← Back
BuildNYC
Elevator cooperative
Cabrini Terrace
900 WEST 190TH STREET · BIN 1064372
💬 Discuss this project
1954Year Built
15Stories
D4Building Class
R7-2Zoning
233,536 sfGross Floor Area
219Units
LL97 CoveredRent Stabilized13 Active Violations 1 likely answered ▸FISP: SAFE
Elevator cooperative · Owner of record: Cabrini Terr Ownrs · 46,000 sf lot · 5.08 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 15Unit 16F, Unit PHE2p · 1 filing · 5 docs
Floor 14
Floor 13
Floor 12Unit 12A, Unit 12S2p · 1 filing · 6 docs
Floor 11
Floor 10
Floor 9Unit 9G6p · 3 filings · 15 docs
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4Apartment 4o renovation and finishes2p · 1 filing · 4 docs
Floor 3
Floor 2
Floor 1Cabrini Terrace lobby enhancement1 filing · 6 docs
Sub-BasementSolstice Residential Group10p · 3 filings · 14 docs
Site & exteriorCogeneration system and plumbing installation22p · 6 filings · 20 docs
Filed — no permit issuedRooftop bulkhead installation4p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Cabrini Terrance Owners12903/22/2026
Solstice Residential Group303/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Green Studio203/21/2026
Robert Papazian Architect403/21/2026
East Coast Expediting203/21/2026
Clarke Construction Consultants303/21/2026
Domani Consulting203/21/2026
Edward F Zevallos Architect203/21/2026
A1 Expediting Service203/21/2026
CCBS Consultants403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
WaxtelGeneral Contractor807/08/2026
AM&G Waterproofingspecialty_contractor307/08/2026
Skyline Restorationspecialty_contractor307/08/2026
Design Procure BuildersGeneral Contractor203/21/2026
Spring ScaffoldingScaffold207/08/2026
Cape PlumbingPlumbing207/08/2026
Titan Electrical & Elev ContractingElectrical203/21/2026
Associated Electric Cont of NElectrical203/21/2026
Norway ElectricElectrical103/21/2026
Urbano's ElectricalElectrical103/22/2026
Aegis Energy ServicesGeneral Contractor107/08/2026
J. Costa ConstructionGeneral Contractor107/08/2026
AM&G WaterproofingScaffold107/08/2026
Big Apple Fire Sprinkler Co IFire Protection107/08/2026
C.Q. Electr'l ContractingElectrical103/21/2026
Cosme Plumbing & HeatingPlumbing103/22/2026
Twins ElectricElectrical103/21/2026
Borowide Elect'l ContractorsElectrical103/21/2026
Elpo Electrical ContgElectrical103/21/2026
Lights by Jay ElectricalElectrical103/21/2026
Spice Electric CompanyElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Robert Papazian Architect3491110/09/2025
Hansen Engineering8174312/29/2022
Rojas AP5772112/22/2022
Fsi Architecture354209/21/2022
Special Testing & Consulting1688108/13/2021
Levin Engineering1267106/16/2020
Building Lifecycle
All (184)Filed (21)Permit Issued (18)Signed Off (12)Facade (FISP) (17)Violation (60)Inspection (1)Objection (27)Special Inspection (28)
08/25/2026
Filed — Alteration
IRA to assist with Condition Assessment
M01451272-I1
03/20/2026
Signed off — Alteration
Removal and installation of non-load bearing partitions in Apt 16F. Remove and replace fixtures and finishes at kitchen.
M01237659-I1
10/27/2025
Permit issued — General Construction
M01237659-I1-GC
10/09/2025
Filed — Alteration
Removal and installation of non-load bearing partitions in Apt 16F. Remove and replace fixtures and finishes at kitchen.
M01237659-I1
10/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Papazian
06/06/2025
Special inspection requirement — Final
Robert Papazian
06/04/2025
Violation issued (HPD, closed)
A
03/17/2025
Violation issued (ECB, closed)
Construction
01/06/2025
Signed off — Alteration
INSTALL OF COGENERATION SYSTEM. INSTALLATION OF (1) NEW GAS FIRED GENERATOR & PLUMBING INSTALLATIONS FOR DOMESTIC HW CONNECTIONS. NO CHANGE IN USE EGRESS OR OCCUPANCY.
M00727190-I1
11/22/2024
Violation issued (HPD, closed)
I
11/18/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/11/2024
Permit issued — Plumbing
M00727190-I1-PL
08/06/2024
Signed off — Alteration
MATERIAL HOIST
M01052568-I1
05/30/2024
Permit issued — Suspended Scaffold
M01052568-I1-SC
05/22/2024
Signed off — Alteration
Remove and install non load bearing partitions, renovate kitchen in Apt 4O. Remove and replace fixtures and finishes.
M00983257-I1
05/16/2024
Filed — Alteration
MATERIAL HOIST
M01052568-I1
02/07/2024
Cycle 9 facade report submitted
02/07/2024
Cycle 9 facade report signed — SAFE
01/25/2024
Permit issued — General Construction
M00983257-I1-GC
01/17/2024
Objection resolved — Resolved
01/17/2024
Special inspection requirement — Shutoff dampers
CHINMAY PATEL
01/17/2024
Special inspection requirement — HVAC-R and service water heating equipment
CHINMAY PATEL
01/17/2024
Special inspection requirement — HVAC-R and service water heating system controls
CHINMAY PATEL
01/17/2024
Special inspection requirement — Maintenance information
CHINMAY PATEL
01/17/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
CHINMAY PATEL
01/16/2024
Objection raised — Zoning
01/16/2024
Objection raised — Energy
01/16/2024
Objection resolved — Resolved
01/12/2024
Filed — Alteration
PLUMBING FIXTURES FILED IN CONJUNCTION WITH DOB NOW GC AND MH. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M00958054-S2
01/12/2024
Objection raised — Inspections
01/11/2024
Filed — Alteration
PLUMBING FIXTURES FILED IN CONJUNCTION WITH DOB NOW GC AND MH. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M00958054-S1
01/09/2024
Objection resolved — Addressed
01/08/2024
Objection raised — Scope
01/08/2024
Objection resolved — Addressed
01/05/2024
Objection raised — Fire_Protection
01/04/2024
Filed — Alteration
Remove and install non load bearing partitions, renovate kitchen in Apt 4O. Remove and replace fixtures and finishes.
M00983257-I1
01/04/2024
Filed — Alteration
PLUMBING FIXTURES FILED IN CONJUNCTION WITH DOB NOW GC AND MH. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M00958054-I1
12/29/2023
Special inspection requirement — Final
12/29/2023
Special inspection requirement — Mechanical Systems
12/29/2023
Special inspection requirement — Tenant Protection Plan Compliance
12/28/2023
Special inspection requirement — Final
Robert Papazian
12/20/2023
Cycle 9 facade inspection completed
12/14/2023
Signed off — Alteration
Limited faade restoration as per plans filed herewith. No change in occupancy, use or egress.
M00765874-I1
12/12/2023
Signed off — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AND OVERHEAD PROTECTION AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE NYC CODE 2014, NO CHANGES IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M08036539-I1
12/12/2023
Signed off — Alteration
INSTALLATION OF FENCE AS PER DRAWINGS. FENCE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00598713-I1
11/17/2023
Permit issued — Sidewalk Shed
M08036539-I1-SH
11/15/2023
Violation issued (HPD, closed)
I
06/06/2023
Signed off — Alteration
INTERIOR RENOVATION OF UNIT 9O. SCOPE OF WORK INCLUDES INSTALLATION OF NEW APPLIANCES, REPLACEMENT OF FIXTURES, NEW FINISHES, REFURBISH EXISTING WOOD FLOOR AND NEW LIGHTING. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M08026626-I1
05/22/2023
Cycle 9 facade report submitted
04/27/2023
Cycle 9 facade inspection completed
03/16/2023
Violation issued (HPD, closed)
A
02/17/2023
Permit issued — General Construction
M00765874-I1-GC
02/11/2023
Permit issued — General Construction
M08026626-I1-GC
01/10/2023
Permit issued — Plumbing
M00727190-I1-PL
01/10/2023
Objection raised — Scope
01/10/2023
Objection resolved — Addressed
01/06/2023
Signed off — Alteration
INSTALL TEMPORARY ADA RAMP AT EXTERIOR OF BUILDING. NO CHANGE OF USE, EGRESS OR OCCUPANCY IS INVOLVED.
M00758530-I1
12/29/2022
Filed — Alteration
INSTALL OF COGENERATION SYSTEM. INSTALLATION OF (1) NEW GAS FIRED GENERATOR & PLUMBING INSTALLATIONS FOR DOMESTIC HW CONNECTIONS. NO CHANGE IN USE EGRESS OR OCCUPANCY.
M00727190-P1
12/22/2022
Filed — Alteration
INTERIOR RENOVATION OF UNIT 9O. SCOPE OF WORK INCLUDES INSTALLATION OF NEW APPLIANCES, REPLACEMENT OF FIXTURES, NEW FINISHES, REFURBISH EXISTING WOOD FLOOR AND NEW LIGHTING. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M08026626-I1
12/22/2022
Permit issued — General Construction
M00765874-I1-GC
Latest 60 of 184 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offWaxtel10/27/2025
DOB NOWPlumbingSigned-offCape Plumbing10/11/2024
DOB NOWSuspended ScaffoldSigned-offRosenwach Tank Co05/30/2024
DOB NOWGeneral ConstructionSigned-offWaxtel01/25/2024
DOB NOWSidewalk ShedSigned-offSpring Scaffolding11/17/2023
DOB NOWGeneral ConstructionSigned-offSkyline Restoration02/17/2023
DOB NOWGeneral ConstructionSigned-offJ Costa Construction02/11/2023
DOB NOWPlumbingSigned-offCape Plumbing01/10/2023
DOB NOWGeneral ConstructionSigned-offSkyline Restoration12/22/2022
DOB NOWSidewalk ShedSigned-offSpring Scaffolding11/18/2022
DOB NOWFoundationSigned-offAM&G Waterproofing08/22/2022
DOB NOWGeneral ConstructionSigned-offWaxtel08/04/2022
DOB NOWGeneral ConstructionSigned-offDesign Procure Build07/26/2022
DOB NOWMechanical SystemsPermit IssuedSkanska Walsh05/14/2022
DOB NOWConstruction FenceSigned-offAM&G Waterproofing10/04/2021
DOB NOWGeneral ConstructionSigned-offAM&G Waterproofing09/20/2021
DOB NOWGeneral ConstructionSigned-offWaxtel09/20/2021
DOB NOWSprinklersSigned-offBig Apple Fire Sprinkler Co I06/26/2020
BISFSISSUEDDual Fuel Plumbing & Heating01/30/2025
BISPLISSUEDDual Fuel Plumbing & Heating12/22/2022
BISOTISSUEDBroadway Kitchens & Baths10/28/2022
BISOTISSUEDBroadway Kitchens & Baths09/29/2022
BISFSISSUEDAmerican Boiler & Welding10/22/2021
BISPLISSUEDDual Fuel Plumbing & Heating10/22/2021
BISOTRE-ISSUEDAM&G Waterproofing04/20/2021
BISOTISSUEDL.e.c.inc03/02/2021
BISOTRE-ISSUEDAM&G Waterproofing12/10/2020
BISPLISSUEDDual Fuel Plumbing & Heating08/31/2020
BISOTISSUEDFast Track Electric11/27/2019
BISOTISSUEDDual Fuel Company07/10/2019
BISFSISSUEDAmerican Boiler & Welding05/29/2019
BISOTISSUEDDual Fuel Company01/18/2019
BISPLISSUEDDual Fuel Plumbing & Heating01/18/2019
BISOTISSUEDMBQ Contracting09/24/2018
BISPLISSUEDZFM09/20/2018
BISOTISSUEDMBQ Contracting08/20/2018
BISPLISSUEDAqua Plumbing & Heating02/13/2018
BISOTISSUEDEbro Dique Group05/17/2017
BISOTISSUEDComplete Restoration05/04/2017
BISOTISSUEDBCN Resources02/23/2017
+ 28 more permits on file
1 project · most recent 01/12/2024
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
01/12/2024——Air Conditioning Systems
Cooling
Carrier 24SCA518W8003 18,000 BTU · Condensing Unit ×4
24SCA530W8003 30,000 BTU · Condensing Unit ×4
24SCA548W8003 52,000 BTU · Condensing Unit ×4
59SC5B026E14-10 18,000 BTU · Fan Coil Indoor ×4
59SC5B060E14-12 30,000 BTU · Fan Coil Indoor ×4
59SC5B100E21--22 48,000 BTU · Fan Coil Indoor ×4
2 projects · most recent 01/12/2024
Water/Sanitary
FiledStatusContractorScope
01/12/2024——Water/Sanitary
07/26/2021——Water/Sanitary
13 projects · most recent 10/20/2026
General Wiring
FiledStatusContractorScope
10/20/2026CompleteExpert Electric Cont NY I—
06/30/2026CompleteSafetech Electrical Contng—
04/09/2025CompleteElpo Electrical ContgGeneral Wiring
05/10/2024CompleteJoseph Weinstein ElectricGeneral Wiring
03/09/2023CompleteSure Electrical ContractingGeneral Wiring
01/24/2023CompleteLippolis ElectricGeneral Wiring
01/11/2023CompleteElpo Electrical ContgGeneral Wiring
01/06/2023Permit IssuedJte Electrical Services—
11/16/2022Permit IssuedTop Shelf Electric—
09/10/2021CompleteJoseph Weinstein ElectricGeneral Wiring
08/18/2020CompleteJam Electrical—
12/11/2019CompleteLeone Electric CoGeneral Wiring
07/02/2018CompleteUrbano's ElectricalGeneral Wiring
1 project · most recent 08/25/2026
FiledStatusContractorScope
08/25/2026———
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
11/18/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
10/08/2025Fire-Resistant Penetrations and JointsRobert Papazianspecial
06/06/2025FinalRobert Papazianprogress
01/17/2024Shutoff dampersCHINMAY PATELenergy_progress
01/17/2024HVAC-R and service water heating equipmentCHINMAY PATELenergy_progress
01/17/2024HVAC-R and service water heating system controlsCHINMAY PATELenergy_progress
01/17/2024Maintenance informationCHINMAY PATELenergy_progress
01/17/2024HVAC-R and service water piping design and insulationCHINMAY PATELenergy_progress
12/29/2023Final—progress
12/29/2023Mechanical Systems—special
12/29/2023Tenant Protection Plan Compliance—special
12/28/2023FinalRobert Papazianprogress
12/22/2022Lighting in dwelling unitsDeborah Rojas De Leonenergy_progress
12/22/2022Energy Code Compliance InspectionsDeborah Rojas De Leonprogress
12/22/2022Fire-Resistant Penetrations and JointsDeborah Rojas De Leonspecial
11/22/2022Fire-Resistant Penetrations and JointsRyan Hansenspecial
10/24/2022FinalDeborah Rojas De Leonprogress
09/27/2022FinalJames Cicaloprogress
09/27/2022MasonryJames Cicalospecial
09/27/2022Structural Stability – Alterations of existing buildingsJames Cicalospecial
06/15/2022FinalJAMES SHAUGHNESSYprogress
05/04/2022FinalDENISE REOprogress
05/04/2022Lighting in dwelling unitsDENISE REOenergy_progress
07/30/2021FinalRenee Beckprogress
07/30/2021Footing and FoundationRenee Beckprogress
07/30/2021Subsurface Conditions – Fill Placement & In-Place DensitySEBASTIAN SETTEDUCATE JR., P.Especial
Latest 25 of 28.
▾Documents — 615 on file (BIS + DOB NOW)
▸Plans & Drawings21
▸DOB NOWPlans/Sketch20
09/03/2026M00554731-I1Request digital key ↗
09/03/2026M00554734-I1Request digital key ↗
09/03/2026M00567872-I1Request digital key ↗
Showing 3 of 20 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler1
08/15/2026M00348948-I1Request digital key ↗
▸Applications & Permits116
▸BISWORK PERMIT APPLICATION65
01/31/2025140827586Open ↗
10/31/2022123842486Open ↗
09/29/2022123842486Open ↗
Showing 3 of 65 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION49
01/31/2023140827586Open ↗
01/26/2023140827586Open ↗
09/30/2022140827586Open ↗
Showing 3 of 49 on file for this type
▸BISLL114/19 PERMIT RESTRICTION1
11/28/2020140973819Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
09/29/2022123842486Open ↗
▸Seals & Professional Certifications142
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION70
02/21/2020123842486Open ↗
11/26/2019123698784Open ↗
11/06/2019123698784Open ↗
Showing 3 of 70 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature19
09/03/2026M00554731-I1Open ↗
09/03/2026M00554734-I1Open ↗
09/03/2026M00567872-I1Open ↗
Showing 3 of 19 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST14
08/20/2018123126349Open ↗
08/17/2018123126349Open ↗
11/02/2016122925503Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWProgress Inspector Seal & Signature11
09/06/2026M08026626-I1Open ↗
09/06/2026M08026626-I1Open ↗
09/06/2026M08026626-I1Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT8
01/17/2019140827586Open ↗
08/17/2018123126349Open ↗
11/02/2016122925503Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/06/2026M08026626-I1Open ↗
09/01/2026M00348948-I1Open ↗
08/30/2026M01237659-I1Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
11/13/2020140973819Open ↗
01/17/2019140827586Open ↗
Showing 2 of 3 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
01/17/2019140827586Open ↗
Showing 1 of 2 on file for this type
▸BISPC FULL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
11/13/2020140973819Open ↗
▸Trade Schedules & Equipment48
▸BISSELF-CERT PLUMBING NOTICE19
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 19 on file for this type
▸BISSCHEDULE B - PLUMBING16
01/26/2023140827586Open ↗
01/17/2019140827586Open ↗
Showing 2 of 16 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE8
09/30/2022140827586Open ↗
08/17/2018123126349Open ↗
04/10/2017123070452Open ↗
Showing 3 of 8 on file for this type
▸BISEQUIPMENT USE PERMITS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
01/17/2019140827586Open ↗
▸BISEQUIPMENT USE APPLICATION-PERMIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPLUMBING (PL) SIGNOFF1
03/13/2025140827586Open ↗
▸Safety & Tenant Protection10
▸BISTenant Protection Plan and Notes8
02/21/2020123842486Open ↗
11/06/2019123698784Open ↗
08/17/2018123126349Open ↗
Showing 3 of 8 on file for this type
▸BISTPP1: TENANT PROTECTION PLAN1
05/16/2022123842486Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026M00348948-I1Open ↗
▸Environmental & Asbestos42
▸BISASBESTOS: CERTIFICATION (DEP ACP5)14
02/21/2020123842486Open ↗
11/06/2019123698784Open ↗
01/17/2019140827586Open ↗
Showing 3 of 14 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
09/03/2026M00554731-I1Open ↗
09/03/2026M00554734-I1Open ↗
09/02/2026M00722803-I1Open ↗
Showing 3 of 12 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance46
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS24
02/21/2020123842486Open ↗
11/27/2019123698784Open ↗
11/26/2019123698784Open ↗
Showing 3 of 24 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS11
03/13/2025140827586Open ↗
02/28/2025140827586Open ↗
05/28/2021123698784Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY6
03/07/2025140827586Open ↗
03/03/2025140827586Open ↗
02/28/2025140827586Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
01/17/2019140827586Open ↗
Showing 1 of 2 on file for this type
▸BISTR8: Energy Code Progress Inspections1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
03/03/2025140827586Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026M00730960-I1Open ↗
▸Inspections & Test Reports15
▸BISTECHNICAL REPORT: RESPONSIBILITY12
03/13/2025140827586Open ↗
03/07/2025140827586Open ↗
03/03/2025140827586Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
09/29/2022123842486Open ↗
▸Approvals, Objections & Sign-offs51
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST27
03/13/2025140827586Open ↗
06/11/2021140973819Open ↗
05/28/2021123698784Open ↗
Showing 3 of 27 on file for this type
▸BISADMINISTRATIVE OBJECTIONS13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION6
06/15/2017121738619Open ↗
Showing 1 of 6 on file for this type
▸BISSUPERSEDING LETTER2
01/31/2025140827586Open ↗
03/03/2021123698784Open ↗
▸BISCONSTRUCTION CODE DETERMINATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFUEL STORAGE (FS) SIGNOFF1
03/13/2025140827586Open ↗
▸BISSHED LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership62
▸BISCOST AFFIDAVIT56
04/06/2022123842486Open ↗
06/11/2021140973819Open ↗
05/28/2021123698784Open ↗
Showing 3 of 56 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISCIVIL PENALTY AFFADAVIT/REQUEST1
07/20/2020140827586Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCIVIL PENALTY AFFIDAVIT/REQUEST1
04/20/2021140973819Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
03/07/2025140827586Open ↗
▸Filing & Intake Forms52
▸BISEFILING COVER SHEET20
02/21/2020123842486Open ↗
11/06/2019123698784Open ↗
08/17/2018123126349Open ↗
Showing 3 of 20 on file for this type
▸BISBOROUGH INTAKE FORM14
01/31/2025140827586Open ↗
10/25/2021140827586Open ↗
10/25/2021140827586Open ↗
Showing 3 of 14 on file for this type
▸BISADDITIONAL INFORMATION13
01/31/2023140827586Open ↗
04/06/2022123842486Open ↗
03/18/2022123842486Open ↗
Showing 3 of 13 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET5
11/13/2020140973819Open ↗
01/17/2019140827586Open ↗
Showing 2 of 5 on file for this type
▸Other Documents10
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION6
10/25/2021140827586Open ↗
10/25/2021140827586Open ↗
10/25/2021140827586Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWManufacturer's Specifications1
08/13/2026M01052568-I1Open ↗
▸DOB NOWIRA Certification1
08/26/2026M01451272-I1Open ↗
▸DOB NOWDHCR Document1
08/13/2026M00554731-I1Open ↗
▸DOB NOWCalculations1
08/13/2026M01052568-I1Open ↗