← Back
Two family frame
90 COVERT STREET
BROOKLYN · BIN 3079205
💬 Discuss this project
1920Year Built
2Stories
B2Building Class
R6Zoning
2,040 sfGross Floor Area
2Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Two family frame · Owner of record: 90 COVERT, LLC · 1,700 sf lot · 1.2 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 21p · 1 filing · 15 docs
Floor 1
Cellar4p · 2 filings · 20 docs
Basement1p · 1 filing · 10 docs
1 job · most recent 10/14/2024
General Wiring
FiledStatusContractorScope
10/14/2024CompleteMAITLAND ELECTRIC CORP.General Wiring
Building Lifecycle
All (37)Filed (8)Permit Issued (5)Signed Off (5)Violation (1)Inspection (10)Special Inspection (8)
01/14/2026
Signed off — Alteration
relocate kitchen at basement level to living room. resurface floors and repaint partitions to existing 2 story with basement and cellar. No change to egress, use and occupancy. work to be done only at the cellar and basement floor.
B01227606-S1
09/29/2025
Signed off — Alteration
relocate kitchen at basement level to living room. resurface floors and repaint partitions to existing 2 story with basement and cellar. No change to egress, use and occupancy. work to be done only at the cellar and basement floor.
B01227606-I1
09/03/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/27/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/27/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/23/2025
Permit issued — General Construction
B01227606-I1-GC
05/23/2025
Permit issued — Plumbing
B01227606-S1-PL
05/20/2025
Filed — Alteration
relocate kitchen at basement level to living room. resurface floors and repaint partitions to existing 2 story with basement and cellar. No change to egress, use and occupancy. work to be done only at the cellar and basement floor.
B01227606-S1
05/18/2025
Filed — Alteration
relocate kitchen at basement level to living room. resurface floors and repaint partitions to existing 2 story with basement and cellar. No change to egress, use and occupancy. work to be done only at the cellar and basement floor.
B01227606-I1
05/18/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Alicea
05/18/2025
Special inspection requirement — Energy Code Compliance Inspections
William Alicea
05/18/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
William Alicea
05/18/2025
Special inspection requirement — Maintenance information
William Alicea
05/18/2025
Special inspection requirement — HVAC-R and service water heating system controls
William Alicea
05/18/2025
Special inspection requirement — HVAC-R and service water heating equipment
William Alicea
05/18/2025
Special inspection requirement — Metering
William Alicea
05/16/2025
Special inspection requirement — Final
William Alicea
04/01/2025
Signed off — Alteration
application filed for ac condenssors and blowers.
B01200433-I1
03/31/2025
Permit issued — Mechanical Systems
B01200433-I1-MS
03/26/2025
Filed — Alteration
application filed for ac condenssors and blowers.
B01200433-I1
03/11/2025
Signed off — Alteration
INTERIOR WORK, REPLACE SHEET ROCK, FLOORS, DOORS, PAINTING.
B00951367-I1
03/10/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
02/06/2025
Filed — Alteration
INTERIOR WORK, REPLACE SHEET ROCK, FLOORS, DOORS, PAINTING.
B00951367-P3
01/24/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
01/18/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
12/16/2024
Filed — Alteration
INTERIOR WORK, REPLACE SHEET ROCK, FLOORS, DOORS, PAINTING.
B00951367-P2
12/10/2024
Signed off — Alteration
INTERIOR WORK, REPLACE SHEET ROCK, FLOORS, DOORS, PAINTING.
B00951367-S1
11/04/2024
Filed — Alteration
INTERIOR WORK, REPLACE SHEET ROCK, FLOORS, DOORS, PAINTING.
B00951367-P1
10/11/2024
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
10/03/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/02/2024
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
08/06/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/05/2024
Permit issued — Plumbing
B00951367-S1-PL
12/07/2023
Filed — Alteration
INTERIOR WORK, REPLACE SHEET ROCK, FLOORS, DOORS, PAINTING.
B00951367-S1
11/16/2023
Permit issued — General Construction
B00951367-I1-GC
11/13/2023
Filed — Alteration
INTERIOR WORK, REPLACE SHEET ROCK, FLOORS, DOORS, PAINTING.
B00951367-I1
09/06/2004
Violation issued (HPD, closed)
C
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RAISNER GROUP707/08/2026
138-09 JAMAICA AVE1707/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/15/2025$1.2M—90 CONVERT STREET LLC → 90 COVERT, LLC$605/sf building
10/12/2023$450K—JACK AND JEWELS PROPERTIES LLC → 90 COVERT STREET LLC$221/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CHUN ENGINEERING CONSULTANT PLLC205/20/2025
HAYM S. GROSS, ARCHITECT603/26/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BRITZ ENTERPRISES INC.1203/21/2026
BARRAN DESIGNS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BIGGER THAN BUILDINGS LLCGeneral Contractor407/08/2026
MAITLAND ELECTRIC CORP.Electrical103/22/2026
NYC BUILDING SOLUTIONS COGeneral Contractor107/08/2026
JUST PLBG & HTG INCPlumbing107/08/2026
TRI STATE PLBG & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
WORLD DESIGN ARCHITECTURE9323105/20/2025
RIKE TECH ASSOCIATES LLC2965103/26/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offNYC BUILDING SOLUTIONS CO05/23/2025
DOB NOWPlumbingSigned-offMOHAMED ABDELRAZEK05/23/2025
DOB NOWMechanical SystemsSigned-offBIGGER THAN BUILDINGS LLC03/31/2025
DOB NOWPlumbingSigned-offDW PLUMBING INC02/05/2024
DOB NOWGeneral ConstructionSigned-offBIGGER THAN BUILDINGS LLC11/16/2023
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
09/03/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/27/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/27/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/10/2025Pass-Final General Construction Non-Directive 14PassView ↗
01/24/2025Fail-Final General Construction Non-Directive 14FailView ↗
01/18/2025Fail-Final General Construction Non-Directive 14FailView ↗
10/11/2024Fail-Final General Construction Non-Directive 14FailView ↗
10/03/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/02/2024Fail-Final General Construction Non-Directive 14FailView ↗
08/06/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
05/18/2025Fire-Resistant Penetrations and JointsWilliam Aliceaspecial
05/18/2025Energy Code Compliance InspectionsWilliam Aliceaprogress
05/18/2025HVAC-R and service water piping design and insulationWilliam Aliceaenergy_progress
05/18/2025Maintenance informationWilliam Aliceaenergy_progress
05/18/2025HVAC-R and service water heating system controlsWilliam Aliceaenergy_progress
05/18/2025HVAC-R and service water heating equipmentWilliam Aliceaenergy_progress
05/18/2025MeteringWilliam Aliceaenergy_progress
05/16/2025FinalWilliam Aliceaprogress
▾Documents — 28 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/26/2026B00951367-I1Request digital key ↗
08/26/2026B00951367-S1Request digital key ↗
08/26/2026B00951367-P1Request digital key ↗
Showing 3 of 8 on file for this type
▸Seals & Professional Certifications12
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/26/2026B00951367-I1Open ↗
08/26/2026B00951367-S1Open ↗
08/26/2026B00951367-P2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
08/29/2026B01227606-I1Open ↗
08/23/2026B01227606-S1Open ↗
08/23/2026B01227606-S1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/23/2026B01227606-S1Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/26/2026B00951367-I1Open ↗
08/26/2026B00951367-S1Open ↗
08/26/2026B00951367-P2Open ↗
Showing 3 of 8 on file for this type