One story retail building
900 60TH STREET
BROOKLYN · BIN 3141179
💬 Discuss this project
1964Year Built
1Stories
K1Building Class
M1-1Zoning
18,000 sfGross Floor Area
1Units
0 Active ViolationsFDNY Report ↗
One story retail building · Owner of record: 90060 AMG · 18,000 sf lot · 1 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire ProtectionGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofChange use and occupancy, new partition4p · 1 filing · 20 docs
Floor 1Kids Palace BK35p · 3 filings · 20 docs
Site & exteriorCommercial space renovation and repair6p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
UB Contracting3407/08/2026
1047 E 46th Street603/21/2026
900 60th Street Realty603/21/2026
Citadel Cinemas303/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/19/2016$9.3M—900 60TH STREET REALTY CORP. → WJ & C INVESTMENT LLC$515/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GC Engineering & Associates1106/15/2026
J&R Design and Inspection106/01/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
High Quality 338803/21/2026
R I Expediting Services1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
U B ContractingGeneral Contractor303/21/2026
Kle ConstructionGeneral Contractor303/21/2026
M & J BuildGeneral Contractor303/21/2026
Kale ConstructionGeneral Contractor207/08/2026
Whitestone PlumbingPlumbing107/08/2026
U B ContractingScaffold107/08/2026
Whitestone PlumbingFire Protection107/08/2026
KJK ElectricElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GC Engineering & Associates1796306/15/2026
Century Testing & Consulting4081406/12/2025
J&R Design and Inspection6637203/03/2025
Building Lifecycle
All (87)Filed (12)Permit Issued (8)Signed Off (3)Violation (9)Inspection (12)Objection (13)Special Inspection (30)
06/15/2026
Filed — Alteration CO
NEW RATED PARTITION AS NEEDED TO CHANGE USE FROM UG 17 (APPAREL MANUFACTURING) TO UG VIII (FAMILY RECREATION & ACTIVITY SPACE), UG IIIB (COMMUNITY FACILITY AMBULATORY HEALTH FACILITY) AND UG IV(B) COMMUNICATION INFRASTRUCTURE. CHANGE OCCUPANCY AS SHOWN
B01092395-P3
03/30/2026
Special inspection requirement — Mechanical Systems
Gene Eng
03/30/2026
Special inspection requirement — Permanent certificate
Gene Eng
03/30/2026
Special inspection requirement — HVAC-R and service water heating equipment
Gene Eng
03/30/2026
Special inspection requirement — Duct leakage testing, insulation and design
Gene Eng
03/30/2026
Special inspection requirement — Final
Peter Kanakos
03/30/2026
Special inspection requirement — Ventilation and air distribution system
Gene Eng
03/30/2026
Special inspection requirement — HVAC-R and service water heating system controls
Gene Eng
03/30/2026
Special inspection requirement — Maintenance information
Gene Eng
03/30/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Gene Eng
01/30/2026
Signed off — Alteration CO
NEW RATED PARTITION AS NEEDED TO CHANGE USE FROM UG 17 (APPAREL MANUFACTURING) TO UG VIII (FAMILY RECREATION & ACTIVITY SPACE), UG IIIB (COMMUNITY FACILITY AMBULATORY HEALTH FACILITY) AND UG IV(B) COMMUNICATION INFRASTRUCTURE. CHANGE OCCUPANCY AS SHOWN
B01092395-S3
10/18/2025
Violation issued (FDNY_NOV, closed)
06/20/2025
Objection raised — Zoning
06/12/2025
Filed — Alteration CO
NEW RATED PARTITION AS NEEDED TO CHANGE USE FROM UG 17 (APPAREL MANUFACTURING) TO UG VIII (FAMILY RECREATION & ACTIVITY SPACE), UG IIIB (COMMUNITY FACILITY AMBULATORY HEALTH FACILITY) AND UG IV(B) COMMUNICATION INFRASTRUCTURE. CHANGE OCCUPANCY AS SHOWN
B01092395-P2
06/11/2025
Violation issued (ECB, closed)
Construction
06/11/2025
Special inspection requirement — Lighting controls
ALDO BRAVO
06/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALDO BRAVO
06/11/2025
Special inspection requirement — Energy Code Compliance Inspections
ALDO BRAVO
06/11/2025
Special inspection requirement — Interior lighting power
ALDO BRAVO
06/10/2025
Signed off — Alteration
RENOVATION OF EXIST. COMMERCIAL SPACE WITH, REMOVE AWNING, ROLLING GATE, WALL, STOREFRONT, DOOR, PARTITION, CEILING, FLOOR TILE, REPAIR/REPLACE/NEW PARTITION, FLOOR, STOREFRONT, DOOR, PAINTING AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00747399-I1
06/06/2025
Violation issued (FDNY_NOV, closed)
06/06/2025
Violation issued (FDNY_ORDER, closed)
04/07/2025
Filed — Alteration CO
NEW RATED PARTITION AS NEEDED TO CHANGE USE FROM UG 17 (APPAREL MANUFACTURING) TO UG VIII (FAMILY RECREATION & ACTIVITY SPACE), UG IIIB (COMMUNITY FACILITY AMBULATORY HEALTH FACILITY) AND UG IV(B) COMMUNICATION INFRASTRUCTURE. CHANGE OCCUPANCY AS SHOWN
B01092395-P1
04/01/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALDO BRAVO
04/01/2025
Special inspection requirement — Energy Code Compliance Inspections
ALDO BRAVO
04/01/2025
Special inspection requirement — Lighting controls
ALDO BRAVO
04/01/2025
Special inspection requirement — Interior lighting power
ALDO BRAVO
03/28/2025
Permit issued — Mechanical Systems
B01092395-S4-MS
03/27/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
03/20/2025
Permit issued — General Construction
B00747399-I1-GC
03/14/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
03/05/2025
Special inspection requirement — Fenestration areas
FRANZ SEBORGA
03/05/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
FRANZ SEBORGA
03/05/2025
Special inspection requirement — Masonry
ALDO BRAVO
03/05/2025
Special inspection requirement — Air barrier - visual inspection
FRANZ SEBORGA
03/05/2025
Special inspection requirement — Fenestration air leakage
FRANZ SEBORGA
03/05/2025
Special inspection requirement — Energy Code Compliance Inspections
ALDO BRAVO
03/05/2025
Special inspection requirement — Final
FRANZ SEBORGA
03/05/2025
Special inspection requirement — Fire-Resistance Rated Construction
ALDO BRAVO
03/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALDO BRAVO
03/03/2025
Filed — Alteration
RENOVATION OF EXIST. COMMERCIAL SPACE WITH, REMOVE AWNING, ROLLING GATE, WALL, STOREFRONT, DOOR, PARTITION, CEILING, FLOOR TILE, REPAIR/REPLACE/NEW PARTITION, FLOOR, STOREFRONT, DOOR, PAINTING AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00747399-P2
02/23/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Robert Truskosky
02/23/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Truskosky
02/23/2025
Special inspection requirement — Masonry
Robert Truskosky
02/23/2025
Special inspection requirement — Energy Code Compliance Inspections
ALDO BRAVO
02/21/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/07/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
02/01/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/22/2025
Permit issued — General Construction
B01092395-I1-GC
01/21/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
01/21/2025
Inspection — Certified Sprinkler - SP - Roughing
Certified
View inspection ↗
01/11/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/08/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
01/08/2025
Inspection — Certified Sprinkler - SP - Roughing
Certified
View inspection ↗
01/07/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
01/02/2025
Objection resolved — Addressed
12/31/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/20/2024
Signed off — Alteration
B00747760-I1
12/05/2024
Objection resolved — Addressed
11/29/2024
Objection raised — Scope
Latest 60 of 87 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedM & J Build03/28/2025
DOB NOWGeneral ConstructionSigned-offKale Construction03/20/2025
DOB NOWGeneral ConstructionPermit IssuedKale Construction01/22/2025
DOB NOWSprinklersSigned-offTemperini Mechanical11/22/2024
DOB NOWPlumbingSigned-offWhitestone Plumbing11/12/2024
DOB NOWGeneral ConstructionSigned-offKle Construction09/06/2024
DOB NOWGeneral ConstructionSigned-offU B Contracting01/03/2024
DOB NOWConstruction FenceSigned-offU B Contracting01/03/2024
BISSPISSUEDAllstate Sprinkler05/01/2018
BISOTISSUEDThe Martin Group New York04/27/2018
BISOTISSUEDThe Martin Group New York04/26/2018
BISOTISSUEDParr Construction04/22/2010
BISFPISSUEDAll Fire Systems06/06/2005
BISFPISSUEDAll Fire Systems09/05/2003
BISOTISSUEDJames Woerner07/24/2003
BISSPISSUEDAbco-Peerless Sprinkler02/06/2003
BIS—ISSUEDCablevision Systems NYC12/13/2002
BIS—ISSUEDHsu & Associates09/12/2002
BISMHISSUEDNucor Construction07/31/2002
BISPLISSUEDLab Plumbing & Heating Co06/13/2002
BISOTISSUEDNucor Construction05/20/2002
BISOTISSUEDNucor Construction04/25/2002
BISPLISSUEDMajor Plumbing & Heating09/11/1996
BIS—ISSUEDLST Construction09/11/1996
BISSPISSUEDDependable Sprinkler09/09/1996
BISPLISSUEDWasoff Plumbing & Utility Co01/04/1996
1 project · most recent 06/15/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
06/15/2026Permit IssuedM & J BuildHeating and Air Conditioning Systems
Heat / Cool
York DM120N15N2AAA2B 10 tons · Rooftop Unit ×2
DM240N24N2AAA2B 20 tons · Rooftop Unit ×2
3 projects · most recent 11/22/2024
General Wiring
FiledStatusContractorScope
11/22/2024CompleteKJK ElectricGeneral Wiring
09/25/2024CompleteHV ElectricGeneral Wiring
07/16/2018CompleteC.M. Richey Electrical ContractingGeneral Wiring
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
03/27/2025Pass-Final General Construction Non-Directive 14PassView ↗
03/14/2025Fail-Final General Construction Non-Directive 14FailView ↗
02/21/2025Pass-Final CND-Occupancy InspectionPassView ↗
02/07/2025Fail-Final General Construction Non-Directive 14FailView ↗
02/01/2025Pass-Final CND-Occupancy InspectionPassView ↗
01/21/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/21/2025Certified Sprinkler - SP - RoughingCertifiedView ↗
01/11/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/08/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/08/2025Certified Sprinkler - SP - RoughingCertifiedView ↗
01/07/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/31/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 38
DateRequirementInspectorRole
03/30/2026Mechanical SystemsGene Engspecial
03/30/2026Permanent certificateGene Engenergy_progress
03/30/2026HVAC-R and service water heating equipmentGene Engenergy_progress
03/30/2026Duct leakage testing, insulation and designGene Engenergy_progress
03/30/2026FinalPeter Kanakosprogress
03/30/2026Ventilation and air distribution systemGene Engenergy_progress
03/30/2026HVAC-R and service water heating system controlsGene Engenergy_progress
03/30/2026Maintenance informationGene Engenergy_progress
03/30/2026HVAC-R and service water piping design and insulationGene Engenergy_progress
06/11/2025Lighting controlsALDO BRAVOenergy_progress
06/11/2025Fire-Resistant Penetrations and JointsALDO BRAVOspecial
06/11/2025Energy Code Compliance InspectionsALDO BRAVOprogress
06/11/2025Interior lighting powerALDO BRAVOenergy_progress
04/01/2025Fire-Resistant Penetrations and JointsALDO BRAVOspecial
04/01/2025Energy Code Compliance InspectionsALDO BRAVOprogress
04/01/2025Lighting controlsALDO BRAVOenergy_progress
04/01/2025Interior lighting powerALDO BRAVOenergy_progress
03/05/2025Fenestration areasFRANZ SEBORGAenergy_progress
03/05/2025Fenestration and door U-factor and product ratingsFRANZ SEBORGAenergy_progress
03/05/2025MasonryALDO BRAVOspecial
03/05/2025Air barrier - visual inspectionFRANZ SEBORGAenergy_progress
03/05/2025Fenestration air leakageFRANZ SEBORGAenergy_progress
03/05/2025Energy Code Compliance InspectionsALDO BRAVOprogress
03/05/2025FinalFRANZ SEBORGAprogress
03/05/2025Fire-Resistance Rated ConstructionALDO BRAVOprogress
Latest 25 of 38.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Kids Palace BKArts / Culture / EntertainmentFloor 1
Project B01144920 No Work · PA Certificate of Operation Issued · 11/21/2024
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 160 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/29/2026B00747760-I1Request digital key ↗
08/29/2026B00747399-P2Request digital key ↗
08/29/2026B00747399-P1Request digital key ↗
Showing 3 of 11 on file for this type
▸Applications & Permits15
▸BISPLAN / WORK APPROVAL APPLICATION11
01/09/2019321768832Open ↗
08/24/2018321807256Open ↗
07/23/2018321807256Open ↗
Showing 3 of 11 on file for this type
▸BISWORK PERMIT APPLICATION4
05/02/2018321747749Open ↗
04/27/2018321747749Open ↗
04/27/2018321747749Open ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWHouse Number Verification: TOPO Stamp3
08/13/2026B01092395-P2Open ↗
08/13/2026B01092395-P1Open ↗
08/13/2026B01092395-I1Open ↗
▸Seals & Professional Certifications63
▸DOB NOWProgress Inspector Seal & Signature20
09/23/2026B01092395-P2Open ↗
09/23/2026B01092395-P2Open ↗
09/23/2026B01092395-P2Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/29/2026B00747760-I1Open ↗
08/29/2026B00747399-P2Open ↗
08/29/2026B00747399-P1Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST8
04/27/2018321747749Open ↗
04/27/2018321747749Open ↗
04/27/2018321747749Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT8
04/27/2018321747749Open ↗
04/27/2018321747749Open ↗
04/27/2018321747749Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/23/2026B01092395-P2Open ↗
09/10/2026B01092395-P1Open ↗
09/01/2026B00747399-I1Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION6
11/23/2018321747749Open ↗
04/27/2018321747749Open ↗
04/27/2018321747749Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
04/21/2010320144492Open ↗
▸Trade Schedules & Equipment5
▸BISFA - FDNY APPROVAL : FD-FAA3
09/05/2019321807256Open ↗
08/12/2019321807256Open ↗
06/26/2019321807256Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
04/27/2018321747749Open ↗
04/26/2018321747749Open ↗
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist3
08/13/2026B01092395-P2Open ↗
08/13/2026B01092395-P1Open ↗
08/13/2026B01092395-I1Open ↗
▸Environmental & Asbestos15
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
08/29/2026B00747399-P2Open ↗
08/29/2026B00747399-P1Open ↗
08/29/2026B00747399-I1Open ↗
Showing 3 of 10 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
07/23/2018321807256Open ↗
06/05/2018321768832Open ↗
04/27/2018321747749Open ↗
Showing 3 of 4 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
04/21/2010320144492Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
04/27/2018321747749Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
11/23/2018321747749Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/29/2026B00747399-I1Open ↗
▸Approvals, Objections & Sign-offs8
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST6
09/05/2019321807256Open ↗
08/12/2019321807256Open ↗
03/13/2019321747749Open ↗
Showing 3 of 6 on file for this type
▸BISADMINISTRATIVE OBJECTIONS1
04/21/2010320144492Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
11/16/2010320144492Open ↗
▸Cost, Insurance & Ownership17
▸BISCOST AFFIDAVIT17
08/12/2019321807256Open ↗
11/23/2018321747749Open ↗
11/23/2018321747749Open ↗
Showing 3 of 17 on file for this type
▸Filing & Intake Forms14
▸BISEFILING COVER SHEET8
06/05/2018321768832Open ↗
04/27/2018321747749Open ↗
04/27/2018321747749Open ↗
Showing 3 of 8 on file for this type
▸BISBOROUGH INTAKE FORM6
09/05/2019321807256Open ↗
08/12/2019321807256Open ↗
03/13/2019321747749Open ↗
Showing 3 of 6 on file for this type
▸Other Documents3
▸DOB NOWProperty Ownership Certification3
08/13/2026B01092395-P2Open ↗
08/13/2026B01092395-P1Open ↗
08/13/2026B01092395-I1Open ↗