← Back
Public elementary, junior or senior high
P.S. 289 George V. Brower
900 ST MARKS AVENUE · BIN 3031050
💬 Discuss this project
1958Year Built
3Stories
W1Building Class
R6Zoning
113,500 sfGross Floor Area
1Units
LL97 Covered16 Open Violations 12 unresolved · 4 paperwork only ▸FDNY Report ↗
Public elementary, junior or senior high · Owner of record: NYC DEPARTMENT OF EDUCATION · 96,210 sf lot · 1.18 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Roof30p · 2 filings · 20 docs
Bulkhead1p · 1 filing · 20 docs
Floor 38p · 3 filings · 20 docs
Floor 27p · 3 filings · 20 docs
Floor 19p · 4 filings · 20 docs
Cellar6p · 2 filings · 20 docs
Basement4p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC SCHOOL CONSTRUCTION AUTHORITY1809/13/2026
NYC DEPARTMENT OF EDUCATION103/22/2026
DEPARTMENT OF EDUCATION203/22/2026
DEPT OF EDUCATION P.S.289803/22/2026
DOE PS 289 040403/22/2026
D.O.E. P.S.289 0103/22/2026
DOE 040403/22/2026
P.S. 289 DOE103/22/2026
P.S 289 DEPARTMENT OF EDU403/22/2026
NEW YORK CITY DEPT OF ED203/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DSENY ENGINEERING SERVICES203/21/2026
SHENOY ENGINEERING, P.C.203/21/2026
ALBERT ARONOV ARCHITECT103/21/2026
NYC SCHOOL CONSTRUCTION AUTHORITY303/21/2026
RKTB103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JOSE TEJADAElectrical303/21/2026
CHARAN ELEC'L ENTERP'S INElectrical203/22/2026
JTE ELECTRICAL SERVICES 004720General Contractor203/22/2026
FAJARDO, JOSEElectrical103/21/2026
FRANCIS RICHARDSElectrical103/21/2026
ARAMIS ROSAElectrical103/21/2026
NIEVES WILLIAMElectrical103/21/2026
NUNEZ ELECTRIC INC.Electrical103/22/2026
THOMAS STONEElectrical103/21/2026
URBAN ELECTRICAL CORPElectrical103/22/2026
WILLIAM NIEVESElectrical103/21/2026
JTE ELECTRICAL SERVICESElectrical103/22/2026
A & S ELECTRIC INC.Electrical103/22/2026
CAPIZZO, VITOElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JPC LOGISTICS DBA JPCL EN351205/12/2023
FUTURE TECH CONSULTANTS O589106/10/2021
Building Lifecycle
All (123)Filed (17)Violation (60)Objection (16)Special Inspection (30)
05/14/2026
Objection raised — Other
05/11/2026
Special inspection requirement — Concrete - Precast
05/08/2026
Filed — Alteration
remove &replace existing exhaust fans on roof and provide new curbs, extensions as shown in the drawings. remove and replace split ac units in kind. No Change in use egress or occupancy.
B01113152-P2
05/04/2026
Special inspection requirement — Sprayed fire-resistant materials
04/30/2026
Special inspection requirement — Concrete - Cast-In-Place
04/29/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
04/23/2026
Objection resolved — Addressed
04/22/2026
Objection raised — Admin
04/20/2026
Filed — Alteration
Removal and replacement of mechanical equipment including chiller heater, split ac/heat pump systems, exhaust fans, rooftop units, and associated piping.
B01360763-S8
04/20/2026
Special inspection requirement — Post-installed Anchors
04/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
HAKEEM ALSHAWABKEH
04/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
04/08/2026
Violation issued (ECB, open)
Construction
04/08/2026
Violation issued (ECB, open)
Construction
04/08/2026
Violation issued (ECB, open)
Construction
04/08/2026
Violation issued (ECB, open)
Construction
04/06/2026
Special inspection requirement — Post-installed Anchors
04/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
04/01/2026
Special inspection requirement — Post-installed Anchors
04/01/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
03/18/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
03/18/2026
Special inspection requirement — Post-installed Anchors
03/11/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
03/06/2026
Objection raised — Other
02/24/2026
Filed — Alteration
Removal and replacement of mechanical equipment including chiller heater, split ac/heat pump systems, exhaust fans, rooftop units, and associated piping.
B01360763-S7
02/24/2026
Filed — Alteration
Removal and replacement of mechanical equipment including chiller heater, split ac/heat pump systems, exhaust fans, rooftop units, and associated piping.
B01360763-S6
02/23/2026
Filed — Alteration
Removal and replacement of mechanical equipment including chiller heater, split ac/heat pump systems, exhaust fans, rooftop units, and associated piping.
B01360763-S3
02/23/2026
Filed — Alteration
Removal and replacement of mechanical equipment including chiller heater, split ac/heat pump systems, exhaust fans, rooftop units, and associated piping.
B01360763-S5
02/23/2026
Filed — Alteration
Removal and replacement of mechanical equipment including chiller heater, split ac/heat pump systems, exhaust fans, rooftop units, and associated piping.
B01360763-I1
02/23/2026
Filed — Alteration
Removal and replacement of mechanical equipment including chiller heater, split ac/heat pump systems, exhaust fans, rooftop units, and associated piping.
B01360763-S4
02/23/2026
Special inspection requirement — Fire-Resistance Rated Construction
02/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
02/20/2026
Special inspection requirement — Post-installed Anchors
02/20/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
02/20/2026
Special inspection requirement — Heating Systems
HAKEEM ALSHAWABKEH
02/20/2026
Special inspection requirement — Post-installed Anchors
HAKEEM ALSHAWABKEH
02/20/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
02/20/2026
Special inspection requirement — Concrete - Cast-In-Place
02/20/2026
Special inspection requirement — Post-installed Anchors
02/20/2026
Special inspection requirement — Structural Steel - Details
02/20/2026
Special inspection requirement — Structural Steel - High Strength Bolting
02/20/2026
Special inspection requirement — Structural Steel - Welding
02/20/2026
Special inspection requirement — Masonry
02/17/2026
Special inspection requirement — Standpipe Systems
02/17/2026
Special inspection requirement — Final
02/17/2026
Special inspection requirement — Sprinkler Systems
02/11/2026
Filed — Alteration
B01357936-S1
02/10/2026
Filed — Alteration
B01357936-I1
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/29/2025
Violation issued (FDNY_ORDER, closed)
04/01/2025
Objection resolved — Addressed
03/23/2025
Objection resolved — Addressed
03/23/2025
Objection resolved — Addressed
02/12/2025
Objection raised — Other
02/12/2025
Objection raised — Other
02/12/2025
Objection raised — Other
02/04/2025
Filed — Alteration
remove &replace existing exhaust fans on roof and provide new curbs, extensions as shown in the drawings. remove and replace split ac units in kind. No Change in use egress or occupancy.
B01113152-S1
02/04/2025
Filed — Alteration
remove &replace existing exhaust fans on roof and provide new curbs, extensions as shown in the drawings. remove and replace split ac units in kind. No Change in use egress or occupancy.
B01113152-I1
02/04/2025
Filed — Alteration
remove &replace existing exhaust fans on roof and provide new curbs, extensions as shown in the drawings. remove and replace split ac units in kind. No Change in use egress or occupancy.
B01113152-S2
Latest 60 of 123 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BISOTISSUEDWHERE TO GET IT SERVICES,08/18/2022
BISOTISSUEDWHERE TO GET IT SERVICES,07/28/2021
BISOTISSUEDK.A.B. ELECTRIC CORP09/16/2015
BISEQISSUEDCREAMER ENVIRONMENTAL INC06/17/2014
BISOTISSUEDCREAMER ENVIRONMENTAL INC06/17/2014
BISOTISSUEDISM ELECTRIC INC10/22/2012
BISOTISSUEDBILTMORE GENERAL CONTRACTORS08/08/2011
BISOTISSUEDBILTMORE GENERAL CONTRACTORS08/08/2011
BISMHISSUEDCENTENNIAL ELEVATOR INDUS06/08/2011
BISPLISSUEDROBERT PARCHMENT P&H.INC04/25/2011
BISEQISSUEDBILTMORE GENERAL CONTRACTORS03/22/2011
BISEQISSUEDSCAFFOLDING ONE, INC01/06/2011
BISEQISSUEDSCAFFOLDING ONE, INC01/06/2011
BISOTISSUEDBILTMORE GENERAL CONTRACTORS08/16/2010
BISEQISSUEDSCAFFOLDING ONE, INC08/16/2010
BISEQISSUEDSCAFFOLDING ONE, INC08/11/2010
BISEQISSUEDBILTMORE GENERAL CONTRACTORS08/05/2010
BISMHISSUEDCENTENNIAL ELEVATOR INDUS01/29/2010
BISPLISSUEDROBERT PARCHMENT P&H.INC07/21/2009
BISOTISSUEDCENTENNIAL ELEVATOR IND INC08/25/2008
BISPLISSUEDFRANCO BELLI PLUMBING & HEATING05/18/2005
BISOTISSUEDTRINTEK INCORPORATED04/27/2005
BISEQISSUEDDORIEL SCAFFOLDING INCORPORATED01/02/2002
BISOTISSUEDCEMA CONSTRUCTION CORPORATION12/05/2001
BISOTISSUEDCEMA CONSTRUCTION CORPORATION12/05/2001
BISOTISSUEDSUPERIOR QUALITY CRAFTMEN INC08/14/2001
BISPLISSUEDROBERT PARCHMENT P&H.INC08/14/2001
BIS—ISSUEDSUPERIOR QUALITY CRAFTMEN INC08/09/2001
BISEQISSUEDSUPERIOR QUALITY CRAFTMEN INC07/17/2001
BISEQISSUEDDORIEL SCAFFOLDING INCORPORATED01/02/2001
BISOTISSUEDCEMA CONSTRUCTION CORPORATION10/12/2000
BISPLISSUEDFRANCO BELLI PLUMBING & HTG &SON10/12/2000
BISEQISSUEDDORIEL SCAFFOLDING INCORPORATED08/29/2000
2 projects · most recent 05/08/2026
Air Conditioning Systems Ventilation Systems Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
05/08/2026——Air Conditioning Systems, Ventilation Systems
Cooling
Mitsubishi Electric PKA-AK36NL 33,400 BTU · Vrf Indoor ×2
PUY-AK36NL 33,400 BTU · Heat Pump Outdoor ×2
Ventilation
Greenheck CUE-080-D 220 CFM · Exhaust Fan ×1
CUE-140-VG 2,200 CFM · Exhaust Fan ×1
04/20/2026——Heating and Air Conditioning Systems
Heat / Cool
Lg ZRUM168BTE6 168,000 BTU · Vrf Outdoor ×6
Mitsubishi Electric PUY-AK18NL 30,000 BTU · Heat Pump Outdoor ×5
PKA-AL18NL 30,000 BTU · Heat Pump Outdoor ×5
PKA-AK24NL 775 CFM · Heat Pump Outdoor ×1
PUY-AH24NL 24,000 BTU · Heat Pump Outdoor ×1
Annexair ERU-E-02-EW-HE-DX-HR-HR-AZP 2,400 CFM · Rooftop Unit ×10
ERU-E-03-EW-HE-DX-HR-HR-AZP 3,200 CFM · Rooftop Unit ×4
AHU-E-07-HE-DX-HR-HE-AZP 8,300 CFM · Rooftop Unit ×1
ERP-I-05-EW03-HE-DX-HR-TB 4,600 CFM · Fan Coil Indoor ×1
ERP-I-07-EW02-HE-DX-HR-TB 8,200 CFM · Fan Coil Indoor ×1
Samsung AM032FEQDCG/AA 706 CFM · Vrf Indoor ×2
AM060FCMDCG/AA 60,000 BTU · Vrf Outdoor ×1
Ventilation
Greenheck G-097-VG 100 CFM · Exhaust Fan ×4
G-080-VG 250 CFM · Exhaust Fan ×3
CUBE-160 2,400 CFM · Exhaust Fan ×2
G-130-VG 2,100 CFM · Exhaust Fan ×2
CSP-A200 100 CFM · Exhaust Fan ×1
G-080-D 200 CFM · Exhaust Fan ×1
G-090-D 450 CFM · Exhaust Fan ×1
G-090-VG 375 CFM · Exhaust Fan ×1
G-120-VG 900 CFM · Exhaust Fan ×1
G-140-VG 1,200 CFM · Exhaust Fan ×1
GB-130 1,875 CFM · Exhaust Fan ×1
Refrigeration
Jetson ACCM-030 331,300 BTU · Chiller ×1
2 projects · most recent 05/08/2026
Storm Water/Sanitary
FiledStatusContractorScope
05/08/2026——Storm
05/12/2023——Water/Sanitary
19 projects · most recent 06/26/2025
General Wiring
FiledStatusContractorScope
06/26/2025CompleteEVEREST ELECTRIC CORP—
06/25/2025CompleteEVEREST ELECTRIC CORP—
07/31/2023CompleteCHARAN ELEC'L ENTERP'S IN—
07/31/2023Permit IssuedCHARAN ELEC'L ENTERP'S INGeneral Wiring
07/08/2023CompleteJTE ELECTRICAL SERVICESGeneral Wiring
12/20/2022CompleteABM ELECTRIC, INCGeneral Wiring
10/26/2022CompleteCHARAN ELEC'L ENTERP'S IN—
08/12/2022Permit IssuedCHARAN ELEC'L ENTERP'S INGeneral Wiring
06/07/2022CompleteURBAN ELECTRICAL CORPGeneral Wiring
05/20/2022CompleteE-J ELEC. INSTALLATION COGeneral Wiring
06/09/2021Permit IssuedNUNEZ ELECTRIC INC.General Wiring
03/03/2021Permit IssuedA & S ELECTRIC INC.General Wiring
12/07/2020CompleteA.T.J. ELECTRICAL CO.INC.General Wiring
03/11/2020Permit IssuedCHARAN ELEC'L ENTERP'S INGeneral Wiring
12/11/2019CompleteCHARAN ELEC'L ENTERP'S IN—
2 projects · most recent 05/08/2026
Masonry Steel Concrete
FiledStatusContractorScope
05/08/2026——Masonry
04/20/2026——Steel, Concrete
▾Special Inspection Requirements (DOB NOW) — 43
DateRequirementInspectorRole
05/11/2026Concrete - Precast—special
05/04/2026Sprayed fire-resistant materials—special
04/30/2026Concrete - Cast-In-Place—special
04/29/2026Alternative Materials - OTCR Buildings Bulletin Number—special
04/20/2026Post-installed Anchors—special
04/20/2026Fire-Resistant Penetrations and JointsHAKEEM ALSHAWABKEHspecial
04/20/2026Fire-Resistant Penetrations and Joints—special
04/06/2026Post-installed Anchors—special
04/06/2026Fire-Resistant Penetrations and Joints—special
04/01/2026Post-installed Anchors—special
04/01/2026Fire-Resistant Penetrations and Joints—special
03/18/2026Fire-Resistant Penetrations and Joints—special
03/18/2026Post-installed Anchors—special
03/11/2026Structural Stability – Alterations of existing buildings—special
02/23/2026Fire-Resistance Rated Construction—progress
02/20/2026Fire-Resistant Penetrations and Joints—special
02/20/2026Post-installed Anchors—special
02/20/2026Structural Stability – Alterations of existing buildings—special
02/20/2026Heating SystemsHAKEEM ALSHAWABKEHspecial
02/20/2026Post-installed AnchorsHAKEEM ALSHAWABKEHspecial
02/20/2026Structural Stability – Alterations of existing buildings—special
02/20/2026Concrete - Cast-In-Place—special
02/20/2026Post-installed Anchors—special
02/20/2026Structural Steel - Details—special
02/20/2026Structural Steel - High Strength Bolting—special
Latest 25 of 43.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
P.s.k289Education—
Project B08019210 Alteration · Approved · 10/25/2022
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 105 on file (BIS + DOB NOW)
▸Plans & Drawings18
▸DOB NOWPlans/Sketch18
09/01/2026B00535903-I1Request digital key ↗
08/28/2026B08019210-S2Request digital key ↗
08/18/2026B01357936-S1Request digital key ↗
Showing 3 of 18 on file for this type
▸Seals & Professional Certifications21
▸DOB NOWDPL-1: Design Professional Seal & Signature18
09/01/2026B00535903-I1Open ↗
08/28/2026B08019210-S1Open ↗
08/28/2026B08019210-I1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/26/2026B01360763-S3Open ↗
09/26/2026B01360763-S3Open ↗
09/26/2026B01360763-S3Open ↗
▸Approvals, Objections & Sign-offs37
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter18
09/01/2026B00535903-I1Open ↗
08/17/2026B01360763-S8Open ↗
08/17/2026B01113152-P1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)18
08/17/2026B01360763-S8Open ↗
08/17/2026B01113152-P1Open ↗
08/15/2026B01113152-P2Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)1
08/13/2026B01357936-S1Open ↗
▸Other Documents29
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal24
08/17/2026B01360763-I1Open ↗
08/17/2026B01360763-S3Open ↗
08/17/2026B01360763-S4Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWProof of Historic Building4
08/17/2026B01113152-P1Open ↗
08/13/2026B01360763-I1Open ↗
08/13/2026B01357936-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00535903-I1Open ↗