241p · 3 filings · 20 docs
Floor 143p · 4 filings · 20 docs
Cellar43p · 3 filings · 20 docs
Site & exterior36p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ACSCA3707/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/24/2025$1.2M—JMP AND JF PROP LLC → Private party$490/sf building
02/10/2021$615K—— → —$251/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LUIS PICHARDO, PE504/11/2025
BUILDTECH ENGINEERING DPC512/01/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ENKAY DESIGN CONSULTING1803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Z.L.A PROPERTIES MANAGEMENTGeneral Contractor807/08/2026
PARAMOUNT PIPING INCGeneral Contractor707/08/2026
DOVAL PLBG & HTG CORPPlumbing107/08/2026
PARAMOUNT PIPING INCPlumbing107/08/2026
TOP DOG PLBG & HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BUILDTECH ENGINEERING6369904/11/2025
M. INT'L ENGINEERING PLLC3129504/11/2025
Building Lifecycle
All (71)Filed (10)Permit Issued (10)Signed Off (3)Violation (5)Inspection (5)Objection (8)Special Inspection (30)
05/06/2025
Special inspection requirement — Footing and Foundation
Luis Pichardo
05/06/2025
Special inspection requirement — Structural Cold-Formed Steel
Luis Pichardo
05/06/2025
Special inspection requirement — Insulation placement and R values
Luis Pichardo
05/06/2025
Special inspection requirement — Energy Code Compliance Inspections
Luis Pichardo
05/06/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Luis Pichardo
05/06/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Luis Pichardo
05/06/2025
Special inspection requirement — Lighting controls
Luis Pichardo
05/06/2025
Special inspection requirement — Interior lighting power
Luis Pichardo
05/06/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Luis Pichardo
05/06/2025
Special inspection requirement — Fenestration areas
Luis Pichardo
05/06/2025
Special inspection requirement — Structural Steel - High Strength Bolting
NANIK MASSAND
05/06/2025
Special inspection requirement — Structural Steel - Welding
NANIK MASSAND
05/06/2025
Special inspection requirement — Masonry
Luis Pichardo
05/06/2025
Special inspection requirement — Structural Steel - Details
Luis Pichardo
05/06/2025
Special inspection requirement — Final
Luis Pichardo
05/06/2025
Special inspection requirement — Fire-Resistance Rated Construction
Luis Pichardo
05/06/2025
Special inspection requirement — Exterior lighting power
Luis Pichardo
05/06/2025
Special inspection requirement — Air barrier - visual inspection
Luis Pichardo
05/06/2025
Special inspection requirement — Fenestration air leakage
Luis Pichardo
05/06/2025
Special inspection requirement — Concrete - Cast-In-Place
Luis Pichardo
04/11/2025
Filed — Alteration CO
VERT. ENLGMT ON EXTG 1-STRY, 1-FAM RESIDENCE. NEW INTER. RENOV.: INSTALLATION OF NEW GWB PARTITIONS, & NEW FINISHES FOR FLR, CLG & WALL. NEW LIGHT FIXTURES. NEW FLOOR & ROOF STRUCTURAL FRAMING. NEW ENTRY STEPS AT FRONT & REAR. NO CHANGE TO USE OR OCCUP.
Q00518011-P4
01/27/2025
Filed — Alteration CO
VERT. ENLGMT ON EXTG 1-STRY, 1-FAM RESIDENCE. NEW INTER. RENOV.: INSTALLATION OF NEW GWB PARTITIONS, & NEW FINISHES FOR FLR, CLG & WALL. NEW LIGHT FIXTURES. NEW FLOOR & ROOF STRUCTURAL FRAMING. NEW ENTRY STEPS AT FRONT & REAR. NO CHANGE TO USE OR OCCUP.
Q00518011-P3
01/10/2025
Special inspection requirement — Structural Steel - High Strength Bolting
NANIK MASSAND
01/10/2025
Special inspection requirement — Structural Steel - Details
Luis Pichardo
01/10/2025
Special inspection requirement — Structural Steel - Welding
NANIK MASSAND
01/10/2025
Special inspection requirement — Structural Cold-Formed Steel
Luis Pichardo
01/10/2025
Special inspection requirement — Masonry
Luis Pichardo
01/10/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Luis Pichardo
01/10/2025
Special inspection requirement — Energy Code Compliance Inspections
Luis Pichardo
01/10/2025
Special inspection requirement — Concrete - Cast-In-Place
Luis Pichardo
01/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Luis Pichardo
01/10/2025
Special inspection requirement — Final
Luis Pichardo
11/22/2024
Filed — Alteration CO
VERT. ENLGMT ON EXTG 1-STRY, 1-FAM RESIDENCE. NEW INTER. RENOV.: INSTALLATION OF NEW GWB PARTITIONS, & NEW FINISHES FOR FLR, CLG & WALL. NEW LIGHT FIXTURES. NEW FLOOR & ROOF STRUCTURAL FRAMING. NEW ENTRY STEPS AT FRONT & REAR. NO CHANGE TO USE OR OCCUP.
Q00518011-P2
03/04/2024
Signed off — Alteration
PLUMBING SCOPE OF WORK IN-CONJUNCTION WITH VERTICAL ENLARGEMENT GENERAL CONSTRUCTION APPLICATION.
Q00577210-I1
12/28/2023
Signed off — Alteration
MECHANICAL SCOPE OF WORK IN-CONJUNCTION WITH VERTICAL ENLARGEMENT GENERAL CONSTRUCTION APPLICATION.
Q00577206-I1
12/21/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/13/2023
Signed off — Alteration
INSTALLATION OF CONSTRUCTION FENCE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q00483753-I1
12/13/2023
Permit issued — Construction Fence
Q00483753-I1-FN
12/01/2023
Filed — Alteration
MECHANICAL SCOPE OF WORK IN-CONJUNCTION WITH VERTICAL ENLARGEMENT GENERAL CONSTRUCTION APPLICATION.
Q00577206-P1
12/01/2023
Permit issued — Mechanical Systems
Q00577206-I1-MS
11/28/2023
Objection resolved — Addressed
11/27/2023
Objection raised — Other
11/20/2023
Filed — Alteration
PLUMBING SCOPE OF WORK IN-CONJUNCTION WITH VERTICAL ENLARGEMENT GENERAL CONSTRUCTION APPLICATION.
Q00577210-P1
11/20/2023
Filed — Alteration CO
VERT. ENLGMT ON EXTG 1-STRY, 1-FAM RESIDENCE. NEW INTER. RENOV.: INSTALLATION OF NEW GWB PARTITIONS, & NEW FINISHES FOR FLR, CLG & WALL. NEW LIGHT FIXTURES. NEW FLOOR & ROOF STRUCTURAL FRAMING. NEW ENTRY STEPS AT FRONT & REAR. NO CHANGE TO USE OR OCCUP.
Q00518011-P1
08/30/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/20/2023
Permit issued — General Construction
Q00518011-I1-GC-CX
06/08/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/18/2023
Permit issued — Plumbing
Q00577210-I1-PL
09/27/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/27/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/27/2022
Violation issued (ECB, closed)
Unknown
06/27/2022
Violation issued (ECB, closed)
Site Safety
06/27/2022
Violation issued (ECB, closed)
Construction
06/27/2022
Violation issued (ECB, closed)
Construction
06/09/2022
Permit issued — Plumbing
Q00577210-I1-PL
04/22/2022
Permit issued — Plumbing
Q00577210-I1-PL
04/04/2022
Permit issued — Construction Fence
Q00483753-I1-FN
03/24/2022
Violation issued (ECB, closed)
Construction
02/14/2022
Permit issued — Structural
Q00518011-I1-GC-CX
11/15/2021
Permit issued — Mechanical Systems
Q00577206-I1-MS
Latest 60 of 71 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FenceSigned-offPARAMOUNT PIPING INC12/13/2023
DOB NOWMechanical SystemsSigned-offPARAMOUNT PIPING INC12/01/2023
DOB NOWGeneral ConstructionPermit IssuedPARAMOUNT PIPING INC07/20/2023
DOB NOWPlumbingSigned-offSURPASS PLBG & HTG INC05/18/2023
DOB NOWPlumbingSigned-offTOP DOG PLBG & HTG CORP06/09/2022
DOB NOWPlumbingSigned-offDOVAL PLBG & HTG CORP04/22/2022
DOB NOWConstruction FenceSigned-offZ.L.A PROPERTIES MANAGEME04/04/2022
DOB NOWStructuralPermit IssuedZ.L.A PROPERTIES MANAGEME02/14/2022
DOB NOWMechanical SystemsSigned-offZ.L.A PROPERTIES MANAGEME11/15/2021
DOB NOWConstruction FenceSigned-offZ.L.A PROPERTIES MANAGEME04/26/2021
2 projects · most recent 01/23/2024
General Wiring
FiledStatusContractorScope
01/23/2024CompleteWCK ELECTRIC CORP.General Wiring
01/01/2022CancelledRJ ELECTRICAL CONTRACTORSGeneral Wiring
1 project · most recent 04/11/2025
Steel Concrete Masonry Wood
FiledStatusContractorScope
04/11/2025Permit IssuedPARAMOUNT PIPING INCSteel, Concrete, Masonry, Wood
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
12/21/2023Pass-Final CND-Occupancy InspectionPassView ↗
08/30/2023Pass-Final CND-Occupancy InspectionPassView ↗
06/08/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/27/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/27/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 86
DateRequirementInspectorRole
05/06/2025Fenestration areasLuis Pichardoenergy_progress
05/06/2025Concrete - Cast-In-PlaceLuis Pichardospecial
05/06/2025Structural Cold-Formed SteelLuis Pichardospecial
05/06/2025Structural Stability – Alterations of existing buildingsLuis Pichardospecial
05/06/2025Structural Steel - DetailsLuis Pichardospecial
05/06/2025MasonryLuis Pichardospecial
05/06/2025Fire-Resistant Penetrations and JointsLuis Pichardospecial
05/06/2025Structural Steel - WeldingNANIK MASSANDspecial
05/06/2025Structural Steel - High Strength BoltingNANIK MASSANDspecial
05/06/2025Footing and FoundationLuis Pichardoprogress
05/06/2025Energy Code Compliance InspectionsLuis Pichardoprogress
05/06/2025FinalLuis Pichardoprogress
05/06/2025Fire-Resistance Rated ConstructionLuis Pichardoprogress
05/06/2025Lighting controlsLuis Pichardoenergy_progress
05/06/2025Exterior lighting powerLuis Pichardoenergy_progress
05/06/2025Air barrier - visual inspectionLuis Pichardoenergy_progress
05/06/2025Interior lighting powerLuis Pichardoenergy_progress
05/06/2025Insulation placement and R valuesLuis Pichardoenergy_progress
05/06/2025Fenestration air leakageLuis Pichardoenergy_progress
05/06/2025Fenestration and door U-factor and product ratingsLuis Pichardoenergy_progress
01/10/2025Concrete - Cast-In-PlaceLuis Pichardospecial
01/10/2025Fire-Resistant Penetrations and JointsLuis Pichardospecial
01/10/2025MasonryLuis Pichardospecial
01/10/2025Structural Cold-Formed SteelLuis Pichardospecial
01/10/2025Structural Stability – Alterations of existing buildingsLuis Pichardospecial
Latest 25 of 86.
▾Documents — 99 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/27/2026Q00483753-I1Request digital key ↗
08/27/2026Q00577206-I1Request digital key ↗
08/27/2026Q00577206-P1Request digital key ↗
Showing 3 of 10 on file for this type
▸Zoning, Tax Lot & Property Records11
▸DOB NOWZoning Exhibit form (1-5)5
08/20/2026Q00518011-P3Open ↗
08/20/2026Q00518011-P2Open ↗
08/15/2026Q00518011-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram5
08/20/2026Q00518011-P3Open ↗
08/20/2026Q00518011-P2Open ↗
08/15/2026Q00518011-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00518011-I1Open ↗
▸Seals & Professional Certifications39
▸DOB NOWSpecial Inspector Seal & Signature16
09/02/2026Q00518011-I1Open ↗
09/02/2026Q00518011-I1Open ↗
09/02/2026Q00518011-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWProgress Inspector Seal & Signature13
09/02/2026Q00518011-I1Open ↗
09/02/2026Q00518011-I1Open ↗
09/01/2026Q00518011-P1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/27/2026Q00483753-I1Open ↗
08/27/2026Q00577206-I1Open ↗
08/23/2026Q00577210-I1Open ↗
Showing 3 of 10 on file for this type
▸Trade Schedules & Equipment5
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)5
08/20/2026Q00518011-P2Open ↗
08/20/2026Q00518011-P3Open ↗
08/15/2026Q00518011-I1Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist5
08/20/2026Q00518011-P3Open ↗
08/20/2026Q00518011-P2Open ↗
08/15/2026Q00518011-I1Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/27/2026Q00577206-I1Open ↗
08/23/2026Q00577210-P1Open ↗
08/23/2026Q00577210-I1Open ↗
Showing 3 of 9 on file for this type
▸Energy Compliance3
▸DOB NOWEN2: As Built Energy Analysis.3
08/13/2026Q00577206-I1Open ↗
08/13/2026Q00577210-I1Open ↗
08/13/2026Q00518011-I1Open ↗
▸Filing & Intake Forms1
▸DOB NOWAI1 Form (from plan PDF)1
08/16/2026Q00577210-P1Open ↗
▸Other Documents16
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
08/20/2026Q00518011-P3Open ↗
08/20/2026Q00518011-P2Open ↗
08/15/2026Q00518011-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlot Diagram5
08/20/2026Q00518011-P3Open ↗
08/20/2026Q00518011-P2Open ↗
08/15/2026Q00518011-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSite Survey: Initial5
08/20/2026Q00518011-P3Open ↗
08/20/2026Q00518011-P2Open ↗
08/15/2026Q00518011-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWFinal Survey1
08/13/2026Q00518011-I1Open ↗