← Back
Public elementary, junior or senior high
The Longwood Academy of Discovery
900 REV JAMES POLITE AVE · BIN 2005348
💬 Discuss this project
1922Year Built
5Stories
W1Building Class
R7-1Zoning
95,000 sfGross Floor Area
1Units
LL97 Covered21 Open Violations 11 unresolved · 10 paperwork only ▸
Public elementary, junior or senior high · Owner of record: NYC DEPARTMENT OF EDUCATION · 69,000 sf lot · 1.38 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingCivilGeneralOther
Roof8p · 2 filings · 20 docs
Floor 45p · 1 filing · 19 docs
Floor 31p · 1 filing · 19 docs
Floor 22p · 2 filings · 20 docs
Floor 16p · 1 filing · 19 docs
Cellar8p · 2 filings · 20 docs
1 job · most recent 03/13/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
03/13/2026——Heating and Air Conditioning Systems
Heat / Cool
Lg KNUAB091A 9,000 BTU · Fan Coil Indoor ×1
KUSAB091A 9,000 BTU · Condensing Unit ×1
2 jobs · most recent 03/13/2026
Water/Sanitary Gas Storm
FiledStatusContractorScope
03/13/2026——Gas, Water/Sanitary
05/29/2025——Storm, Water/Sanitary
5 jobs · most recent 07/08/2025
General Wiring
FiledStatusContractorScope
07/08/2025Permit IssuedJ.H.I. ELECTRIC LLCGeneral Wiring
12/30/2022CompletePRINCE ELECTRIC CORP.—
02/18/2021CompleteURBAN ELECTRICAL CORPGeneral Wiring
09/06/2019Permit IssuedLASER ELEC'L CONTR'G INCGeneral Wiring
12/29/2017CompleteCHARAN ELEC'L ENTERP'S IN—
1 job · most recent 05/29/2025
FiledStatusContractorScope
05/29/2025——1 scope_items
Building Lifecycle
All (95)Filed (8)Permit Issued (1)Signed Off (1)Violation (60)Objection (16)Special Inspection (9)
07/21/2026
Violation issued (ECB, open)
Construction
07/21/2026
Violation issued (ECB, open)
Construction
07/21/2026
Violation issued (ECB, open)
Construction
04/01/2026
Objection resolved — Addressed
04/01/2026
Objection resolved — Addressed
04/01/2026
Objection resolved — Addressed
03/23/2026
Objection raised — Admin
03/23/2026
Objection raised — Admin
03/13/2026
Filed — Alteration
General construction to allow for mechanical and electrical work to be installed.
X01364344-S2
03/13/2026
Filed — Alteration
General construction to allow for mechanical and electrical work to be installed.
X01364344-S1
03/09/2026
Objection raised — Other
03/04/2026
Special inspection requirement — Final
03/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
03/04/2026
Special inspection requirement — Post-installed Anchors
03/04/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
03/04/2026
Special inspection requirement — Fire-Resistance Rated Construction
03/03/2026
Filed — Alteration
General construction to allow for mechanical and electrical work to be installed.
X01364344-I1
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/28/2025
Violation issued (ECB, open)
Construction
10/28/2025
Violation issued (ECB, closed)
Construction
08/28/2025
Violation issued (ECB, closed)
Construction
08/28/2025
Violation issued (ECB, closed)
Construction
08/28/2025
Violation issued (ECB, open)
Construction
06/24/2025
Objection resolved — Addressed
06/24/2025
Objection resolved — Addressed
06/18/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
06/16/2025
Objection resolved — Addressed
06/03/2025
Objection raised — Other
05/30/2025
Objection resolved — Addressed
05/29/2025
Filed — Alteration
PLUMBING WORK IN CONNECTION WITH CIVIL WORK RELATED TO REPAIR OF STORM DETENTION SYSTEM
X01209080-S4
05/27/2025
Special inspection requirement — Post-installed Anchors
04/22/2025
Objection raised — Other
04/22/2025
Objection raised — Other
04/21/2025
Objection raised — Other
04/17/2025
Filed — Alteration
PLUMBING WORK IN CONNECTION WITH CIVIL WORK RELATED TO REPAIR OF STORM DETENTION SYSTEM
X01209080-S2
04/14/2025
Filed — Alteration
PLUMBING WORK IN CONNECTION WITH CIVIL WORK RELATED TO REPAIR OF STORM DETENTION SYSTEM
X01209080-S1
04/11/2025
Filed — Alteration
PLUMBING WORK IN CONNECTION WITH CIVIL WORK RELATED TO REPAIR OF STORM DETENTION SYSTEM
X01209080-I1
04/10/2025
Special inspection requirement — Masonry
04/10/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
05/01/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/24/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/11/2023
Violation issued (ECB, closed)
Construction
07/11/2023
Violation issued (ECB, closed)
Construction
07/11/2023
Violation issued (ECB, open)
Construction
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/19/2023
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY CONSTRUCTION FENCE. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
X00575336-I1
07/11/2022
Violation issued (ECB, closed)
Construction
07/11/2022
Violation issued (ECB, open)
Construction
07/11/2022
Violation issued (ECB, closed)
Construction
05/02/2022
Permit issued — Construction Fence
X00575336-I1-FN
09/09/2021
Objection raised — Other
09/09/2021
Objection resolved — Addressed
08/24/2021
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY CONSTRUCTION FENCE. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
X00575336-I1
07/19/2021
Violation issued (ECB, open)
Construction
07/19/2021
Violation issued (ECB, closed)
Construction
06/05/2020
Violation issued (ECB, closed)
Construction
06/05/2020
Violation issued (ECB, open)
Construction
11/08/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 95 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC DEPARTMENT OF EDUCATION103/22/2026
DEPARTMENT OF EDUCATION1003/22/2026
DEPT OF EDUCATION,X060203/22/2026
D.O.E. P.S.333 0203/22/2026
DOE P.S.333103/22/2026
DOE P.S.33 THE MUSEUM SCH303/22/2026
DEPT. OF EDUCATION 0303/22/2026
DOE X 060 040203/22/2026
DEPARTMENT OF EDUCATION 0103/22/2026
THE GEORGE GALLEGO SCHOOL803/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
IAQ SYSTEMS INC203/13/2026
DI DOMENICO + PARTNERS LLP103/13/2026
MUESER RUTLEDGE CONSULTING ENGINEER205/29/2025
SHENOY ENGINEERING, PC104/14/2025
SEN ARCHITECTS LLP104/11/2025
NYGB108/24/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AK CONSULTING SERVICES203/21/2026
IAQ SYSTEMS203/21/2026
SEN ARCHITECTS403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ANNEX ENTERPRISE, INCGeneral Contractor303/21/2026
CEDOMIR MARAElectrical203/21/2026
DEREK MOHANElectrical103/21/2026
LUPINSKI, MAREKElectrical103/21/2026
SCHWERDTFEGER, MARCUSElectrical103/21/2026
FLORENTINE ARTISTIC IRONElectrical103/21/2026
CHAYUT, ALLENElectrical103/21/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FenceSigned-offANNEX ENTERPRISE, INC05/02/2022
BISOTISSUEDANNEX ENTERPRISE, INC05/02/2022
BISOTISSUEDABAX INC01/02/2015
BISOTISSUEDABAX INC01/02/2015
BISOTISSUEDABAX INC12/29/2014
BISOTISSUEDABAX INC12/29/2014
BISOTISSUEDABAX INC12/29/2014
BISPLISSUEDFORSYTHE P&H CORP11/17/2014
BISPLISSUEDFORSYTHE P&H CORP08/20/2014
BISPLISSUEDFORSYTHE P&H CORP08/20/2014
BISOTISSUEDABAX INC01/30/2014
BISOTISSUEDABAX INC01/30/2014
BISOTISSUEDABAX INC12/23/2013
BISEQISSUEDABAX INC12/23/2013
BISOTISSUEDABAX INC12/23/2013
BISEQISSUEDABAX INC12/23/2013
BISOTISSUEDABAX INC12/23/2013
BISOTISSUEDABAX INC12/23/2013
BISPLISSUEDFORSYTHE P&H CORP07/24/2013
BISPLISSUEDFORSYTHE P&H CORP05/28/2013
BISPLISSUEDFORSYTHE P&H CORP03/06/2013
BISOTISSUEDABAX INC01/02/2013
BISOTISSUEDABAX INC01/02/2013
BISOTISSUEDABAX INC01/02/2013
BISOTISSUEDABAX INC01/02/2013
BISEQISSUEDABAX INC12/28/2012
BISEQISSUEDABAX INC12/28/2012
BISOTISSUEDABAX INC12/28/2012
BISEQISSUEDABAX INC12/28/2012
BISMHISSUEDJ & A CONTRACTORS CORP10/22/2012
BISMHISSUEDJ & A CONTRACTORS CORP10/22/2012
BISOTISSUEDNEW YORK GREEN BUILDERS I08/20/2012
BISPLISSUEDFORSYTHE P&H CORP07/12/2012
BISOTISSUEDNEW YORK GREEN BUILDERS I03/27/2012
BISPLISSUEDFORSYTHE P&H CORP02/13/2012
BISOTISSUEDABAX INC02/13/2012
BISOTISSUEDABAX INC02/13/2012
BISMHISSUEDJ & A CONTRACTORS CORP02/13/2012
BISOTISSUEDABAX INC01/20/2012
BISOTISSUEDABAX INC01/20/2012
+ 11 more permits on file
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
03/04/2026Final—progress
03/04/2026Fire-Resistant Penetrations and Joints—special
03/04/2026Post-installed Anchors—special
03/04/2026Structural Stability – Alterations of existing buildings—special
03/04/2026Fire-Resistance Rated Construction—progress
06/18/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
05/27/2025Post-installed Anchors—special
04/10/2025Masonry—special
04/10/2025Structural Stability – Alterations of existing buildings—special
▾Documents — 68 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/19/2026X01209080-S1Request digital key ↗
08/19/2026X01209080-S4Request digital key ↗
08/19/2026X01209080-S2Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits2
▸BISWORK PERMIT APPLICATION1
09/13/2010220082568Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
09/13/2010220082568Open ↗
▸Seals & Professional Certifications14
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/25/2026X00575336-I1Open ↗
08/17/2026X01364344-S2Open ↗
08/17/2026X01364344-S1Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
11/17/2010220082568Open ↗
09/13/2010220082568Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
09/13/2010220082568Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
09/13/2010220082568Open ↗
▸Trade Schedules & Equipment2
▸BISSELF-CERT PLUMBING NOTICE1
10/20/2010220082568Open ↗
▸BISSCHEDULE B - PLUMBING1
09/13/2010220082568Open ↗
▸Safety & Tenant Protection1
▸DOB NOWNYCSCA - Approved Site Safety Plans1
08/13/2026X00575336-I1Open ↗
▸Environmental & Asbestos1
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
09/13/2010220082568Open ↗
▸Approvals, Objections & Sign-offs23
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)10
08/17/2026X01364344-I1Open ↗
08/17/2026X01364344-S2Open ↗
08/17/2026X01364344-S1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter8
08/17/2026X01364344-S2Open ↗
08/17/2026X01364344-S1Open ↗
08/13/2026X00575336-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)2
08/17/2026X01364344-S2Open ↗
08/13/2026X00575336-I1Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
11/17/2010220082568Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
11/17/2010220082568Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
09/13/2010220082568Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
11/17/2010220082568Open ↗
09/13/2010220082568Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
09/13/2010220082568Open ↗
▸Other Documents14
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal8
08/17/2026X01364344-S1Open ↗
08/17/2026X01364344-S2Open ↗
08/13/2026X00575336-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProof of Historic Building3
08/17/2026X01364344-I1Open ↗
08/13/2026X01209080-I1Open ↗
08/13/2026X01364344-I1Open ↗
▸DOB NOWNYCSCA Exhibit 22
08/13/2026X01209080-S4Open ↗
08/13/2026X00575336-I1Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF Property Tax Assessment Roll1
08/13/2026X01364344-S1Open ↗