← Back
Two stories - detached, small or mid-size
90 ERASTINA PLACE
STATEN ISLAND · Mariner's Harbor-Arlington-Graniteville · BIN 5027473
💬 Discuss this project
1915Year Built
2.5Stories
A1Building Class
R3AZoning
2,450 sfGross Floor Area
1Units
3 Open Violations ▸FDNY Report ↗
Two stories - detached, small or mid-size · 6,800 sf lot · 0.36 FAR built · Flood zone X
Locations of Work
Electrical
Roof1 filing · 4 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TOM PETERSEN ARCHITECT, LLC102/28/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NYS ESSENTIAL POWER INCGeneral Contractor303/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
THOMAS PETERSEN ARCHITECT7854102/28/2024
Building Lifecycle
All (8)Filed (1)Permit Issued (1)Signed Off (1)Violation (5)
10/07/2025
Violation issued (ECB, open)
Construction
10/01/2025
Violation issued (ECB, open)
Construction
09/26/2024
Violation issued (ECB, closed)
Construction
09/26/2024
Violation issued (ECB, closed)
Construction
09/26/2024
Violation issued (ECB, open)
Construction
03/26/2024
Signed off — Alteration
Installation of PV System on existing rooftop. No changes to Egress or use of occupancy.
S01012030-I1
03/04/2024
Permit issued — Solar
S01012030-I1-SL
02/28/2024
Filed — Alteration
Installation of PV System on existing rooftop. No changes to Egress or use of occupancy.
S01012030-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offNYS ESSENTIAL POWER INC03/04/2024
2 projects · most recent 03/05/2024
FiledStatusContractorScope
03/05/2024CompleteAMBER ELECTL CONTNG INC1 meters
02/27/2024CompleteAMBER ELECTL CONTNG INC—
Nothing on file for this building.
▾Documents — 4 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/21/2026S01012030-I1Request digital key ↗
▸Seals & Professional Certifications1
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/21/2026S01012030-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/21/2026S01012030-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026S01012030-I1Open ↗