← Back
BROOKLYN
901 60 STREET
BROOKLYN · BIN 3140935
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
0 Open ViolationsFDNY Report ↗
Flood zone X
Locations of Work
StructuralMechanicalFire ProtectionEquipment
Roof11p · 2 filings · 20 docs
Bulkhead1p · 1 filing · 11 docs
Floor 610p · 2 filings · 20 docs
Floor 510p · 1 filing · 15 docs
Floor 410p · 2 filings · 20 docs
Floor 39p · 2 filings · 20 docs
Floor 212p · 2 filings · 20 docs
Floor 112p · 4 filings · 20 docs
Cellar8p · 1 filing · 15 docs
3 jobs · most recent 11/18/2022
General Wiring
FiledStatusContractorScope
11/18/2022CompleteRIGHTWAY ELECTRICAL INCGeneral Wiring
03/25/2022CompleteKJK ELECTRIC INC—
03/29/2021CompleteTOP SHELF ELECTRIC CORP—
Building Lifecycle
All (112)Filed (13)Permit Issued (14)Signed Off (8)Violation (43)Inspection (8)Objection (16)Special Inspection (10)
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/20/2023
Violation issued (HPD, closed)
A
02/01/2023
Signed off — Alteration
B00496622-I1
12/23/2022
Signed off — Alteration
Partial Demo
B00465129-I1
12/23/2022
Permit issued — Structural
B00465129-I1-ST
12/22/2022
Signed off — Alteration
B00253138-I1
12/22/2022
Signed off — Alteration
B00402309-I1
12/22/2022
Signed off — Alteration
Propose Steel structure for 6 stories mixed-use building.
B00396204-I1
12/22/2022
Signed off — Alteration
B00608404-I1
12/15/2022
Signed off — Alteration
install plumbing and fire protection in-conjunction with proposed alteartion
B00253070-I1
10/26/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/19/2022
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
10/17/2022
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/30/2022
Signed off — Alteration
INSTALLATION OF PIPE SCAFFOLD WITH ALTERATION 1#321593851. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00503750-I1
08/26/2022
Inspection — Pass-Final Scaffold Non-Directive 14
Pass
View inspection ↗
04/14/2022
Violation issued (ECB, closed)
Construction
03/21/2022
Permit issued — Sidewalk Shed
B00496622-I1-SH
02/22/2022
Violation issued (HPD, closed)
A
12/14/2021
Permit issued — Mechanical Systems
B00253138-I1-MS
12/14/2021
Permit issued — Construction Fence
B00402309-I1-FN
12/14/2021
Permit issued — Protection and Mechanical Methods
B00608404-I1-PM
12/14/2021
Permit issued — Supported Scaffold
B00503750-I1-SF
12/09/2021
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
12/09/2021
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
12/09/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/09/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
12/01/2021
Filed — Alteration
install plumbing and fire protection in-conjunction with proposed alteartion
B00253070-P1
10/18/2021
Permit issued — Protection and Mechanical Methods
B00608404-I1-PM
10/15/2021
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLD WITH ALTERATION 1#321593851. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00503750-P1
10/08/2021
Filed — Alteration
B00608404-I1
10/06/2021
Filed — Alteration
B00496622-P2
09/30/2021
Filed — Alteration
B00496622-P1
09/28/2021
Violation issued (ECB, closed)
Construction
09/28/2021
Violation issued (ECB, closed)
Construction
09/02/2021
Permit issued — Sprinklers
B00253070-I1-PL
09/02/2021
Permit issued — Plumbing
B00253070-I1-EW-SP
08/23/2021
Violation issued (ECB, closed)
Construction
08/23/2021
Violation issued (ECB, closed)
Construction
08/23/2021
Violation issued (ECB, closed)
Unknown
08/23/2021
Violation issued (ECB, closed)
Construction
08/23/2021
Violation issued (ECB, closed)
Construction
08/20/2021
Violation issued (ECB, closed)
Construction
07/14/2021
Violation issued (ECB, closed)
Construction
07/14/2021
Violation issued (ECB, closed)
Site Safety
07/14/2021
Violation issued (ECB, closed)
Construction
07/14/2021
Violation issued (ECB, closed)
Construction
07/14/2021
Violation issued (ECB, closed)
Construction
07/14/2021
Violation issued (ECB, closed)
Construction
05/25/2021
Permit issued — Supported Scaffold
B00503750-I1-SF
04/23/2021
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLD WITH ALTERATION 1#321593851. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00503750-I1
04/06/2021
Violation issued (HPD, closed)
A
04/05/2021
Permit issued — Sidewalk Shed
B00496622-I1-SH
04/01/2021
Filed — Alteration
B00496622-I1
03/29/2021
Objection resolved — Addressed
03/26/2021
Objection raised — Other
03/24/2021
Violation issued (ECB, closed)
Construction
03/23/2021
Filed — Alteration
Propose Steel structure for 6 stories mixed-use building.
B00396204-P1
Latest 60 of 112 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ROLLIN 32307/08/2026
ROLLIN3LLC1407/08/2026
UNIVERSAL SYSTEMS1303/22/2026
HW DEVELOPMENT CONTRACTIN103/22/2026
KW DEVELOPMENT CONTRACTIN1303/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
A & T ENGINEERING, P.C.812/01/2021
CL ENGINEERING P.C.210/15/2021
NAVI STRUCTURAL ENGINEERING, PLLC310/06/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EUROCELT EXPEDITING, INC603/21/2026
JD DESIGN ASSOCIATES INC403/21/2026
S Y CONSULTING VIOLATIONS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KW DEVELOPMENT CONTRACTINGeneral Contractor1507/08/2026
UNIVERSAL SYSTEMS INCGeneral Contractor603/21/2026
QMB PLUMBING & HEATING INCPlumbing307/08/2026
KJK ELECTRIC INCElectrical103/22/2026
QMB PLUMBING & HTG INCFire Protection107/08/2026
RIGHTWAY ELECTRICAL INCElectrical103/22/2026
ROBERT H LINElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A & T DESIGN GROUP LLC1088512/01/2021
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offKW DEVELOPMENT CONTRACTIN12/23/2022
DOB NOWSidewalk ShedSigned-offUNIVERSAL SYSTEMS INC03/21/2022
DOB NOWMechanical SystemsSigned-offKW DEVELOPMENT CONTRACTIN12/14/2021
DOB NOWConstruction FenceSigned-offKW DEVELOPMENT CONTRACTIN12/14/2021
DOB NOWProtection and Mechanical MethodsSigned-offKW DEVELOPMENT CONTRACTIN12/14/2021
DOB NOWSupported ScaffoldSigned-offKW DEVELOPMENT CONTRACTIN12/14/2021
DOB NOWProtection and Mechanical MethodsSigned-offKW DEVELOPMENT CONTRACTIN10/18/2021
DOB NOWSprinklersSigned-offQMB PLUMBING & HEATING INC09/02/2021
DOB NOWPlumbingSigned-offQMB PLUMBING & HTG INC09/02/2021
DOB NOWSupported ScaffoldSigned-offKW DEVELOPMENT CONTRACTIN05/25/2021
DOB NOWSidewalk ShedSigned-offUNIVERSAL SYSTEMS INC04/05/2021
DOB NOWStructuralPermit IssuedKW DEVELOPMENT CONTRACTIN01/25/2021
DOB NOWMechanical SystemsSigned-offKW DEVELOPMENT CONTRACTIN01/21/2021
DOB NOWConstruction FenceSigned-offKW DEVELOPMENT CONTRACTIN01/15/2021
BIS—ISSUEDKW DEVELOPMENT CONTRACTIN12/13/2021
BIS—RE-ISSUEDKW DEVELOPMENT CONTRACTIN02/23/2021
BIS—ISSUEDKW DEVELOPMENT CONTRACTIN02/11/2021
BIS—ISSUEDSAL MARRA CONST CORP02/01/2000
BIS—ISSUEDZ & L ASSOCIATES, INC.04/14/1993
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
10/26/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/19/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/17/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/26/2022Pass-Final Scaffold Non-Directive 14PassView ↗
12/09/2021Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
12/09/2021Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
12/09/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/09/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
03/23/2021Structural Steel - DetailsROBERT LINspecial
02/22/2021Concrete - Cast-In-PlaceROBERT LINspecial
02/22/2021Structural Cold-Formed SteelROBERT LINspecial
02/22/2021Structural Stability – Alterations of existing buildingsROBERT LINspecial
02/22/2021Structural Steel - High Strength BoltingROBERT LINspecial
02/22/2021Structural Steel - WeldingROBERT LINspecial
02/22/2021FinalROBERT LINprogress
02/22/2021MasonryROBERT LINspecial
02/03/2021Structural Stability – Alterations of existing buildingsROBERT LINspecial
02/03/2021FinalROBERT LINprogress
▾Documents — 257 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch6
09/01/2026B00496622-P1Request digital key ↗
09/01/2026B00496622-I1Request digital key ↗
09/01/2026B00496622-P2Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Structural3
09/01/2026B00465129-I1Request digital key ↗
08/15/2026B00396204-P1Request digital key ↗
08/14/2026B00396204-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler2
09/02/2026B00253070-I1Request digital key ↗
08/15/2026B00253070-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
09/02/2026B00253070-I1Request digital key ↗
08/15/2026B00253070-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/02/2026B00253138-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/02/2026B00402309-I1Request digital key ↗
▸Applications & Permits53
▸BISPLAN / WORK APPROVAL APPLICATION44
06/15/2023321593851Open ↗
06/06/2023321593851Open ↗
06/01/2023321593851Open ↗
Showing 3 of 44 on file for this type
▸BISWORK PERMIT APPLICATION5
06/15/2021321593851Open ↗
06/04/2021321593851Open ↗
02/26/2021321593851Open ↗
Showing 3 of 5 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
05/03/2023322160068Open ↗
03/25/2021340760616Open ↗
▸BISBPP-DOT: SIDEWALK/CURB/ROAD WORK PERMITS1
01/31/2023340760616Open ↗
▸BISPARTIAL DEMO: 10-DAY NOTICE (FOR AL/EW-OT PERMITS)1
02/05/2021321593851Open ↗
▸Zoning, Tax Lot & Property Records8
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT2
05/03/2023322160068Open ↗
09/30/2019321593851Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION2
05/03/2023322160068Open ↗
09/30/2019321593851Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
05/03/2023322160068Open ↗
▸BISVERIFY TAX LOT1
12/22/2022321593851Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
12/15/2022321593851Open ↗
▸BISZONING DIAGRAM1
10/13/2020321593851Open ↗
▸Seals & Professional Certifications24
▸DOB NOWDPL-1: Design Professional Seal & Signature13
09/01/2026B00465129-I1Open ↗
09/01/2026B00496622-P2Open ↗
09/01/2026B00496622-P1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/01/2026B00396204-P1Open ↗
09/01/2026B00396204-P1Open ↗
09/01/2026B00396204-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
09/01/2026B00396204-P1Open ↗
08/26/2026B00465129-I1Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
09/23/2020340760616Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
09/23/2020340760616Open ↗
▸Trade Schedules & Equipment4
▸BISFA - FDNY APPROVAL : FD-FAA1
07/17/2023321593851Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
01/27/2023321593851Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
01/27/2023321593851Open ↗
▸BISSPRINKLER SYSTEMS1
01/27/2023321593851Open ↗
▸Safety & Tenant Protection5
▸BISSTREET TREE CHECKLIST3
11/04/2020340760616Open ↗
09/25/2020321593851Open ↗
07/25/2019321593851Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN2
02/05/2021321593851Open ↗
11/04/2020340760616Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
09/01/2026B00465129-I1Open ↗
08/13/2026B00396204-P1Open ↗
08/13/2026B00396204-I1Open ↗
Showing 3 of 6 on file for this type
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
02/05/2021321593851Open ↗
09/25/2020321593851Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
01/27/2023321593851Open ↗
▸BISINTERIOR LIGHTING POWER1
01/27/2023321593851Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
01/27/2023321593851Open ↗
▸BISFENESTRATION AREAS1
01/27/2023321593851Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
01/27/2023321593851Open ↗
▸BISLIGHTING IN DWELLING UNITS1
01/27/2023321593851Open ↗
▸Inspections & Test Reports20
▸BISTECHNICAL REPORT: RESPONSIBILITY6
04/06/2021321593851Open ↗
04/06/2021321593851Open ↗
02/05/2021321593851Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
02/26/2021321593851Open ↗
02/26/2021321593851Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
04/28/2023321593851Open ↗
02/26/2021321593851Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
01/27/2023321593851Open ↗
▸BISSUBSURFACE / SOILS INVESTIGATION (BORINGS/TEST PITS)1
09/25/2020321593851Open ↗
▸BISSTRUCTURAL STEEL - DETAILS1
01/27/2023321593851Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
01/27/2023321593851Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
01/27/2023321593851Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
01/27/2023321593851Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
01/27/2023321593851Open ↗
▸BISMASONRY1
01/27/2023321593851Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
01/27/2023321593851Open ↗
▸BISSPRAYED FIRE-RESISTANT MATERIALS1
01/27/2023321593851Open ↗
▸Approvals, Objections & Sign-offs27
▸BISSCHEDULE A - OCCUPANCY / USE23
06/15/2023321593851Open ↗
06/06/2023321593851Open ↗
06/01/2023321593851Open ↗
Showing 3 of 23 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
05/03/2023322160068Open ↗
05/26/2020321593851Open ↗
▸BISSUPERSEDING LETTER2
06/15/2021321593851Open ↗
06/04/2021321593851Open ↗
▸Cost, Insurance & Ownership5
▸BISPROJECT-SPECIFIC GL INSURANCE2
02/26/2021321593851Open ↗
02/05/2021321593851Open ↗
▸BISCOST AFFIDAVIT1
09/25/2020321593851Open ↗
▸BISBPP-11 - Affidavit as to Roadway Pavement And/Or Sidewalk and Curb Construction1
01/31/2023340760616Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
12/16/2022321593851Open ↗
▸Filing & Intake Forms22
▸BISADDITIONAL INFORMATION19
06/21/2023321593851Open ↗
02/28/2023321593851Open ↗
02/10/2023321593851Open ↗
Showing 3 of 19 on file for this type
▸BISEFILING COVER SHEET2
04/28/2023322160068Open ↗
09/09/2020321593851Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
09/23/2020340760616Open ↗
▸Other Documents31
▸DOB NOWDHCR Document13
09/01/2026B00465129-I1Open ↗
08/13/2026B00503750-P1Open ↗
08/13/2026B00496622-P1Open ↗
Showing 3 of 13 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION6
01/31/2023340760616Open ↗
01/31/2023340760616Open ↗
01/31/2023340760616Open ↗
Showing 3 of 6 on file for this type
▸BISDHCR DOCUMENT2
09/23/2020340760616Open ↗
05/26/2020321593851Open ↗
▸BISBPP-PARKS: PLANT NEW TREE1
01/31/2023340760616Open ↗
▸BISSHUTOFF DAMPERS1
01/27/2023321593851Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
04/28/2023322160068Open ↗
▸BISEXTERIOR INSULATION AND FINISH SYSTEMS (EIFS)1
01/27/2023321593851Open ↗
▸BISVESTIBULES1
01/27/2023321593851Open ↗
▸BISSTRUCTURAL COLD-FORMED STEEL1
01/27/2023321593851Open ↗
▸BISMAINTENANCE INFORMATION1
01/27/2023321593851Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
11/02/2020340760616Open ↗
▸BISHVAC & SERVICE WATER PIPING DESIGN AND INSULATION1
01/27/2023321593851Open ↗
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
09/01/2026B00465129-I1Open ↗