← Back
Zoned residential, not Manhattan
901 EAGLE AVENUE
BRONX · BIN 2130620
💬 Discuss this project
0Year Built
—Stories
V0Building Class
R6Zoning
0 sfGross Floor Area
0Units
Zoned residential, not Manhattan · Owner of record: NYC HOUSING PRESERVATION AND DEVELOPMENT · 2,500 sf lot · 0 FAR built · Flood zone X
Locations of Work
StructuralMechanicalPlumbingFire Protection
Roof3p · 1 filing · 20 docs
Floor 21p · 1 filing · 20 docs
Floor 1
Cellar2p · 1 filing · 20 docs
1 job · most recent 06/09/2026
Associated Ducts and Piping Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
06/09/2026——Associated Ducts and Piping, Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Friedrich KCQ06A10A 6,000 BTU · Ptac ×1
KCS08A10A 8,000 BTU · Ptac ×1
KCS10A10A 10,000 BTU · Ptac ×1
Laars ×2
1 job · most recent 06/09/2026
FiledStatusContractorScope
06/09/2026———
1 job · most recent 06/09/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
06/09/2026——Gas, Storm, Water/Sanitary
1 job · most recent 06/09/2026
Steel Concrete Masonry
FiledStatusContractorScope
06/09/2026——Steel, Concrete, Masonry
Building Lifecycle
All (94)Filed (7)Objection (57)Special Inspection (30)
07/13/2026
Objection resolved — Addressed
06/22/2026
Objection raised — Scope
06/09/2026
Filed — Alteration
FILING HEREWITH SUPPORT OF EXCAVATION AS PER PLANS IN CONJUNCTION WITH NB 220212650.
X00612118-P1
05/09/2026
Objection raised — Other
05/08/2026
Objection raised — Other
03/02/2026
Objection raised — Other
03/02/2026
Objection resolved — Addressed
02/27/2026
Objection raised — Other
02/27/2026
Objection resolved — Addressed
01/29/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
01/29/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
04/11/2024
Objection raised — Other
04/11/2024
Objection resolved — Addressed
02/15/2024
Objection raised — Other
02/15/2024
Objection resolved — Addressed
10/05/2023
Objection raised — Other
10/05/2023
Objection resolved — Addressed
10/24/2022
Objection raised — Other
10/24/2022
Objection resolved — Addressed
10/24/2022
Objection raised — Other
10/24/2022
Objection resolved — Addressed
10/24/2022
Objection raised — Other
10/24/2022
Objection resolved — Addressed
10/24/2022
Objection raised — Scope
10/24/2022
Objection resolved — Addressed
10/24/2022
Objection raised — Fire_Protection
10/24/2022
Objection resolved — Addressed
10/24/2022
Objection raised — Mechanical
10/24/2022
Objection resolved — Addressed
10/19/2022
Filed — Alteration
FILING HEREWITH SUPPORT OF EXCAVATION AS PER PLANS IN CONJUNCTION WITH NB 220212650.
X00612118-S3
07/12/2022
Objection raised — Energy
07/07/2022
Objection raised — Scope
07/07/2022
Objection resolved — Addressed
07/07/2022
Objection raised — Energy
07/07/2022
Objection resolved — Addressed
07/07/2022
Objection raised — Scope
07/07/2022
Objection resolved — Addressed
07/06/2022
Filed — Alteration
FILING HEREWITH SUPPORT OF EXCAVATION AS PER PLANS IN CONJUNCTION WITH NB 220212650.
X00612118-S4
07/05/2022
Filed — Alteration
FILING HEREWITH SUPPORT OF EXCAVATION AS PER PLANS IN CONJUNCTION WITH NB 220212650.
X00612118-S2
07/05/2022
Filed — Alteration
FILING HEREWITH SUPPORT OF EXCAVATION AS PER PLANS IN CONJUNCTION WITH NB 220212650.
X00612118-S1
07/05/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/01/2022
Objection raised — Structural
07/01/2022
Objection resolved — Addressed
07/01/2022
Objection raised — Fire_Protection
07/01/2022
Objection resolved — Addressed
07/01/2022
Objection raised — Structural
07/01/2022
Objection resolved — Addressed
07/01/2022
Objection raised — Scope
07/01/2022
Objection resolved — Addressed
07/01/2022
Objection raised — Admin
07/01/2022
Objection resolved — Addressed
07/01/2022
Objection raised — Structural
07/01/2022
Objection resolved — Addressed
07/01/2022
Objection raised — Admin
07/01/2022
Objection resolved — Addressed
07/01/2022
Objection raised — Scope
07/01/2022
Objection resolved — Addressed
06/22/2022
Filed — Alteration
FILING HEREWITH SUPPORT OF EXCAVATION AS PER PLANS IN CONJUNCTION WITH NB 220212650.
X00612118-S5
06/21/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/17/2022
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Paul Pizzimenti
Latest 60 of 94 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MHANY MANAGEMENT1308/29/2026
NYC HOUSING PRESERVATION DEVELOP103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ROSENTHAL ENGINEERING PLLC406/09/2026
OLD STRUCTURES ENGINEERING, P.C.207/05/2022
CTC,LLC101/24/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM ZONING, LLC.1203/21/2026
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 31
DateRequirementInspectorRole
01/29/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
01/29/2026HVAC-R and service water piping design and insulation—energy_progress
07/05/2022Fire-Resistant Penetrations and Joints—special
06/21/2022Fire-Resistant Penetrations and Joints—special
06/17/2022Subsurface Investigations (Borings/Test Pits)Paul Pizzimentispecial
06/17/2022Structural Steel - Welding—special
06/17/2022Subgrade Inspections—special
06/17/2022Subsurface Conditions – Fill Placement & In-Place Density—special
06/17/2022Preliminary—progress
06/17/2022Concrete - Cast-In-Place—special
06/17/2022Structural Steel - High Strength Bolting—special
06/17/2022Structural Steel - Welding—special
06/17/2022Subgrade Inspections—special
06/17/2022Subsurface Conditions – Fill Placement & In-Place Density—special
06/17/2022Preliminary—progress
06/17/2022Concrete - Cast-In-Place—special
06/17/2022Excavations - Sheeting, Shoring, and Bracing—special
06/17/2022Masonry—special
06/17/2022Structural Cold-Formed Steel—special
06/17/2022Structural Steel - Details—special
06/17/2022Structural Steel - High Strength Bolting—special
06/13/2022Structural Cold-Formed Steel—special
03/28/2022Sprinkler Systems—special
03/23/2022Footing and Foundation—progress
03/23/2022Masonry—special
Latest 25 of 31.
▾Documents — 43 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/16/2026X00612118-S1Request digital key ↗
08/16/2026X00612118-S2Request digital key ↗
08/15/2026X00612118-S5Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits1
▸BISPLAN / WORK APPROVAL APPLICATION1
12/03/2025220212650Open ↗
▸Zoning, Tax Lot & Property Records2
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
09/26/2024220212650Open ↗
▸BISZONING DIAGRAM1
12/05/2025220212650Open ↗
▸Seals & Professional Certifications8
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/16/2026X00612118-S3Open ↗
08/13/2026X00612118-S4Open ↗
08/13/2026X00612118-S5Open ↗
Showing 3 of 7 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
04/07/2023240345836Open ↗
▸Trade Schedules & Equipment2
▸BISDEP STORMWATER SEWER CERTIFICATION (HCP/SCP)1
09/26/2024220212650Open ↗
▸BISDEP SANITARY SEWER CERTIFICATION (HCP/SCP)1
09/26/2024220212650Open ↗
▸Safety & Tenant Protection4
▸BISSTREET TREE CHECKLIST3
09/26/2024220212650Open ↗
09/26/2024220212650Open ↗
04/07/2023240345836Open ↗
▸BISBPP: STREET TREES SITE PLAN1
04/07/2023240345836Open ↗
▸Energy Compliance1
▸BISTR8: ENERGY CODE PROGRESS INSPS TECHNICAL REPORT1
12/05/2025220212650Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY1
09/26/2024220212650Open ↗
▸BISSOIL REPORT1
09/26/2024220212650Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026X00612118-S1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026X00612118-S1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026X00612118-S1Open ↗
▸Approvals, Objections & Sign-offs10
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter7
08/15/2026X00612118-S3Open ↗
08/13/2026X00612118-I1Open ↗
08/13/2026X00612118-S1Open ↗
Showing 3 of 7 on file for this type
▸BISDESIGN COMM. APPROVAL: CITY-OWNED PROPERTY (EXTERIOR WORK)2
09/26/2024220212650Open ↗
04/07/2023240345836Open ↗
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)1
08/13/2026X00612118-I1Open ↗
▸Filing & Intake Forms1
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
04/07/2023240345836Open ↗
▸Other Documents2
▸BISSUSTAINABLE ROOF ZONE FORM1
09/26/2024220212650Open ↗
▸BISPLOT DIAGRAM1
09/26/2024220212650Open ↗