| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 08/19/2025 | Permit Issued | 90 JOHN MAZAL SPE OWNER | Associated Ducts and Piping, Heating and Air Conditioning Systems, Heating Systems, Others | Heat / Cool Ice Air RSXC13 12,500 BTU · Ptac ×145 Heating Renewaire EK-1210010SCCHR--23-1SV-N 725 BTU · Electric Heater ×1 EK-1410016SCCHL-23-1SV-N 755 CFM · Electric Heater ×1 Ventilation Greenheck SQ-160-VG 2,280 CFM · Exhaust Fan ×2 Loren Cook 100SQN28D 755 CFM · Exhaust Fan ×2 Ducts & Piping N/A N/A 1 CFM · Ductwork ×1 Other |
| 06/23/2025 | Permit Issued | ARBORCON CONSTRUCTION INC | Heating and Air Conditioning Systems | Heat / Cool Samsung AM072BXVGFH/A 43,865 BTU · Vrf Outdoor ×2 AM120BXVGFH/A 99,873 BTU · Vrf Outdoor ×2 AM144BXVGFH/A 142,157 BTU · Vrf Outdoor ×2 AM168BXVGFH/A 171,982 BTU · Vrf Outdoor ×2 AC018BXADCH/A 17,400 BTU · Vrf Indoor ×1 AM096BXVGFH/A 30,723 BTU · Vrf Outdoor ×1 AM312BXVGFR/A 230,982 BTU · Vrf Outdoor ×1 |
| 10/20/2023 | Permit Issued | LIBERTY NY RESTORATION IN | Associated Ducts and Piping | Ducts & Piping N/A n/a Ductwork ×2 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/19/2025 | Signed-off | CAPITOL FIRE SPRINKLER CO | Sprinkler System |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/19/2025 | Permit Issued | HEADQUARTERS MECH INC | Water/Sanitary |
| 07/28/2022 | Signed-off | HEADQUARTERS MECH INC | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/11/2026 | Permit Issued | AUJLA ELECTRIC CORP | — |
| 01/11/2024 | Permit Issued | CONTACT ELECTRIC CORP | — |
| 01/02/2024 | Permit Issued | ENNELL GRP ELECTRIC CORP | General Wiring |
| 01/02/2024 | Complete | ENNELL GRP ELECTRIC CORP | General Wiring |
| 01/02/2024 | Permit Issued | ENNELL GRP ELECTRIC CORP | General Wiring |
| 07/12/2023 | Permit Issued | D&D ELECTL CONST CO INC | General Wiring |
| 05/02/2023 | Complete | ASSET ELECTRIC CORP | — |
| 03/24/2023 | Permit Issued | ENNELL GRP ELECTRIC CORP | General Wiring |
| 10/03/2022 | Complete | D&D ELECTL CONST CO INC | General Wiring, Lighting |
| 08/31/2022 | Permit Issued | BLUE SEAGULL ELECTRICAL | — |
| 07/27/2022 | Complete | GOLDMAN ELECTRIC CORP. | General Wiring |
| 06/22/2022 | Complete | SOLO ENERGY & ELECTRICAL | Lighting |
| 07/08/2021 | Permit Issued | ROBERT CHIMENTI | 7 meters, 1 new_meters |
| 12/31/2020 | Permit Issued | TOP SHELF ELECTRIC CORP | General Wiring |
| 01/29/2020 | Complete | A.S.K. ELECTRICAL CORP | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/19/2025 | Permit Issued | 90 JOHN MAZAL SPE OWNER | Steel, Concrete |
| 06/02/2025 | — | — | Steel |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 03/05/2024 | Permit Issued | BK CONSTRUCTION SVCS INC | Scaffold |
| 12/06/2023 | Permit Issued | PLATINUM SERVICES NY LLC | Sidewalk Shed |
| 10/09/2023 | Signed-off | PLATINUM SERVICES NY LLC | Scaffold |
| 05/19/2023 | Permit Issued | TRI BOROUGH SCAFFOLDING | Scaffold |
| 03/16/2023 | — | — | Sidewalk Shed |
| 06/07/2021 | Permit Issued | PLATINUM SERVICES NY LLC | Fence |
| 03/30/2020 | Permit Issued | NY DEVELOPERS & MANAGEMEN | Fence |
| 02/25/2019 | Permit Issued | PLATINUM SERVICES NY LLC | Scaffold |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/16/2023 | Permit Issued | BLUE JAY CONTRACTING INC | Tenant Protection Plan 72 Hour |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/14/2026 | Permit Issued | SHR3 CONSTRUCTION CORP | Suspended Scaffold (SC) |
| 08/25/2025 | Permit Issued | A1 SPECIALIZED, INC | Suspended Scaffold (SC) |
| 03/12/2025 | Signed-off | SHR3 CONSTRUCTION CORP | Suspended Scaffold (SC) |
| Owner | Filings | Most Recent |
|---|---|---|
| BLUE JAY CONTRACTING | 7 | 09/18/2026 |
| MOINIAN GROUP | 185 | 07/22/2026 |
| ROCK GROUP NY | 19 | 07/08/2026 |
| TRI BOROUGH SCAFFOLDING | 3 | 07/08/2026 |
| BK CONSTRUCTIONDBA SRT CONSTRUCTION | 5 | 07/08/2026 |
| PLATINUM SERVICES NY | 20 | 07/08/2026 |
| SAFON OWNER LLC | 7 | 03/22/2026 |
| 90 JOHN STREET CONDO BOAR | 38 | 03/22/2026 |
| ELI ACQUISITION LLC | 9 | 03/22/2026 |
| SERVICES NY LLC PLATINUM | 1 | 03/22/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| PEPAJ ENGINEERING PLLC | 2 | 08/04/2026 |
| KZ ENGINEERING, P.C | 2 | 07/14/2026 |
| HILL WEST ARCHITECTS | 1 | 11/24/2025 |
| MOHAMMAD AHEAD, PE | 1 | 10/06/2025 |
| AKM ARCHITECTS LLP | 5 | 08/19/2025 |
| DAGHER ENGINEERING PLLC | 10 | 06/23/2025 |
| MCNAMARA SALVIA | 7 | 06/02/2025 |
| ASHRAF CORP | 5 | 03/05/2024 |
| R.J. MCGEE ENGINEERING, PLLC | 3 | 10/20/2023 |
| DAVID CHAGNON ARCHITECTURAL DESIGN | 2 | 10/20/2023 |
| FL&M ENGINEERING DESIGN &INSPECTION | 1 | 05/19/2023 |
| BARLOW ENGINEERING | 1 | 03/16/2023 |
| THE MOINIAN GROUP | 4 | 07/28/2022 |
| FMC ENGINEERING, PC | 1 | 01/22/2020 |
| ASIF JAMIL, RA | 5 | 10/20/2019 |
| IMC ARCHITECTURE DPC | 1 | 05/31/2019 |
| Representative | Filings | Most Recent |
|---|---|---|
| EAST COAST EXPEDITING | 22 | 03/21/2026 |
| DOMANI CONSULTING | 1 | 03/21/2026 |
| TOP OUT CONSULTANTS | 6 | 03/21/2026 |
| GREEN STUDIO | 18 | 03/21/2026 |
| RENNON CONSTRUCTION | 2 | 03/21/2026 |
| SOMMA DESIGN CONSULTING | 2 | 03/21/2026 |
| EA DESIGN GROUP | 18 | 03/21/2026 |
| SYNERGY BUILDING CONSULTANTS | 1 | 03/21/2026 |
| RIGGING CONSULTANTS | 2 | 03/21/2026 |
| BERNARD J WILLIAMS ASSOC | 1 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| PLATINUM SERVICES NY LLC | General Contractor | 29 | 07/08/2026 |
| PREMIER SANITATION LLC | General Contractor | 12 | 07/08/2026 |
| DNP BUILDERS LLC | General Contractor | 9 | 07/08/2026 |
| 90 JOHN MAZAL SPE OWNER | General Contractor | 8 | 07/08/2026 |
| LIBERTY NY RESTORATION IN | General Contractor | 5 | 07/08/2026 |
| ROCK GROUP NY CORP | General Contractor | 5 | 07/08/2026 |
| BK CONSTRUCTION SVCS INC | General Contractor | 4 | 07/08/2026 |
| JIMCO RENOVATION CORP | General Contractor | 4 | 03/21/2026 |
| HEADQUARTERS MECH INC | Plumbing | 3 | 07/08/2026 |
| NY DEVELOPERS & MANAGEMENT | General Contractor | 3 | 03/21/2026 |
| BLUE JAY CONTRACTING INC | General Contractor | 3 | 09/18/2026 |
| NEW YORK STANDARD MECH CO | Fire Protection | 2 | 07/08/2026 |
| ARBORCON CONSTRUCTION INC | General Contractor | 2 | 04/09/2026 |
| CAPITOL FIRE SPRINKLER CO | Fire Protection | 2 | 07/08/2026 |
| FOLOR INC | General Contractor | 2 | 03/21/2026 |
| TISHMAN INTERIORS CORP | General Contractor | 2 | 03/21/2026 |
| OUTFRONT MEDIA LLC | Electrical | 2 | 03/21/2026 |
| NEW YORK STANDARD MECH CORP | Plumbing | 1 | 07/08/2026 |
| CLEANTHIS MEIMAROGLOU | Electrical | 1 | 03/21/2026 |
| JOHN O'KANE | Electrical | 1 | 03/21/2026 |
| MEIMAROGLOU CLEANTHIS | Electrical | 1 | 03/21/2026 |
| NATIONAL MAINTENANCE INC | Electrical | 1 | 03/21/2026 |
| O'KANE JOHN | Electrical | 1 | 03/21/2026 |
| SOLAR ELEC. SYSTEMS, INC. | Electrical | 1 | 03/22/2026 |
| WNW & SONS PLUMBING & HTG | Fire Protection | 1 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| VERSAI LLC | 8133 | 1 | 08/04/2026 |
| KZ ENGINEERING, P.C. | 4665 | 2 | 07/14/2026 |
| MOHAMMAD AHEAD - PROFESSI | 9286 | 1 | 10/06/2025 |
| DELTA TESTING LABS | 687 | 18 | 08/19/2025 |
| 20/20 INSPECTIONS INC | 1471 | 2 | 06/23/2025 |
| AK ENGINEERING PC | 678 | 5 | 10/20/2023 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Sidewalk Shed | Permit Issued | BLUE JAY CONTRACTING INC | 09/17/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | BLUE JAY CONTRACTING INC | 09/17/2026 |
| DOB NOW | Suspended Scaffold | Permit Issued | SHR3 CONSTRUCTION CORP | 07/21/2026 |
| DOB NOW | Suspended Scaffold | Signed-off | SHR3 CONSTRUCTION CORP | 06/30/2026 |
| DOB NOW | General Construction | Permit Issued | BLUE JAY CONTRACTING INC | 06/23/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | ARBORCON CONSTRUCTION INC | 03/25/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | ARBORCON CONSTRUCTION INC | 11/20/2025 |
| DOB NOW | Supported Scaffold | Signed-off | PLATINUM SERVICES NY LLC | 10/14/2025 |
| DOB NOW | Suspended Scaffold | Permit Issued | A1 SPECIALIZED, INC | 10/14/2025 |
| DOB NOW | Sidewalk Shed | Signed-off | PLATINUM SERVICES NY LLC | 09/26/2025 |
| DOB NOW | Suspended Scaffold | Permit Issued | A1 SPECIALIZED, INC | 09/25/2025 |
| DOB NOW | Suspended Scaffold | Signed-off | SHR3 CONSTRUCTION CORP | 03/14/2025 |
| DOB NOW | Supported Scaffold | Permit Issued | BK CONSTRUCTION SVCS INC | 03/04/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | 90 JOHN MAZAL SPE OWNER | 12/19/2024 |
| DOB NOW | Sidewalk Shed | Permit Issued | PLATINUM SERVICES NY LLC | 12/04/2024 |
| DOB NOW | Structural | Signed-off | 90 JOHN MAZAL SPE OWNER | 11/29/2024 |
| DOB NOW | General Construction | Permit Issued | 90 JOHN MAZAL SPE OWNER | 11/26/2024 |
| DOB NOW | Sprinklers | Signed-off | CAPITOL FIRE SPRINKLER CO | 10/08/2024 |
| DOB NOW | Supported Scaffold | Signed-off | PLATINUM SERVICES NY LLC | 10/07/2024 |
| DOB NOW | Sidewalk Shed | Signed-off | PLATINUM SERVICES NY LLC | 10/01/2024 |
| DOB NOW | General Construction | Permit Issued | 90 JOHN MAZAL SPE OWNER | 06/20/2024 |
| DOB NOW | General Construction | Permit Issued | DNP BUILDERS LLC | 06/12/2024 |
| DOB NOW | General Construction | Permit Issued | TISHMAN INTERIORS CORP | 06/07/2024 |
| DOB NOW | Plumbing | Permit Issued | HEADQUARTERS MECH INC | 04/01/2024 |
| DOB NOW | Sidewalk Shed | Permit Issued | PLATINUM SERVICES NY LLC | 12/07/2023 |
| DOB NOW | Supported Scaffold | Signed-off | PLATINUM SERVICES NY LLC | 10/10/2023 |
| DOB NOW | Sidewalk Shed | Signed-off | PLATINUM SERVICES NY LLC | 10/06/2023 |
| DOB NOW | General Construction | Permit Issued | JIMCO RENOVATION CORP | 09/26/2023 |
| DOB NOW | General Construction | Permit Issued | JIMCO RENOVATION CORP | 09/22/2023 |
| DOB NOW | Sprinklers | Signed-off | CAPITOL FIRE SPRINKLER CO | 09/19/2023 |
| DOB NOW | Structural | Signed-off | DNP BUILDERS LLC | 09/12/2023 |
| DOB NOW | Supported Scaffold | Permit Issued | BK CONSTRUCTION SVCS INC | 08/11/2023 |
| DOB NOW | General Construction | Permit Issued | DNP BUILDERS LLC | 06/15/2023 |
| DOB NOW | Mechanical Systems | Permit Issued | DNP BUILDERS LLC | 06/07/2023 |
| DOB NOW | Supported Scaffold | Permit Issued | TRI BOROUGH SCAFFOLDING | 05/19/2023 |
| DOB NOW | Plumbing | Permit Issued | NEW YORK STANDARD MECH CO | 04/10/2023 |
| DOB NOW | Mechanical Systems | Permit Issued | DNP BUILDERS LLC | 03/22/2023 |
| DOB NOW | General Construction | Permit Issued | DNP BUILDERS LLC | 03/22/2023 |
| DOB NOW | Plumbing | Permit Issued | HEADQUARTERS MECH INC | 03/06/2023 |
| DOB NOW | Sprinklers | Signed-off | WNW & SONS PLUMBING & HTG | 12/01/2022 |
| Date | Type | Result | Report |
|---|---|---|---|
| 08/07/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 05/22/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 01/16/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 12/23/2024 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 12/17/2024 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 12/16/2024 | Fail-Final CND-Occupancy Inspection | Fail | View ↗ |
| 11/15/2024 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 01/11/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 10/20/2023 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 10/06/2023 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 09/27/2023 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 05/23/2023 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 04/14/2023 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 03/06/2023 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 03/01/2023 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 02/24/2023 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 11/25/2022 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 10/27/2022 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 09/06/2022 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 09/06/2022 | Fail-Final CND-Occupancy Inspection | Fail | View ↗ |
| 08/31/2022 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 07/28/2026 | Masonry | Klodian Pepaj | special |
| 07/28/2026 | Final | Klodian Pepaj | progress |
| 07/28/2026 | Tenant Protection Plan Compliance | — | special |
| 11/24/2025 | Tenant Protection Plan Compliance | — | special |
| 09/12/2025 | Fire-Resistant Penetrations and Joints | — | special |
| 09/12/2025 | Final | — | progress |
| 09/12/2025 | Fire-Resistance Rated Construction | — | progress |
| 08/26/2025 | Fire-Resistance Rated Construction | RICHARD GREENWALD | progress |
| 08/26/2025 | Fire-Resistant Penetrations and Joints | RICHARD GREENWALD | special |
| 08/25/2025 | Fire-Resistant Penetrations and Joints | RICHARD GREENWALD | special |
| 08/25/2025 | Fire-Resistance Rated Construction | RICHARD GREENWALD | progress |
| 06/02/2025 | Tenant Protection Plan Compliance | JACOB HAAS | special |
| 05/27/2025 | Tenant Protection Plan Compliance | JACOB HAAS | special |
| 05/19/2025 | Final | JACOB HAAS | progress |
| 05/19/2025 | Mechanical Systems | JACOB HAAS | special |
| 04/29/2025 | Structural Steel - Details | JACOB HAAS | special |
| 04/29/2025 | Structural Steel - High Strength Bolting | JACOB HAAS | special |
| 04/29/2025 | Structural Steel - Welding | JACOB HAAS | special |
| 04/29/2025 | Final | JACOB HAAS | progress |
| 03/12/2025 | Alternative Materials - OTCR Buildings Bulletin Number | Karol Zdancewicz | special |
| 03/12/2025 | Post-installed Anchors | Karol Zdancewicz | special |
| 12/18/2024 | Sprinkler Systems | RICHARD GREENWALD | special |
| 12/12/2024 | Final | RICHARD GREENWALD | progress |
| 12/12/2024 | Post-installed Anchors | RICHARD GREENWALD | special |
| 12/12/2024 | Structural Steel - High Strength Bolting | RICHARD GREENWALD | special |